Search results

1 – 10 of over 1000
Article
Publication date: 16 June 2023

Deniz Avci Hosanli

Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study…

Abstract

Purpose

Despite the quantity of collaborations, the vocational network of the housing production in Ankara during its first five years (1923–1928) remains dispersed. The aim of this study is to identify all the actors of housing production and their collaborations which shaped Ankara's urban development as the new capital city.

Design/methodology/approach

The study engages with the literature and archival documents to identify the actors of the housing production, i.e. architects, master-builders, public institutions, private companies, contractors and entrepreneurs, and their resultant vocational network in the housing production in Ankara during 1923–1928.

Findings

Due to different agendas, such as speculation, financial interests or patriotism, the construction industry in Ankara had become an arena where many paths intersected, forming an intertwined vocational network. The profession of contractor became popular, and local architects, engineers and even individuals of various other professions began to work as mediators for foreign companies and public institutions, which required support especially in large-scale projects.

Originality/value

The dispersed information revealed that the actors of the housing production remained mostly anonymous, or only the famous architects were commemorated; however, others could be found within the lines of the established literature on Ankara and/or in archival documents. This research not only focuses on “salient” actors but also highlights the “silent” actors of the housing production and prepares charts to clarify the vocational network in Ankara during its first five years to contribute to the future studies on Ankara and its housing.

Details

Open House International, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0168-2601

Keywords

Article
Publication date: 26 January 2024

Mohammad Alhusban, Faris Elghaish, M. Reza Hosseini and Mohammad Mayouf

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major…

Abstract

Purpose

Previous studies have established to a great extent that regulatory frameworks and, in particular, procurement approaches – that are common in a particular context – have a major impact on the success of building information modelling (BIM) implementation in construction projects. Despite the close links between these two concepts, research on the effect of procurement approaches on BIM implementation is scarce. To address this gap, this paper aims to investigate the barriers that affect BIM implementation through the lens of procurement approaches.

Design/methodology/approach

A mixed-method approach was adopted using a questionnaire survey (n = 116) and interviews with key stakeholders (n = 12) in Jordan. The outcomes of the quantitative parts were augmented with findings from interviews.

Findings

It was revealed that the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common design-bid-build (DBB) to more collaborative procurement approaches remains infeasible in view of the realities that govern the construction industry.

Research limitations/implications

It was revealed the deployment of unfavourable construction procurement approaches represents a major hurdle towards BIM implementation. Though essential for enhancing BIM implementation, it is revealed that a fundamental change from the common DBB to more collaborative procurement approaches remains infeasible given the realities that govern the construction industry.

Originality/value

As the first of its kind, a set of recommendations for establishing supportive, workable procurement that does not deviate significantly from common procedures and practices is presented. Rather than advocating a shift to procurement approaches that are aligned with BIM, the findings offer novel insight into the necessity of developing a framework within the boundaries of the current and widely adopted procurement approaches to address the identified construction procurement issues and facilitate BIM implementation.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 29 December 2022

Petter Haglund and Martin Rudberg

Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics…

2964

Abstract

Purpose

Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics strategy from a process of establishing fit perspective.

Design/methodology/approach

A large Swedish building contractor's logistics strategy process was analysed using a longitudinal single-case study for a period of 11 years (2008–2019).

Findings

The case study reveals three main constraints to logistics strategy implementation: a dominant purchasing organisation, a lack of incentives and diverging top-management priorities. This suggests that logistics strategy fit is not a conscious choice determined by contextual factors.

Research limitations/implications

Establishing fit is a continuous cycle of regaining fit between the logistics context and logistics strategy components. Fit can be achieved by a change to the logistics context or to logistics strategy components.

Practical implications

Logistics managers may need to opt for satisfactory fit in view of the costs incurred by changing strategy versus the benefits to be gained from a higher degree of fit.

Originality/value

This paper adopts a longitudinal case design to study the fit between the logistics context and strategy, adding to the body of knowledge on organisational design and strategy in logistics and supply chain management.

Details

The International Journal of Logistics Management, vol. 34 no. 7
Type: Research Article
ISSN: 0957-4093

Keywords

Article
Publication date: 8 August 2023

Mengkai Liu and Meng Luo

The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on…

Abstract

Purpose

The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on the cost estimation of prefabricated construction as the research object. This research aims to enhance the accuracy of total project cost estimation for general contractors, ultimately leading to improved profitability.

Design/methodology/approach

This study used Vensim PLE software to establish a system dynamics model. In the modeling process, a systematic research review was used to identify cost-influencing factors; ABC classification and the analytic hierarchy process were used to score and determine the weights of influencing factors.

Findings

The total cost error obtained by the model is less than 2% compared with the actual value. It can be used to cost estimation and analysis. The analysis results indicate that there are 7 key factors, among which the prefabrication rate has the most significant impact. Furthermore, the model can provide the extreme range cost; the minimum cost can reduce by 13% from the value in the case. The factor's value can compose a cost control strategy for general contractors.

Practical implications

The cost of prefabricated buildings can be estimated well, and deciding the prefabrication rate is crucial. The cost can be declined by correct cost control strategies when bidding and subcontracting are in process. The strategies can follow the direction of the model.

Originality/value

A systemic, quantitative and qualitative analysis of cost estimation of prefabricated buildings for general contractors has been conducted. A mathematical model has been developed and validated to facilitate more effective cost-control measures.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 March 2024

Rabbia Aslam Siddiqui, Zulfikar Adamu, Obas John Ebohon and Wajeeha Aslam

The construction industry and its activities harmfully affect the environment. Hence, adopting green building (GRB) practices can be helpful in achieving sustainable development…

Abstract

Purpose

The construction industry and its activities harmfully affect the environment. Hence, adopting green building (GRB) practices can be helpful in achieving sustainable development goals. Therefore, this study aims to identify the factors affecting the intention to adopt GRB practices by extending theory of planned behavior (TPB).

Design/methodology/approach

Using non-probability purposive sampling technique, data was gathered from consultant and contractor engineers in the construction industry through a questionnaire. The analysis was done using partial least square-structural equation modeling technique on a useful sample of 290.

Findings

Findings revealed that the core constructs of TPB [i.e. attitude (AT), subjective norms (SUBN) and perceived behavioral control (PBC)] significantly affect the intention to adopt GRB practices. Moreover, government support and knowledge of green practices (KNGP) were found to be critical influencing factors on AT, SUBNs and PBC. Lastly, the findings confirmed that environmental concerns (ENC) play as a moderating between SUBN and intention to adopt GRB practices, as well as AT and intention to adopt GRB practices.

Practical implications

This study contributes to existing knowledge on GRB, offering evidence base for policy choices regarding climate change adaptation and mitigation in the construction industry.

Originality/value

This study provides insights from the perspective of a developing economy and confirms the applicability of TPB in the adoption of GRB practices. Moreover, this study confirms the moderation role of ENC in between TPB constructs and intention to GRB that is not tested earlier in the context of GRB. This study also confirms that government sustainable support positively affects PBC, and KNGP significantly affects SUBNs.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 23 August 2022

Yixi Zhang, Bee Lan Oo and Benson Teck-Heng Lim

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or…

Abstract

Purpose

Contractors of different scales, operating in different construction industries of varying institutional and economic settings, have different considerations when making bid or no-bid and mark-up decisions. Focusing on the large and medium-sized contractors in the Jilin province, China, the purpose of this study is to examine important factors affecting their decision to bid (d2b) and mark-up decisions and investigate differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Design/methodology/approach

This study used a survey design for timely data collection from a large population. Contractors’ bidding attitudes was collected using an online survey questionnaire with a list of 40 key factors. Statistical analytical methods were applied for comparing the two groups of contractors.

Findings

The results of this study indicate that factors related to client conditions are most critical for both large and medium-sized contractors in their d2b and mark-up decisions. The results also show statistically significant differences between the two groups of contractors on a subset of factors affecting their d2b and mark-up decisions. The large contractors have placed more emphasis on projects' potential financial and strategic benefits. Another notable finding is that both groups of contractors have placed great emphasise on “government legislations” in their d2b and mark-up decisions.

Research limitations/implications

These findings should be interpreted in consideration of several limitations. Firstly, the sample size is relatively small, and the focus was on a single province in the China construction industry. Next, this study only explores differences between large and medium-sized contractors in evaluating the importance of the various factors affecting their d2b and mark-up decisions.

Practical implications

Contractors could refer list of critical factors in competing for jobs in Jilin province or other provinces of similar institutional and economic settings. Construction clients, on the other hand, should consider the list of critical factors in the formulation of their competitive tendering procedures, thus enhancing the efficiency in their procurement of construction services.

Originality/value

Research on contractors’ bidding decision-making in the context of Chinese construction industry remains scarce; the research findings have implications for the industry stakeholders.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 2 February 2024

Justice Williams, Frank Fugar, Emmanuel Adinyira and Kofi Agyekum

Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This…

Abstract

Purpose

Effective safety communication facilitates the sharing of relevant knowledge that helps to improve safety behaviours, such as superior hazard identification and compliance. This study aims to explore channels by which construction companies can effectively communicate health and safety (H&S) among communities of their operations.

Design/methodology/approach

Based on a quantitative research approach, this study addressed the knowledge gap through a cross-sectional survey of 250 contractors (comprising 155 building and 95 road contractors) involved in various projects in the Ghanaian construction industry. These contractors were selected by using a stratified simple random sampling technique. Data obtained from the survey was analysed through descriptive (i.e. frequencies, mean and standard deviation) and inferential (i.e. exploratory factor analysis) statistical analyses.

Findings

The findings from the mean scores revealed that all the 12 communication channels identified in the literature, confirmed through piloting and examined by the respondents, were important channels through which construction companies can effectively communicate H&S amongst communities of their operations. The exploratory factor analysis revealed a clustering of the 12 channels of communication into 5 components: “safety demonstration in the community”; “social media”; “mass media”; “community engagement”; and “opinion leaders”.

Research limitations/implications

This study offers construction project managers the means of managing one of the major stakeholders of a construction project (the community). It provides an actionable opportunity that can be leveraged strategically to integrate community members into projects to promote synergy and local content inclusion while gaining a peaceful atmosphere to achieve their project goals.

Practical implications

Practically, this study provides construction project managers with a means of managing one of the major stakeholders of a construction project (the community) and also demonstrates the integration of community members into projects to promote synergy and local content inclusion. This would give construction organisations a peaceful atmosphere to accomplish their project objectives.

Social implications

The social implication of this study is that the study offers society a means of creating safer Ghanaian communities by offering them the knowledge of identifying hazards and avoiding risky behaviours, creating a good safety atmosphere in these communities.

Originality/value

This study presents construction organisations with a unique opportunity to transfer and share novel external knowledge within a different social system (the community). It contributes to the state-of-the-art knowledge in H&S communication by providing channels through which H&S can be communicated in a developing country such as Ghana.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 March 2024

Duc-Anh Le, Chau Ngoc Dang, Long Le-Hoai and Viet Quoc Hoang

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing…

Abstract

Purpose

Official development assistance (ODA) education projects have played a crucial role in improving education and training fields in developing countries, but are often facing several considerable challenges (e.g. long implementation time). Thus, this study aims to identify critical success factors (CSFs) in ODA education projects and investigate the influences of CSFs on ODA project performance measured by 11 nonprofit outcomes (NPOs).

Design/methodology/approach

A comprehensive literature review and expert interviews were conducted to compile a list of 35 potential success factors for ODA education projects. Using a survey questionnaire, 143 valid responses were collected from practitioners joining ODA projects in Vietnam. Various statistical methods (e.g. mean score method, Spearman rank correlation test, analysis of variance test, factor analysis and regression analysis) were used to analyze the collected data.

Findings

This research identified seven CSFs for ODA education projects in Vietnam: comprehensive project management competency (C1), clarity and compliance in project execution (C2), transparency and committed funding (C3), external context conditions (C4), well-controlled design and project management procedures (C5), preparations in equipment and complexity insight (C6) and punctual site delivery (C7). Furthermore, the results of regression analysis indicated that comprehensive project management competency (C1) and transparency and committed funding (C3) could significantly affect various NPOs.

Originality/value

This study offers significant insights for practitioners (e.g. project managers) to improve ODA projects’ performance and effectiveness in the education and training sector of a developing country context (like Vietnam).

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 17 January 2023

Andrew Ebekozien, Clinton Aigbavboa and Mohamad Shaharudin Samsurijan

Housing provision and the neighbourhood's safety are significant social sustainability concerns. If structural issues are not well checked, housing provision and the…

1764

Abstract

Purpose

Housing provision and the neighbourhood's safety are significant social sustainability concerns. If structural issues are not well checked, housing provision and the neighbourhood's safety may become threatened, especially in Lagos State, Nigeria. Thus, this study aims to investigate the perceived root cause of collapsed buildings at the construction stage using two case studies, its effect on social sustainability aspects and suggested measures to mitigate future happening and enhance achieving social sustainability aspects goals.

Design/methodology/approach

The researchers collected data from Nigeria's built environment experts and eyewitnesses/employees of selected cases of collapsed buildings. The study adopted a phenomenology type of qualitative research design and analysed collated data via thematic analysis and achieved saturation. The analysed data created three themes.

Findings

Results reveal that inadequate heavy equipment and personnel incapacitated relevant government agencies are responsible for handling emergency and rescue during building projects collapse. Preliminary findings show developers' greed and systematic failures as the root cause of Nigeria's building project collapse (BPC). It categorised the root causes into three groups (developer's related-cause, design team related-cause and government entities related-cause). The study suggested measures to mitigate future happening. The emerged measures were grouped into a penalty, regulatory, byelaw act, technical and safety measures.

Originality/value

This study contributes to curbing the threat to social sustainability of housing provision in cities. It reveals the underlying perceived root cause of collapsed buildings in Nigeria's building industry. Also, it suggested feasible measures to mitigate BPC. These measures may be modified and adopted by other developing countries facing similar challenges.

Details

Property Management, vol. 41 no. 3
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 3 July 2023

Chukwuemeka Patrick Ogbu and Edosa Mark Osazuwa

Studies focusing on the growth of indigenous construction firms (ICFs) are getting dated, and unreflective of recent policy changes in developing countries. This study sought to…

Abstract

Purpose

Studies focusing on the growth of indigenous construction firms (ICFs) are getting dated, and unreflective of recent policy changes in developing countries. This study sought to analyze critical barriers to the growth of ICFs and obtain an unsupervised parsimonious grouping of the barriers for policy improvements.

Design/methodology/approach

A mix of quantitative and qualitative research methods was adopted for the study. ICFs in Nigeria were cross-sectionally surveyed based on a set of firm growth barriers obtained from literature and refined by focus group discussion. Descriptive (means, standard deviations, percentages) and inferential (Kruskal-Wallice and Mann-Whitney U test) statistics were used in the analyses of the data. Factor analysis was used to group the variables.

Findings

Results showed that “declining” ICFs are more negatively impacted by low construction mechanization/use of labor intensive methods, inadequate geographical reach of operations, and inadequate flow of jobs/low demand than “stunted” and “growing” ICFs. The three main domains of critical barriers to the growth of ICFs were identified in descending order of importance as low patronage, difficulty accessing funds, and business management incapacity.

Research limitations/implications

The study recommends improvements in access to funds for ICFs by increasing the percentage of advance payments, and creating a pool of equipment for easy hire by ICFs. ICFs are advised to seek information on tendering opportunities outside their regions of domicile in order to increase their patronage.

Originality/value

This study reveals differences in the impacts of growth barriers on ICFs at different growth levels. This study also clarifies persisting barriers to the growth of ICFs [primarily construction micro, small and medium-sized enterprises (MSMEs)] from a developing country perspective using a longer list of variables.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of over 1000