Search results

1 – 10 of 85
Open Access
Article
Publication date: 24 August 2023

Andrew Ebekozien, Wellington Didibhuku Thwala, Clinton Ohis Aigbavboa and Mohamad Shaharudin Samsurijan

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse

Abstract

Purpose

Studies showed that construction digitalisation could prevent or mitigate accidents rate on sites. Digitalisation applications may prevent or mitigate building project collapse (BPC) but with some encumbrances, especially in developing countries. There is a paucity of research on digital technologies application to prevent or mitigate BPC in Nigeria. Thus, the research aims to explore the perceived barriers that may hinder digital technologies from preventing or mitigating building collapse and recommend measures to improve technology applications during development.

Design/methodology/approach

The study is exploratory because of the unexplored approach. The researchers collected data from knowledgeable participants in digitalisation and building collapse in Nigeria. The research employed a phenomenology approach and analysed collected data via a thematic approach. The study achieved saturation at the 29th interviewee.

Findings

Findings show that lax construction digitalisation implementation, absence of regulatory framework, lax policy, unsafe fieldworkers' behaviours, absence of basic infrastructure, government attitude, hesitation to implement and high technology budget, especially in developing countries, are threats to curbing building collapse menace via digitalisation. The study identified technologies relevant to preventing or mitigating building collapse. Also, it proffered measures to prevent or mitigate building collapse via improved digital technology applications during development.

Originality/value

This research contributes to the construction digitalisation literature, especially in developing countries, and investigates the perceived barriers that may hinder digital technologies usage in preventing or mitigating building collapse in Nigeria.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 January 2023

Andrew Ebekozien, Clinton Aigbavboa and Mohamad Shaharudin Samsurijan

Housing provision and the neighbourhood's safety are significant social sustainability concerns. If structural issues are not well checked, housing provision and the…

1746

Abstract

Purpose

Housing provision and the neighbourhood's safety are significant social sustainability concerns. If structural issues are not well checked, housing provision and the neighbourhood's safety may become threatened, especially in Lagos State, Nigeria. Thus, this study aims to investigate the perceived root cause of collapsed buildings at the construction stage using two case studies, its effect on social sustainability aspects and suggested measures to mitigate future happening and enhance achieving social sustainability aspects goals.

Design/methodology/approach

The researchers collected data from Nigeria's built environment experts and eyewitnesses/employees of selected cases of collapsed buildings. The study adopted a phenomenology type of qualitative research design and analysed collated data via thematic analysis and achieved saturation. The analysed data created three themes.

Findings

Results reveal that inadequate heavy equipment and personnel incapacitated relevant government agencies are responsible for handling emergency and rescue during building projects collapse. Preliminary findings show developers' greed and systematic failures as the root cause of Nigeria's building project collapse (BPC). It categorised the root causes into three groups (developer's related-cause, design team related-cause and government entities related-cause). The study suggested measures to mitigate future happening. The emerged measures were grouped into a penalty, regulatory, byelaw act, technical and safety measures.

Originality/value

This study contributes to curbing the threat to social sustainability of housing provision in cities. It reveals the underlying perceived root cause of collapsed buildings in Nigeria's building industry. Also, it suggested feasible measures to mitigate BPC. These measures may be modified and adopted by other developing countries facing similar challenges.

Details

Property Management, vol. 41 no. 3
Type: Research Article
ISSN: 0263-7472

Keywords

Open Access
Article
Publication date: 16 May 2016

Noemi Sinkovics, Samia Ferdous Hoque and Rudolf R. Sinkovics

The purpose of this paper is to investigate the intended and unintended consequences of compliance and auditing pressures in the Bangladeshi garment industry. To explore this…

26022

Abstract

Purpose

The purpose of this paper is to investigate the intended and unintended consequences of compliance and auditing pressures in the Bangladeshi garment industry. To explore this issue the authors draw on three medium-sized suppliers. The institutional changes that followed the Rana Plaza accident in April 2013 make Bangladesh in general and the garment industry in particular an interesting and suitable research setting for standards compliance.

Design/methodology/approach

The study adopts a multiple case study approach. Face-to-face interviews have been conducted with the owners of three Bangladeshi garment manufacturing firms and several workers. Additionally, organisational documents and local newspaper articles had been collected wherever possible.

Findings

The results indicate that the pressure for compliance has led the case companies to prioritise the implementation of measurable standards over the socially grounded needs and priorities of workers. As a consequence certain initiatives instead of adding new social value in fact destroyed previously existing social value. Furthermore, the pressure for compliance created the necessity to find ways to cover the sizable cost of compliance. This prompted firms to pursue process upgrading through technological advancements and increased work pressures on the labour force. These initiatives led to an increased power imbalance and the exclusion of unskilled workers from the job market.

Research limitations/implications

The paper contributes to the understanding of the human rights implications of compliance and auditing pressures and initiatives. Furthermore, in order to further enrich existing knowledge in the critical accounting literature, the study draws on insights from the global value chains (GVC) and international business (IB) literatures.

Originality/value

The paper contributes to the understanding of the human rights implications of compliance and auditing pressures and initiatives. Furthermore, in order to further enrich existing knowledge in the critical accounting literature, the study draws on insights from the GVC and IB literatures.

Details

Accounting, Auditing & Accountability Journal, vol. 29 no. 4
Type: Research Article
ISSN: 0951-3574

Keywords

Open Access
Article
Publication date: 12 October 2021

AbdulLateef Olanrewaju, Jack Son Khor and Christopher Nigel Preece

Statistics show that the construction sector has the second-highest number of accident cases in Malaysia. A total of 100, 000 construction workers suffer from work-related bad…

4577

Abstract

Purpose

Statistics show that the construction sector has the second-highest number of accident cases in Malaysia. A total of 100, 000 construction workers suffer from work-related bad health each year. Scaffolding accidents are the second cause of accidents on construction sites. Therefore, this present research provided answers to the following questions: (1) what are the causes of scaffolding accidents and (2) what are the possible measures to reduce scaffolding accidents?

Design/methodology/approach

The research developed a questionnaire instrument that included 24 causes of scaffolding accidents and 21 remedial actions. The research was based on a cross-sectional survey questionnaire administered to 129 members of construction organizations.

Findings

Data revealed that scaffolding-related cases caused a total of 70% of the deaths/injuries on sites. Furthermore, scaffolding accidents were mainly caused by a lack of guard rails on scaffoldings, poor inspections, improper assembly, a poor safety culture, poor attitudes towards safety, poor footing of scaffoldings and unsecured planking. To reduce scaffolding accidents, there must be a lifeline on scaffolding, proper guardrails and proper assembling of scaffoldings, and preventing access to incomplete or defective scaffoldings. The 24 causes are structured into six factors through factor analysis and the 21 remedial actions into six factors.

Originality/value

This research serves as the first attempt to conduct broad research on the causes and remedial actions concerning scaffolding accidents on construction sites in Malaysia. Theoretically, the research has provided fresh insights into the impact of scaffolding accidents.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 1
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 21 May 2018

Jue Li, Minghui Yu and Hongwei Wang

On shield tunnel construction (STC) site, human error is widely recognized as essential to accident. It is necessary to explain which factors lead to human error and how these…

1765

Abstract

Purpose

On shield tunnel construction (STC) site, human error is widely recognized as essential to accident. It is necessary to explain which factors lead to human error and how these factors can influence human performance. Human reliability analysis supports such necessity through modeling the performance shaping factors (PSFs). The purpose of this paper is to establish and validate a PSF taxonomy for the STC context.

Design/methodology/approach

The approach taken in this study mainly consists of three steps. First, a description of the STC context is proposed through the analysis of the STC context. Second, the literature which stretch across the PSF methodologies, cognitive psychology and human factors of STC and other construction industries are reviewed to develop an initial set of PSFs. Finally, a final PSF set is modified and validated based on STC task analysis and STC accidents cases.

Findings

The PSF taxonomy constituted by 4 main components, 4 hierarchies and 85 PSFs is established for human behavior modeling and simulation under the STC context. Furthermore, by comparing and evaluating the performance of STC PSF and existing PSF studies, the proposed PSF taxonomy meets the requirement for qualitative and quantitative analysis.

Practical implications

The PSF taxonomy can provide a basis and support for human behavior modeling and simulation under the STC context. Integrating PSFs into a behavior simulation model provides a more realistic and integrated assessment of human error by manifesting the influence of each PSFs on the cognitive processes. The simulation results can suggest concrete points for the improvement of STC safety management.

Originality/value

This paper develops a taxonomy of PSFs that addresses the various unique influences of the STC context on human behaviors. The harsh underground working conditions and diverse resources of system information are identified as key characteristics of the STC context. Furthermore, the PSF taxonomy can be integrated into a human cognitive behavior model to predict the worker’s behavior on STC site in future work.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 17 November 2023

Matthew Ikuabe, Clinton Aigbavboa and Ernest Kissi

In most developing countries, the delivery of construction project is still characterised by inefficiencies resulting from the use of outdated methods and techniques, which…

Abstract

Purpose

In most developing countries, the delivery of construction project is still characterised by inefficiencies resulting from the use of outdated methods and techniques, which retards project performance. Hence, the call for the implementation of innovative technologies such as humanoids in the execution of construction projects as it has been proven to be very effective in other sectors while improving productivity and quality of work. Consequently, this study looks at how humanoids can be used in the construction industry and what benefits they can bring.

Design/methodology/approach

The study employed a quantitative approach underpinned in post-positivist philosophical view using questionnaire as the instrument for data collection. The target respondents were construction professionals, and purposive sampling was used, while a response rate of 62.5% was gotten. The methods of data analysis were mean item score, standard deviation and one-sample t-test.

Findings

The findings revealed that humanoids can be used in progress tracking, auto-documentation and inspection and surveillance of tasks in construction activities. Also, the most important benefits of using humanoids in construction work were found to be shorter delivery times, fewer injuries and more accurate work.

Practical implications

The outcome of the study gives professionals and relevant stakeholders in construction and other interested parties' information about the areas where humanoids can be used and their benefits in construction.

Originality/value

The novelty of this study is that it is a pioneering study in South Africa on humanoids' usage in the construction industry. Also, it expands the existing borderline of the conservation of construction digitalisation for enhanced project execution.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 22 February 2022

AbdulLateef Olanrewaju and Hui Jing Alice Lee

Poor quality in building projects is high and increasing. Poor quality can increase the cost of a building by up to more than 50% and can delay a project by up to 50%. This…

6648

Abstract

Purpose

Poor quality in building projects is high and increasing. Poor quality can increase the cost of a building by up to more than 50% and can delay a project by up to 50%. This research investigated the poor quality of building elements/components.

Design/methodology/approach

The site operatives were requested to rate the frequency of poor quality in 25 building elements/components. The frequencies of the poor quality were scored on a five-point Likert scale, ranging from least often to extremely often. The survey forms were administered to construction site operatives by hand delivery.

Findings

The data revealed that poor quality occurred in more than 80% of the building projects completed. Approximately 40% of the cost of a building project is attributed to poor quality. In total, 70% of the respondents measured the poor quality of building elements as being high and frequent. The size and frequency of poor quality are higher in concrete, plaster, brick, foundations and roof trusses.

Practical implications

The research findings would help to reduce claims, disputes, maintenance costs and waste on sites.

Originality/value

This research provides fresh information on poor quality in building projects and provides a systemic process for anticipating poor quality in building projects. The findings also provide an option to increase maintenance span and a means to reduce claims and disputes in the construction sector.

Details

Frontiers in Engineering and Built Environment, vol. 2 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 19 April 2023

Hasina Tabassum Chowdhury, Shuva Ghosh, Shaim Mahamud, Fazlul Hasan Siddiqui and Sabah Binte Noor

The earth is facing challenges to work for the survival of human life during domino effect disasters. The emergency resource storage locations should be selected considering the…

Abstract

Purpose

The earth is facing challenges to work for the survival of human life during domino effect disasters. The emergency resource storage locations should be selected considering the probability of domino effect disasters. The first purpose of this study is to select the storage locations where domino effect probability is less. And second, facility development cost and transportation costs and costs for unutilized capacity have been optimized.

Design/methodology/approach

The work is a multiobjective optimization problem and solved with weighted sum approach. At first, the probabilities of domino effect due to natural disasters are calculated based on the earthquake zones. Then with that result along with other necessary data, the location to set up storage facilities and the quantities of resources that need to be transported has been determined.

Findings

The work targeted a country, Bangladesh for example. The authors have noticed that Bangladesh is currently storing relief items at warehouse which is under the domino effect prone region. The authors are proposing to avoid this location and identified the optimized cost for setting up the facilities. In this work, the authors pointed out which location has high probability of domino effect and after avoiding this location whether cost can be optimized, and the result demonstrated that this decision can be economical.

Originality/value

Disaster response authorities should try to take necessary proactive steps during cascading disasters. The novelty of this work is determining the locations to select storage facilities if the authors consider the probability of the domino effect. Then a facility location optimization model has been developed to minimize the costs. This paper can support policymakers to assess the strategies for selecting the location of emergency resource facilities.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 4
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 31 March 2023

Jonas Schwarz, Valentina Kascel, Muhammad Azmat and Sebastian Kummer

This study aims to compare the humanitarian supply chains and logistics of two countries in earthquake preparedness by modifying and using a previously established preparedness…

2097

Abstract

Purpose

This study aims to compare the humanitarian supply chains and logistics of two countries in earthquake preparedness by modifying and using a previously established preparedness evaluation framework.

Design/methodology/approach

A European flood emergency management system (FEMS) is a seven-dimensional framework to assess a country’s preparedness for flood emergencies. The FEMS framework was modified to apply to earthquakes. Leveraging a multiple explanatory case study approach with data analysis, the authors reconstructed the events of the earthquakes in Pakistan (2005) and Japan (2011) with an applied grading (1–5). Findings were evaluated within the adopted FEMS framework. From a practitioner’s perspective, the framework is applicable and can accelerate support in the field.

Findings

Pakistan lacked emergency plans before the 2005 earthquake. In contrast, Japan possessed emergency plans before the disaster, helping minimise casualties. Overall, Japan demonstrated considerably better emergency management effectiveness. However, both countries significantly lacked the distribution of responsibilities among actors.

Originality/value

Practical factors in the humanitarian supply chain are well understood. However, synthesising individual factors into a comprehensive framework is difficult, which the study solves by applying and adopting the FEMS framework to earthquakes. The developed framework allows practitioners a structured baseline for prioritising measures in the field. Furthermore, this study exemplifies the usefulness of cross-hazard research within emergency management and preparedness in a real-world scenario.

Details

Journal of Humanitarian Logistics and Supply Chain Management, vol. 13 no. 3
Type: Research Article
ISSN: 2042-6747

Keywords

Open Access
Article
Publication date: 4 May 2021

Osama F. Al Kurdi

The Arab world is made up of 22 countries in the Middle East and North Africa. These countries are subjected to many social, economic, political and geographical vulnerabilities…

7231

Abstract

Purpose

The Arab world is made up of 22 countries in the Middle East and North Africa. These countries are subjected to many social, economic, political and geographical vulnerabilities contributing to increased risks or ineffective emergency and disaster management. This paper examines these vulnerabilities, how they may impact the country's ability to face disasters, and how they can improve disasters' overall management.

Design/methodology/approach

The author selected Qatar, Oman to represent the Arab oil-rich countries, while Jordan, Egypt and Morocco to represent non-oil rich countries. The research was conducted in a qualitative, inductive systematic literature review based on a well-established systematic literature review methodology. Selected literature was based on its recency and the countries in question.

Findings

The review reveals population gaps that could threaten the social system in the event of a disaster in countries like Qatar and Oman. The majority of the countries lack community engagement and pre-planning for emergency preparedness due to social and cultural barriers. Other nations like Jordan, Egypt and Morocco are prone to long-lasting economic challenges due to lack of resources, mismanagement or corruption. The paper also highlights the need to raise the educational attainment among citizens to understand disaster risk reduction.

Originality/value

This study utilized the research method developed by Williams et al. (2017) to present a comprehensive systematic and comparative review of disaster management in the Arab world. Considering that disaster and emergency management has remained disproportionately unexplored in the Arab world, this paper reviewed several vulnerabilities and how those vulnerabilities may affect disaster and emergency management efforts in the Arab countries.

Details

Journal of Business and Socio-economic Development, vol. 1 no. 1
Type: Research Article
ISSN: 2635-1374

Keywords

1 – 10 of 85