Search results

1 – 7 of 7
Article
Publication date: 8 April 2024

Hasith Chathuranga Victar and Anuradha Samarajeewa Waidyasekara

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address…

Abstract

Purpose

Construction and Demolition (C&D) Waste Management (WM) poses significant challenges in Sri Lanka, contributing to environmental degradation and resource depletion. To address these issues, this study explores the application of Circular Economy (CE) strategies in minimising waste generation and optimising resource utilisation in Sri Lankan construction industry. The research focuses on the construction and building renovation and use and operate stages of the building project life cycle, recognising their significance in waste generation and resource consumption.

Design/methodology/approach

The research employed a qualitative approach, utilising the Delphi technique through three rounds of expert interviews. Seventeen experts were involved in the first round, followed by fifteen in the second round, and twelve in the final round. The collected data was analysed using manual content analysis methods.

Findings

The research findings revealed fifteen C&D WM issues in the construction and building renovation stage in Sri Lanka, along with suitable strategies to overcome each of them. Similarly, eight C&D WM issues were identified for the use and operate stage of the building, and corresponding strategies were provided to address each issue. By adopting CE strategies such as modular design and material reuse, construction projects can optimise the project's timeline, cost, and quality factors. These strategies enable efficient resource allocation, reduce waste generation, and contribute to the overall sustainability of the project. The impact of CE strategies on mitigating these issues within the project management iron triangle was also discussed.

Originality/value

This paper entails delving into how construction, building renovation, and operation stages of a building's life cycle intersect with CE strategies, which profoundly influence operational efficiency and long-term sustainability. By incorporating principles such as energy efficiency, water conservation, and circular product design, the paper illuminates how these strategies facilitate decreased energy usage, enhanced resource management, and diminished waste production throughout the building's lifespan.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 September 2023

Hazel Easthope, Laura Crommelin, Charles Gillon, Simon Pinnegar, Kristian Ruming and Sha Liu

High-density development requires large land parcels, but fragmented land ownership can impede redevelopment. While earlier compact city development in Sydney occurred on…

Abstract

Purpose

High-density development requires large land parcels, but fragmented land ownership can impede redevelopment. While earlier compact city development in Sydney occurred on large-scale brownfield sites, redeveloping and re-amalgamating older strata-titled properties is now integral to further densification. The purpose of this study is to examine collective sales activity in one Sydney suburb where multiple strata-titled redevelopments and re-amalgamations have been attempted. The authors explore how owners navigate the process of selling collectively, focusing on their experience of legislation introduced to facilitate this process, the Strata Schemes Development Act 2015 [New South Wales (NSW)].

Design/methodology/approach

By reviewing sales listings, development applications and media coverage, and interviewing owners, lawyers and estate agents, the authors map out collective sale activity in a case study area in Sydney’s northwest.

Findings

Strata collective sales are slow and difficult to complete, even when planning and market drivers align. Owners find the Strata Scheme Development Act 2015 (NSW) difficult to navigate and it has not prevented strategic blocking attempts by competing developers. The long timelines required to organise collective sales can result in failure if the market shifts in the interim. Nonetheless, owners remain interested in selling collectively.

Originality/value

This case study is important for understanding the barriers to redevelopment to achieve a more compact city. It highlights lessons for other jurisdictions considering similar legislative changes. It also suggests that legislative change alone is insufficient to resolve the planning challenges created by hyper-fragmentation of land through strata-title development.

Details

Journal of Property, Planning and Environmental Law, vol. 16 no. 1
Type: Research Article
ISSN: 2514-9407

Keywords

Expert briefing
Publication date: 23 April 2024

With the economy a central issue for many voters, Biden is stressing his administration’s focus on place-based economic development (PBED), an approach to shaping the economic…

Details

DOI: 10.1108/OXAN-DB286564

ISSN: 2633-304X

Keywords

Geographic
Topical
Article
Publication date: 26 January 2022

Sara Pau, Giulia Contu and Vincenzo Rundeddu

This study aims to explore how closed factories could be transformed and provide a path for sustainable development for a territory. The authors focus on the case of the Great…

169

Abstract

Purpose

This study aims to explore how closed factories could be transformed and provide a path for sustainable development for a territory. The authors focus on the case of the Great Mine Serbariu, located in Carbonia (Sardinia), which used to be the largest coal mine in Italy between 1939 and 1964.

Design/methodology/approach

The authors adopt a qualitative research design based on an exploratory single-case study, drawing on interviews with the main stakeholders, on a survey conducted among 5,158 visitors, and on administrative documentation of the City Council.

Findings

The analysis of the Great Mine Serbariu case showed that the regeneration of an exhausted mine serves a model of sustainable development, especially for the redevelopment of other urban and industrial degraded areas. The Great mine Serbariu was restored and turned into a place of culture, tourism, research and higher education, with the Italian Cultural Centre of Coal Mining (ICCCM) establishing its headquarters in the heart of the former mine. It attracted almost 220,000 visitors, generating both domestic and international tourist flows and making an industrial heritage a real resource for the area.

Originality/value

This article advances the authors’ understanding of how closed industries could become an instrument for sustainable development on the social, economic, touristic and cultural levels. This study would help local governments with examples to enhance the historical resources to create a new identity that led to a sustainable development of an urban landscape, and to create networks with other comparable museums all over Europe to better exploit the touristic and cultural potential.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. 14 no. 2
Type: Research Article
ISSN: 2044-1266

Keywords

Open Access
Article
Publication date: 24 April 2024

Greg Richards

This paper aims to consider the relationship between urban events and urban public space, asking whether cities have enough space for events and whether events have enough space…

Abstract

Purpose

This paper aims to consider the relationship between urban events and urban public space, asking whether cities have enough space for events and whether events have enough space in cities.

Design/methodology/approach

Policy analysis surrounding events and festivals in the Netherlands is used to understand the dynamics of urban events, supported by content analysis of policy documents. A vignette of event space struggles in Amsterdam illustrates the contradictions of the event/space relationship.

Findings

The research identifies a policy shift in the Netherlands towards urban events from expansive, festivalisation strategies to defensive, NIMBYist policies. It exposes contradictions between protecting space as a living resource and the exploitation of space for regenerative purposes. Three future scenarios for urban events are outlined: conflict and competition, growth and harmony and digitalisation and virtualisation.

Practical implications

Develops scenarios for the future relationship between events and urban space.

Originality/value

Provides an analysis of the recursive spatial implications of the growth of the events sector for cities and the growth of cities for events.

Details

International Journal of Tourism Cities, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2056-5607

Keywords

Open Access
Article
Publication date: 22 March 2024

Peter E. Johansson, Jessica Bruch, Koteshwar Chirumalla, Christer Osterman and Lina Stålberg

The purpose of this paper is to advance the understanding of paradoxes, underlying tensions and potential management strategies when integrating digital technologies into existing…

Abstract

Purpose

The purpose of this paper is to advance the understanding of paradoxes, underlying tensions and potential management strategies when integrating digital technologies into existing lean-based production systems (LPSs), with the aim of achieving synergies and fostering the development of production systems.

Design/methodology/approach

This study adopts a collaborative management research (CMR) approach to identify patterns of organisational tensions and paradoxes and explore management strategies to overcome them. The data were collected through interviews and focus group interviews with experts on lean and/or digital technologies from the companies, from documents and from workshops with the in-case researchers.

Findings

The findings of this paper provide insights into the salient organisational paradoxes embraced in the integration of digital technologies in LPS by identifying different aspects of the performing, organising, learning and belonging paradoxes. Furthermore, the findings demonstrate the intricacies and relatedness between different paradoxes and their resolutions, and more specifically, how a resolution strategy adopted to manage one paradox might unintentionally generate new tensions. This, in turn, calls for either re-contextualising actions to counteract the drift or the adoption of new resolution strategies.

Originality/value

This paper adds perspective to operations management (OM) research through the use of paradox theory, and we (1) provide a fine-grained perspective on why integration sometimes “fails” and label the forces of internal drift as mechanisms of imbalances and (2) provide detailed insights into how different management and resolution strategies are adopted, especially by identifying re-contextualising actions as a key to rebalancing organisational paradoxes in favour of the integration of digital technologies in LPSs.

Details

International Journal of Operations & Production Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3577

Keywords

Article
Publication date: 28 March 2022

Muhammad Ayat, Azmat Ullah and Changwook Kang

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects…

Abstract

Purpose

The primary purpose of this study is to explore the relationship between the unsolicited proposal (USP) and the performance of private participation infrastructure (PPI) projects in developing countries.

Design/methodology/approach

The main data set for this study was collected from the World Bank database consisting of 8,951 PPI projects that occurred in developing countries from 1996 to 2020. Hierarchical logistic regression was applied for investigating the effects of USPs on project success. Three moderators, namely, control of corruption, presence of local sponsor and project size were also included in the model to test the impact of their interactions with the USP on the performance of PPI projects. Further, to assess the impact of the effect of USPs, the average marginal effect was calculated. The framework used in this study consists of 18 control variables, three moderators and one noncontrolled independent variable (the USP).

Findings

The results of hierarchical logistic regression indicate that USPs have a significant and negative effect on the success of PPI projects occurring in developing countries. The negative effect of a USP weakens with the presence of local sponsors and stronger control of corruption in the host country. However, contrary to the authors’ expectations, the results show that project size does not significantly affect the association between USPs and the success of PPI projects. Moreover, the results of average marginal effects show that the negative impact of USP on the success of PPI projects ranges between 2.4% and 3.8%.

Originality/value

This study quantifies the negative impact of USP on the success of PPI projects in developing countries, which will be helpful for the practitioners to understand the associated risk with USP projects. Furthermore, it also identifies the moderating roles of control of corruption and the presence of local sponsors on the relationship between USP and the success of PPI projects.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 7 of 7