Search results

1 – 6 of 6
Article
Publication date: 14 September 2023

Kangning Liu, Bon-Gang Hwang, Jianyao Jia, Qingpeng Man and Shoujian Zhang

Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus…

Abstract

Purpose

Informal learning networks are critical to response to calls for practitioners to reskill and upskill in off-site construction projects. With the transition to the coronavirus disease 2019 (COVID-19) pandemic, social media-enabled online knowledge communities play an increasingly important role in acquiring and disseminating off-site construction knowledge. Proximity has been identified as a key factor in facilitating interactive learning, yet which type of proximity is effective in promoting online and offline knowledge exchange remains unclear. This study takes a relational view to explore the proximity-related antecedents of online and offline learning networks in off-site construction projects, while also examining the subtle differences in the networks' structural patterns.

Design/methodology/approach

Five types of proximity (physical, organizational, social, cognitive and personal) between projects members are conceptualized in the theoretical model. Drawing on social foci theory and homophily theory, the research hypotheses are proposed. To test these hypotheses, empirical case studies were conducted on two off-site construction projects during the COVID-19 pandemic. Valid relational data provided by 99 and 145 project members were collected using semi-structured interviews and sociometric questionnaires. Subsequently, multivariate exponential random graph models were developed.

Findings

The results show a discrepancy arise in the structural patterns between online and offline learning networks. Offline learning is found to be more strongly influenced by proximity factors than online learning. Specifically, physical, organizational and social proximity are found to be significant predictors of offline knowledge exchange. Cognitive proximity has a negative relationship with offline knowledge exchange but is positively related to online knowledge exchange. Regarding personal proximity, the study found that the homophily effect of hierarchical status merely emerges in offline learning networks. Online knowledge communities amplify the receiver effect of tenure. Furthermore, there appears to be a complementary relationship between online and offline learning networks.

Originality/value

Proximity offers a novel relational perspective for understanding the formation of knowledge exchange connections. This study enriches the literature on informal learning within project teams by revealing how different types of proximity shape learning networks across different channels in off-site construction projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 October 2022

Na Zhang, Bon-Gang Hwang, Xiaopeng Deng and Fiona Tay

The Singapore construction sector is promoting performance improvement by implementing collaborative contracting (CC). For CC's successful implementation, there is a need to sieve…

Abstract

Purpose

The Singapore construction sector is promoting performance improvement by implementing collaborative contracting (CC). For CC's successful implementation, there is a need to sieve out the critical success factors (CSFs). Hence, this paper aims to explore factors influencing the adoption of CC and investigate the potential performance improvement by implementing CC.

Design/methodology/approach

Based on the literature review, 23 CSFs were identified and packaged to a questionnaire to evaluate the CSF's priority as well as CC's potential impact on the project performance. After prior validation, 165 potential respondents were drawn from survey list by using simple random sampling. Finally, 31 valid responses were received.

Findings

The survey result showed that the top five CSFs are mutual trust, all parties to commit fully, openness between parties, commitment to a win–win attitude and resource availability. The majority of respondents hold that CC implementation would improve overall project performance, decision effectiveness, cost, time, quality and risk performance.

Research limitations/implications

Directors, project managers, contractor managers and site engineers have different perceptions of CSFs. Also rather than meeting the same requirements in the implementation of CC, there are differences among projects with different values.

Originality/value

This study provides an in-depth understanding of the CSFs for industry practitioners adopting CC and CC's potential impact on project performance. This study is also helpful for authorities to formulate effective policies to push the implementation of CC.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 February 2024

Luwei Zhao, Qing’e Wang, Bon-Gang Hwang and Alice Yan Chang-Richards

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification…

Abstract

Purpose

The purpose of this study is to develop a new hybrid method that combines interpretative structural modeling (ISM) and matrix cross-impact multiplication applied to classification (MICMAC) to investigate the influencing factors of sustainable infrastructure vulnerability (SIV).

Design/methodology/approach

(1) Literature review and case study were used to identify the possible influencing factors; (2) a semi-structured interview was conducted to identify representative factors and the interrelationships among influencing factors; (3) ISM was adopted to identify the hierarchical structure of factors; (4) MICMAC was used to analyze the driving power (DRP) and dependence power (DEP) of each factor and (5) Semi-structured interview was used to propose strategies for overcoming SIV.

Findings

Results indicate that (1) 18 representative factors related to SIV were identified; (2) the relationship between these factors was divided into a five-layer hierarchical structure. The 18 representative factors were divided into driving factors, dependent factors, linkage factors and independent factors and (3) 12 strategies were presented to address the negative effects of these factors.

Originality/value

The findings illustrate the factors influencing SIV and their hierarchical structures, which can benefit the stakeholders and practitioners of an infrastructure project by encouraging them to take effective countermeasures to deal with related SIVs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 28 December 2023

Min Luo, Bon-Gang Hwang, Xianbo Zhao and Xiaopeng Deng

This study aims to clarify the psychological mechanism of international contractors' fraud by linking performance pressure to fraudulent intention through the displacement of…

Abstract

Purpose

This study aims to clarify the psychological mechanism of international contractors' fraud by linking performance pressure to fraudulent intention through the displacement of responsibility and addressing the moderating role of moral intensity.

Design/methodology/approach

Based on moral disengagement theory, performance pressure was hypothesized to be positively associated with fraudulent intention by mediating the displacement of responsibility. Drawing on the issue-contingent theory, moral intensity was hypothesized to inhibit the relationship between performance pressure and displacement of responsibility in three aspects: magnitude of consequences (MC), probability of effect (PE) and social consensus (SC). The scenario-based questionnaire was conducted to collect information from contractors spread across 50 countries. The partial least squares structural equation modeling was employed to assess the proposed model.

Findings

The results demonstrated that performance pressure was positively associated with the fraudulent intention, and displacement of responsibility exerted a positive partial mediating impact between performance pressure and fraudulent intention. Regarding moral intensity in the moderating analysis, the negative moderating role of MC and PE was significant, while that of SC was insignificant.

Practical implications

This study provides international construction practitioners with a deep understanding of the formation mechanism of fraud at the psychological level.

Originality/value

It clarifies the psychological mechanism from performance pressure to fraudulent intention by integrating a mediation impact from the displacement of responsibility and a moderation effect from MC and PE. It contributes to the sparse research on how situational factors shape individuals' fraudulent intentions in the international context. It provides a fresh perspective on fraud by constructing a formation model from moral psychological theories.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 September 2023

Jianyao Jia, Ming Wu and Bon-Gang Hwang

Although previous research has recognized the pivotal role of mobile social media in knowledge sharing among project members, little is known about what factors affect knowledge…

Abstract

Purpose

Although previous research has recognized the pivotal role of mobile social media in knowledge sharing among project members, little is known about what factors affect knowledge sharing in mobile social media groups (MSMGs). Against this background, using normative social influence theory, this study attempts to explore factors influencing knowledge sharing in MSMGs.

Design/methodology/approach

Data from 205 Chinese construction project members are collected and used for analysis. Ordinary least squares regression by Stata 16 is used to test the proposed hypotheses.

Findings

Concerning role norms, gender difference in knowledge sharing behavior (KSB) is found, while it is not the case for knowledge quality (KQ). Work experience is found to positively affect KQ, but shows no influence on KSB. As for group norms, the inverted-U relationship between number of members and KSB is partially supported. In addition, organizational norms generally exhibit the greatest influence on both KSB and KQ among the three forms of norms.

Originality/value

This study deepens the understanding of knowledge sharing factors in mobile social media environments and affords practical implications for how to make full use of social media for knowledge management within construction project teams.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 January 2024

Dillip Kumar Das

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project…

Abstract

Purpose

The delay in real estate projects in India is pervasive. Organization and management (O&M) and project management (PM)-related challenges are argued to contribute to project delays. This study examined the O&M and PM factors that cause delays, the level of implementation of various O&M and PM aspects in real estate projects and how the challenges can be alleviated.

Design/methodology/approach

Perception surveys among the consumers and relevant stakeholders engaged in real estate projects in the Bhubaneswar and Cuttack regions of India were conducted to collect data on the factors of delay and implementation of the O&M and PM aspects. Relevant statistical methods and structural equation modeling (SEM) were used for data analysis.

Findings

Findings suggest that from the O&M point of view, poor decision-making, mishandling of finance, concurrent execution of many projects, diversion and misuse of finance for unrelated activities, lack of PM personnel and poor management contribute to the delay. Further, although the project initiation is satisfactorily done, most of the PM principles are not largely used, thus leading to delay.

Research limitations/implications

The study does have limitations, including its reliance on a perception survey of consumers and stakeholders, a limited sample size and a restricted number of projects. Nevertheless, the study highlights the need to address poor O&M and the insufficient application of PM principles to combat project delays in the Indian real estate sector.

Practical implications

Proper O&M and adequate application of PM will enable professional management of the projects and avoid delay.

Social implications

Proper O&M and the application of adequate PM would reduce delays in real estate projects. Consequently, conflicts between the companies and consumers might be reduced and housing and infrastructure demands might be met.

Originality/value

The study manifested that the lack of adequate implementation of O&M and PM aspects leads to delays. So, it is theorized that O&M and PM play critical roles in the success of real estate projects. Appropriate implementation of the principles and best practices linked to these aspects might alleviate the challenges of delay in real estate projects in India.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 6 of 6