Article
Publication date: 1 July 2014

Aviad Shapira, Sagi Filin and Amit Wicnudel

– This study aims to show how laser scanning data can be utilised to quantitatively assess “blind lifts” with respect to their rate and spatial distribution.

1062

Abstract

Purpose

This study aims to show how laser scanning data can be utilised to quantitatively assess “blind lifts” with respect to their rate and spatial distribution.

Design/methodology/approach

This study employed time study of crane cycles for quantitative measuring of the crane’s work periods in dead areas and mapping the crane operator’s field of view and developing a model that allows the spatial analysis of blind lifts.

Findings

This study found a discrete geometric laser scan-based model that is capable of locating and quantifying the visible and invisible zones from the crane operator’s cabin; 28 per cent of the analyzed crane’s work area represented by the model were found to be invisible, which corresponds fairly to 35 per cent of the half-cycles measured manually that were found to involve blind lifting; the range of blind lifts duration derived from the spatial information-based model was 50 to 84 per cent, which is in excellent correspondence with the 54 per cent to 82 per cent range obtained from the time unit-based analysis.

Research limitations/implications

The laser-based model and the ensuing analyses are limited to the type of buildings whose envelope can practically be represented by the vertical extrusion of their footprint.

Practical implications

The practical implications of the study are reduction of blind lifts as a factor when selecting the location of the crane and staging areas; more effective preplanning of signallers positioning; and ad hoc consideration of analysed dead space for various lift task-based decision-making during construction.

Originality/value

This study demonstrates the ability to capture the geometric relations that characterise the work scene around the tower crane by harnessing the increasingly available laser technology and correlates the results of the manual observations with those obtained from the laser-based model.

Details

Construction Innovation, vol. 14 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 18 June 2021

Zhiqian Zhang, Wei Pan and Mi Pan

Modular integrated construction (MiC) is the most advanced off-site construction technology. However, the application of MiC for high-rise buildings is still limited and…

Abstract

Purpose

Modular integrated construction (MiC) is the most advanced off-site construction technology. However, the application of MiC for high-rise buildings is still limited and challenging. One critical issue is tower crane layout planning (TCLP) to guarantee safe and efficient multiple crane-lifts for module installation, which, however, has been insufficiently explored. For filling this knowledge gap, this paper aims to systematically explore the critical considerations on TCLP for high-rise MiC to support contractors in determining the optimal crane layout plan.

Design/methodology/approach

This study employed a multimethod strategy. First, previous studies on TCLP and critical features of MiC were reviewed to develop a conceptual model of TCLP considerations. Second, expert interviews with 15 construction planners were conducted to identify the critical TCLP considerations for high-rise MiC. Third, a multicase study with three high-rise MiC projects was undertaken to demonstrate and verify the identified considerations.

Findings

The paper characterises critical considerations on TCLP as performance criteria and influencing factors and identifies 7 critical performance criteria and 25 influencing factors for high-rise MiC. Specifically, the features of MiC (e.g. various modularised layout design, heavyweight and large size of modules) were found to significantly affect the crane layout performance (i.e. technical feasibility, safety and economic efficiency).

Originality/value

The paper is the first-of-its-kind study on crane layout planning for high-rise modular buildings, which contributes a two-stage multicriteria decision-making framework integrated with systematic TCLP considerations. The findings should help contractors determine safe and efficient tower crane layout plans for high-rise MiC projects.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 25 September 2018

Ruwini Edirisinghe

The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of…

23287

Abstract

Purpose

The future construction site will be pervasive, context aware and embedded with intelligence. The purpose of this paper is to explore and define the concept of the digital skin of the future smart construction site.

Design/methodology/approach

The paper provides a systematic and hierarchical classification of 114 articles from both industry and academia on the digital skin concept and evaluates them. The hierarchical classification is based on application areas relevant to construction, such as augmented reality, building information model-based visualisation, labour tracking, supply chain tracking, safety management, mobile equipment tracking and schedule and progress monitoring. Evaluations of the research papers were conducted based on three pillars: validation of technological feasibility, onsite application and user acceptance testing.

Findings

Technologies learned about in the literature review enabled the envisaging of the pervasive construction site of the future. The paper presents scenarios for the future context-aware construction site, including the construction worker, construction procurement management and future real-time safety management systems.

Originality/value

Based on the gaps identified by the review in the body of knowledge and on a broader analysis of technology diffusion, the paper highlights the research challenges to be overcome in the advent of digital skin. The paper recommends that researchers follow a coherent process for smart technology design, development and implementation in order to achieve this vision for the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 26 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Content available
Article
Publication date: 23 January 2021

Ming Fung Francis Siu, Joseph Lai, Yi Sun and Michael Anson

270

Abstract

Details

Facilities, vol. 39 no. 1/2
Type: Research Article
ISSN: 0263-2772

Case study
Publication date: 17 May 2021

Anita Sharma and Karminder Ghuman

This paper aims to enable the application of Value Proposition Canvas and Business Model Canvas to evaluate an opportunity; understand the commonalities and differences between…

Abstract

Learning outcomes

This paper aims to enable the application of Value Proposition Canvas and Business Model Canvas to evaluate an opportunity; understand the commonalities and differences between social and commercial enterprises; and recognize the challenges related to the paradox of the social mission and the financial/economic logic.

Case overview/synopsis

Neha Arora demonstrated exceptional capabilities of defying the social stigma associated with People with Disabilities (PwDs) to establish Planet Abled, a first in the world venture to provide accessible leisure excursions to PwDs. This entrepreneurial initiative enabling group and solo travel for PwDs as inclusive tourism has created the possibility of social sustainability by bringing change in the lives of PwDs and their family members by ignoring either the insensitive or overprotective societal attitudes and lack of infrastructure concerning travel for PwDs. Its potential growth qualifies for scaling-up, but it can also attract the existing big travel solution providers to enter this domain. Considering these facts, Neha faces multiple dilemmas: How can she sustain and scale up the early momentum created by her enterprise? How can she resolve the challenges related to the paradox of the social mission and the financial/ economic logic while scaling-up Planet Abled?

Complexity/Academic level

This case study is suitable for both undergraduate or graduate-level programs in the area of entrepreneurship.

Supplementary materials

Teaching Notes are available for educators only.

Subject code

CSS 3: Entrepreneurship

Details

Emerald Emerging Markets Case Studies, vol. 11 no. 2
Type: Case Study
ISSN: 2045-0621

Keywords

Article
Publication date: 22 June 2012

Eckhart Hertzsch, Christopher Heywood and Mirek Piechowski

The purpose of this paper is to present a methodology to improve decision making about investments that reduce buildings' energy consumption.

Abstract

Purpose

The purpose of this paper is to present a methodology to improve decision making about investments that reduce buildings' energy consumption.

Design/methodology/approach

A three‐stage methodology was developed and tested to analyse an existing Australian office building's energy use, its energy rating, and its life cycle investment. In total, seven cases of sets of improvements were modelled for energy performance. Their investment value was evaluated using a life cycle‐based analysis across several investment options.

Findings

A holistic approach to investment shows that the most effective sustainable refurbishments need not be the most expensive. Optimised investment can take advantage of the timing of both re‐investment in component renewal and efficiency gains from the refurbishment. Furthermore, relatively small changes in income can offset capital expenditure for refurbishments and protect against obsolescence.

Originality/value

Much work on sustainable refurbishments rarely considers the investment basis, across a life cycle, of that expenditure, generally seeing them as a cost and rarely considers the optimal time for that expenditure in the asset life cycle. This paper addresses both concerns.

Details

International Journal of Energy Sector Management, vol. 6 no. 2
Type: Research Article
ISSN: 1750-6220

Keywords

Article
Publication date: 12 October 2022

Thomas Danel, Zoubeir Lafhaj, Anand Puppala, Samer BuHamdan, Sophie Lienard and Philippe Richard

The crane plays an essential role in modern construction sites as it supports numerous operations and activities on-site. Additionally, the crane produces a big amount of data…

244

Abstract

Purpose

The crane plays an essential role in modern construction sites as it supports numerous operations and activities on-site. Additionally, the crane produces a big amount of data that, if analyzed, could significantly affect productivity, progress monitoring and decision-making in construction projects. This paper aims to show the usability of crane data in tracking the progress of activities on-site.

Design/methodology/approach

This paper presents a pattern-based recognition method to detect concrete pouring activities on any concrete-based construction sites. A case study is presented to assess the methodology with a real-life example.

Findings

The analysis of the data helped build a theoretical pattern for concrete pouring activities and detect the different phases and progress of these activities. Accordingly, the data become useable to track progress and identify problems in concrete pouring activities.

Research limitations/implications

The paper presents an example for construction practitioners and researcher about a practical and easy way to analyze the big data that comes from cranes and how it is used in tracking projects' progress. The current study focuses only on concrete pouring activities; future studies can include other types of activities and can utilize the data with other building methods to improve construction productivity.

Practical implications

The proposed approach is supposed to be simultaneously efficient in terms of concrete pouring detection as well as cost-effective. Construction practitioners could track concrete activities using an already-embedded monitoring device.

Originality/value

While several studies in the literature targeted the optimization of crane operations and of mitigating hazards through automation and sensing, the opportunity of using cranes as progress trackers is yet to be fully exploited.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 April 2020

Weiguang Jiang, Lieyun Ding and Cheng Zhou

Construction safety has been a long-term problem in the development of the construction industry. An increasing number of smart construction sites have been designed using…

1929

Abstract

Purpose

Construction safety has been a long-term problem in the development of the construction industry. An increasing number of smart construction sites have been designed using different techniques to reduce injuries caused by construction accidents and achieve proactive risk control. However, comprehensive smart construction site safety management solutions and applications have yet to be developed. Thus, this study proposes a smart construction site framework for safety management.

Design/methodology/approach

A safety management system based on a cyber-physical system is proposed. The system establishes risk data synchronization mapping between the virtual construction and physical construction sites through scene reconstruction design, data awareness, data communication and data processing modules. Personnel, mechanical and other risks on site will be warned and controlled.

Findings

The results of the case study have proved the management benefits of the system. On-site workers gradually realized that they should enter the construction site based on the standard process. And the number of people close to the construction hazard areas decreased.

Research limitations/implications

There are some limitations in the technology of smart construction site. The modeling speed can be faster, the data collection can be timelier, and the identification of unsafe behavior can be integrated into the system. Construction quality and efficiency issues in a virtual construction site will also be solved in further research.

Practical implications

In this paper, this system is actually applied in the mega project management process. More practical projects can use the management ideas and method of this paper to ensure on-site safety.

Originality/value

This study is among the first attempts to build a complete smart construction site based on CPS and apply it in practice. Personnel, mechanical, components, environment information will be displayed on the virtual construction site. It will greatly promote the development of the intellectualized construction industry in the future.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 1 April 1992

P. Hadley

Considers the ways in which property managers can minimizedifficulties after a disaster by appreciating potential damage by smoke,water and hazards such as asbestos. Summarizes…

Abstract

Considers the ways in which property managers can minimize difficulties after a disaster by appreciating potential damage by smoke, water and hazards such as asbestos. Summarizes the benefits of proactive damage management to be: stabilization of damage, effective reinstatement and disaster recovery planning. Examines one case of damage management : Portsmouth City Council′s civic offices. Concludes that property managers should develop closer links with loss adjusters since swift action can make the difference between survival and failure of a business.

Details

Property Management, vol. 10 no. 4
Type: Research Article
ISSN: 0263-7472

Keywords

Article
Publication date: 29 April 2021

Samad M.E. Sepasgozar, Mohsen Ghobadi, Sara Shirowzhan, David J. Edwards and Elham Delzendeh

This paper aims to examine the current technology acceptance model (TAM) in the field of mixed reality and digital twin (MRDT) and identify key factors affecting users' intentions…

1698

Abstract

Purpose

This paper aims to examine the current technology acceptance model (TAM) in the field of mixed reality and digital twin (MRDT) and identify key factors affecting users' intentions to use MRDT. The factors are used as a set of key metrics for proposing a predictive model for virtual, augmented and mixed reality (MR) acceptance by users. This model is called the extended TAM for MRDT adoption in the architecture, engineering, construction and operations (AECO) industry.

Design/methodology/approach

An interpretivist philosophical lens was adopted to conduct an inductive systematic and bibliographical analysis of secondary data contained within published journal articles that focused upon MRDT acceptance modelling. The preferred reporting items for systematic reviews and meta-analyses (PRISMA) approach to meta-analysis were adopted to ensure all key investigations were included in the final database set. Quantity indicators such as path coefficients, factor ranking, Cronbach’s alpha (a) and chi-square (b) test, coupled with content analysis, were used for examining the database constructed. The database included journal papers from 2010 to 2020.

Findings

The extant literature revealed that the most commonly used constructs of the MRDT–TAM included: subjective norm; social influence; perceived ease of use (PEOU); perceived security; perceived enjoyment; satisfaction; perceived usefulness (PU); attitude; and behavioural intention (BI). Using these identified constructs, the general extended TAM for MRDT in the AECO industry is developed. Other important factors such as “perceived immersion” could be added to the obtained model.

Research limitations/implications

The decision to utilise a new technology is difficult and high risk in the construction project context, due to the complexity of MRDT technologies and dynamic construction environment. The outcome of the decision may affect employee performance, project productivity and on-site safety. The extended acceptance model offers a set of factors that assist managers or practitioners in making effective decisions for utilising any type of MRDT technology.

Practical implications

Several constraints are apparent due to the limited investigation of MRDT evaluation matrices and empirical studies. For example, the research only covers technologies which have been reported in the literature, relating to virtual reality (VR), augmented reality (AR), MR, DT and sensors, so newer technologies may not be included. Moreover, the review process could span a longer time period and thus embrace a fuller spectrum of technology development in these different areas.

Originality/value

The research provides a theoretical model for measuring and evaluating MRDT acceptance at the individual level in the AECO context and signposts future research related to MRDT adoption in the AECO industry, as well as providing managerial guidance for progressive AECO professionals who seek to expand their use of MRDT in the Fourth Industrial Revolution (4IR). A set of key factors affecting MRDT acceptance is identified which will help innovators to improve their technology to achieve a wider acceptance.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 5
Type: Research Article