Search results

1 – 10 of 616
Open Access
Book part
Publication date: 1 May 2019

Anna-Therése Järvenpää, Johan Larsson and Per Erik Eriksson

For a number of years, the construction industry has seen an ongoing shift from design-bid-build to design-build contracts. This transition in contract type entails changes for…

Abstract

Purpose

For a number of years, the construction industry has seen an ongoing shift from design-bid-build to design-build contracts. This transition in contract type entails changes for both the organizations and the individuals involved. Consequently, the purpose of this paper is to investigate how the client manages the transition between the different contract types from an organizational change perspective in a project-led organization.

Design/Methodology/Approach

A multiple case study of six infrastructure projects with DB contracts, all managed by the Swedish Transport Administration, was conducted. The major source of data is semi-structured interviews with respondents from both the client and the contractors.

Findings

Results suggest that the transition has resulted in a mix of design-bid-build and design-build as contract type owing to issues when changing in a project-led organization. A change in vision also requires a concomitant change in culture, systems and roles.

Research Limitations/Implications

The study only includes cases from the Swedish transport infrastructure sector, which limits the generalizability. The findings are also indicative owing to the small number of cases.

Practical Implications

The findings further our understanding of managing change in complex projects, which might help practitioners to manage change in a more integrated way.

Originality/Value

The findings enrich our understanding of the systemic change that a switch in contract types can have in inter-organizational complex projects such as transport infrastructure projects. Furthermore, it emphasizes the intricate task of change management in project-led organizations and its effects on roles and responsibilities.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Book part
Publication date: 1 May 2019

Marco A. Bragadin and Kalle Kähkönen

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry…

Abstract

Purpose

This paper is based on research addressing quality of construction schedules. The paper aims to structure a Schedule Health Assessment method and present it as a means to carry out the evaluation of construction schedules.

Design/Methodology/Approach

The development of the Schedule Health assessment method can be characterised as constructive research. The structuring of the method is based on analysis of factors forming the overall quality of construction schedules. The method has been tested in a proof of concept study. This comprised a case study in which four master schedules developed by junior production managers were evaluated using the Schedule Health assessment method.

Findings

It is possible to construct a method for the quality evaluation of construction schedules.

Research Limitations/Implications

The completed testing is still rather limited since it is based merely on experiences of junior production managers with a single case.

Practical Implications

The Schedule Health assessment method can in a useful manner make the quality evaluation of construction schedules easy to approach and effective process.

Originality/Value

This research has produced a novel method for the quality evaluation of construction schedules.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 16 March 2021

Hongjuan Wu, Queena K. Qian, Ad Straub and Henk J. Visscher

The recent promotion of prefabricated housing (PH) in China has resulted in a prosperous period for its implementation. However, transaction costs (TCs) cause low economic…

1967

Abstract

Purpose

The recent promotion of prefabricated housing (PH) in China has resulted in a prosperous period for its implementation. However, transaction costs (TCs) cause low economic efficiency to stakeholders and hinder the further promotion of PH. No relevant study has yet been made to investigate the TCs and their causes in the PH field. This paper identifies critical TCs and explores the influencing factors from the developers' perspective.

Design/methodology/approach

Semi-structured interviews and a questionnaire survey were used to collect data about TCs and influencing factors. The most influential factors are identified with their impacts on particular TCs, yielded from correlation analysis and logistic regression.

Findings

From the developers' perspective in China's PH market, this study identified that the most concerning sources of TCs are: hidden costs arising from disputes, extra workloads from design changes, learning costs, intensive communication and coordination in assembly and unexpected information costs in decision-making. The use of an ordered logistic regression approach indicates that the four most influential factors are: qualification of the general contractor, mandatory local policies, owner type and competitiveness of the developer.

Practical implications

To reduce the TCs, experiencing learning and ensuring the design scheme's complicity are recommended to save information searching and exchanging costs. The implications for the PH developers are for them to: (1) professionalize their own organization and (2) procure high-qualified general contractors. For the policymakers, this means they should improve the clarity of the mandatory local policies for PH step-by-step.

Originality/value

By applying the TCs economic theory, this study explores factors that influence TCs in the PH industry. It sheds light on the influencing mechanism behind the TCs in the context of prefabricated housing.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 1
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1022

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 6 July 2022

Klara Granheimer, Tina Karrbom Gustavsson and Per Erik Eriksson

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the…

Abstract

Purpose

Prior research has emphasised the importance of the early phases of construction projects, as well as the difficulties of procuring engineering services – especially due to the uncertainties. Despite that, studies on the public procurement of engineering services are scarce. Although scholars have shown that uncertainty may affect the choice of control modes, the level of uncertainty that characterises services is not addressed by the two task characteristics: knowledge of the transformation process and output measurability. The purpose is to investigate organisational control in public procurement of engineering services.

Design/methodology/approach

The existing control model was adjusted in this study by conceptually adding uncertainty as a third aspect to the two task characteristics. A single case study of the Swedish Transport Administration was used. The empirical data, comprising 14 interviews with managers from the client and engineering consulting companies, were analysed using flexible pattern matching and visual mapping approaches and then illustrated using the model.

Findings

The public client did not base its choice of control modes on uncertainty, but rather on the other two task characteristics. Consequently, the service providers argued that the chosen control modes reduced their creativity, increased their financial risks and caused unclear responsibilities. This study therefore shows that uncertainty is an important factor to consider in the choice of control modes, both from a theoretical perspective and from the service providers' point of view. The developed model may therefore be useful for researchers as well as practitioners.

Originality/value

This study is the first attempt to add uncertainty as a task characteristic when choosing control modes. The results contribute to the scarce control literature regarding the procurement of engineering services for construction projects and the procurement of other services with high uncertainty.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 7 July 2022

Kirsi Aaltonen and Virpi Turkulainen

In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large…

2108

Abstract

Purpose

In this study, we develop further understanding of how institutional change is created within a mature and local industry. In this pursuit, we examine how a collaborative large project governance model was institutionalized at an industrial sector-level through both industry-level activities and “institutional projects”.

Design/methodology/approach

This study builds on the foundations of institutional fields and institutional change, suggesting that projects are not only shaped by their contexts but also produce institutional change themselves. We conducted extensive fieldwork on the institutionalization of a collaborative project governance model in Finland.

Findings

The findings illustrate how institutional change in governance of large and complex inter-organizational projects is created at the institutional field level. The institutionalized collaborative project governance model includes aspects of both relational and contractual governance. The change was facilitated by temporal links between the institutional projects as well as vertical links between the institutional projects and the field-level development programs.

Originality/value

This is one of the first studies to address how a collaborative large project governance model becomes the norm at the institutional field level beyond the boundaries of an individual project or organization.

Details

International Journal of Operations & Production Management, vol. 42 no. 8
Type: Research Article
ISSN: 0144-3577

Keywords

Open Access
Article
Publication date: 6 June 2022

Taha Karasu, Kirsi Aaltonen and Harri Haapasalo

Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and…

3922

Abstract

Purpose

Integrated project delivery (IPD) and building information modeling (BIM) have been discussed as prominent collaborative concepts in recent architecture, engineering and construction (AEC) literature, thus recommended for more advanced value creation. However, they have been studied predominantly as discrete even though they are typically highly interrelated. This study aims to enhance collaboration in AEC projects by tracing recent trends in IPD and BIM literature by making sense of trends and by exploring how their interplay has been discussed and conceptualized.

Design/methodology/approach

This systematic literature review draws on Scopus and Web of Science as the primary databases. In total, 120 academic papers and review articles were sourced. Yet, the final sample includes 71 sources from the past decade (2011–2020), focusing on both IPD and BIM.

Findings

This study identifies 11 interrelated and overlapping themes that are indicative of trends in the recent IPD and BIM literature. This research found that among the identified themes, the clusters of sustainability, transformation and increasing the competence level of staff in the AEC industry, in addition to the concept of quality, require more extensive research in the context of IPD and BIM. Additionally, this study identifies four different approaches to the interplay of IPD and BIM, indicating an absence of scholarly consistency.

Originality/value

Based on the systematic analysis of the recent literature, this study indicates that IPD and BIM have several joint fundamental cornerstones. It is evident that both concepts support the implementation of each other. The success of implementing either one is strongly related to the other. Additionally, we have not found earlier systematic literature reviews that examine the interplay between IPD and BIM in the recent AEC literature.

Open Access
Article
Publication date: 26 May 2023

Sina Moradi and Piia Sormunen

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling…

2773

Abstract

Purpose

The construction industry has considerably evolved in the recent two decades due to the emergence of sustainability, lean construction (LC) and building information modelling (BIM). Despite previous research efforts, there is still a gap concerning the multidimensional nature of their integration. Hence, this study aims to fill the mentioned knowledge gap through exploring and comparing the challenges, enablers, techniques as well as benefits of integrating LC with BIM and sustainability in building construction projects.

Design/methodology/approach

A systematic literature review was conducted to fulfill the purpose of this study.

Findings

The findings reveal and compare the challenges, enablers, techniques and benefits of integrating LC with BIM and sustainability in building construction projects. The results suggest that there are eight common challenges for integrating LC with BIM and sustainability, including high initial cost, lack of collaboration, lack of professionals and lack of compatible contractual framework. The discovered challenges, enablers, techniques and benefits seem to be mostly routed in people. The findings also suggest that the synergistic benefits of integrating LC with BIM and sustainability can overcome the common challenges (safety, reliability, productivity, collaboration and quality) in construction projects.

Originality/value

The findings contribute to the literature and practice concerning the integration of LC with BIM and sustainability by exploring, comparing and discussing the relevant challenges, enablers, techniques as well as benefits. Moreover, the findings reveal the significance of the development of people in construction industry, besides processes and technology, as people are always subject of activities in construction while processes and technology are always objects.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 2 August 2022

Sina Moradi and Kalle Kähkönen

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have…

1975

Abstract

Purpose

The emergence of collaborative delivery models and working practices in construction industry has created a potential area for project success research. Previous studies have addressed success factors of various collaborative delivery models (e.g. alliance and partnering). However, there is currently very limited research-based knowledge concerning core success factors for different collaborative delivery models, exploring the commonalities. Thus, this study aims to conceptualize a success model for collaborative construction projects by identifying and structuring their core success factors through the lens of project delivery elements.

Design/methodology/approach

A systematic literature review was conducted, and thematic as well as content analysis of the relevant studies led to the identification of mentioned success factors in the literature for different collaborative delivery models. Then, those common success factors were structured in a model based on factors' relation to project delivery elements.

Findings

The obtained results present eight core success factors (e.g. equality, mutual trust and commitment to win–win philosophy) for collaborative construction projects, structured in a model based on their contribution toward project organization, contractual relationships, and operational system in construction project delivery. Moreover, the differences between success factors for traditional and collaborative construction projects are discussed.

Originality/value

This study's findings provide insightful theoretical contributions on collaborative construction project success and providing a departure point for future studies based on the discussed differences between success factors of collaborative and traditional construction projects. The findings can be also practically insightful for the project professionals in collaborative construction projects to succeed in managing project organization, contractual relationships, and operational system.

Details

Built Environment Project and Asset Management, vol. 12 no. 6
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Book part
Publication date: 1 May 2019

Pertti Lahdenperä

The paper aims to describe the evolution and use of project alliancing in Finland: how the model was discovered, and then, little by little, became an established practice.

Abstract

Purpose

The paper aims to describe the evolution and use of project alliancing in Finland: how the model was discovered, and then, little by little, became an established practice.

Design/Methodology/Approach

The paper is based on a long-term observation of the construction sector activities, involvement in their development and a review of related research and practice documents.

Findings

The paper illustrates how a major change may be laborious. It also reveals that the application of project alliancing seems to have been successful so far, but there are still threats on the horizon.

Research Limitations/Implications

The overview ignores many meaningful details and does not include a critical review of the positive experiences reported by the industry. There certainly is need for related research.

Practical Implications

The study offers a point of reference for evaluation of the smoothness of the progress of industry wide changes.

Originality/Value

This paper seems to be the first one providing a more comprehensive picture of the progress and use of alliancing in Finland, thus supplementing existing view- and project-specific examinations.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

1 – 10 of 616