Search results

1 – 10 of over 22000
Article
Publication date: 14 April 2022

Libiao Bai, Xue Qu, Jiale Liu and Xiao Han

Realizing project portfolio benefits (PPBs) is considered a key challenge faced by enterprises. This challenge can largely be attributed to an unclear understanding of the factors…

Abstract

Purpose

Realizing project portfolio benefits (PPBs) is considered a key challenge faced by enterprises. This challenge can largely be attributed to an unclear understanding of the factors influencing PPBs. However, synergistic relationships create complexity for the management of influencing factors. In response to this dilemma, the objective of this study is to quantitatively investigate the factors influencing PPBs while considering the synergistic effect among factors to provide guidelines for benefits management.

Design/methodology/approach

Through an integration of the synergy degree of the composite system model and social network analysis (SNA), a refined model is proposed to explore the factors influencing PPBs. First, a list that includes financial and nonfinancial influencing factors is clarified. Then, the corresponding network links, which represent the synergistic relationships among the factors, are innovatively assessed based on the synergy degree of the composite system. Finally, the influencing factor network is analyzed using both individual and overall indicators of SNA.

Findings

The resulting evidence demonstrates that four critical influencing factors exist, namely, “project managers,” “purchasers,” “development capacity” and “tangible resources.” These factors are relatively important and should be prioritized. Furthermore, the factors are divided into three subgroups: participant, resource and governmental factors. A general observation from the results is that factors that share the same subgroup are more likely to have a synergistic effect advantage, which leads to an increase in PPBs.

Originality/value

The value of this paper lies in its proposition of a quantitative model that can be used to measure and analyze the factors influencing PPBs with synergy considerations. This research contributes to the body of knowledge on benefits management by linking synergy with PPBs. It presents new insights for managers on how PPBs may be effectively managed and promoted from the perspective of influencing factors.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 7
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 15 March 2024

Mohammed Taha Alqershy, Qian Shi and Diana R. Anbar

This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of…

Abstract

Purpose

This study aims to investigate the factors influencing the social responsibility performance of Belt and Road Initiative (BRI) megaprojects. Specifically, it examines the role of isomorphic pressures and the joint influence of perceived benefits and top management support on megaproject social responsibility performance (MSRP).

Design/methodology/approach

Drawing from institutional theory, social exchange theory, and top management literature, this study established a conceptual model featuring eleven hypotheses. Subsequently, a questionnaire survey was administered to collect data from 238 actively engaged participants in BRI megaprojects. Structural Equation Modelling was utilised to analyse the data.

Findings

The empirical findings indicate that mimetic and coercive pressures positively influence MSRP. Perceived benefits and top management support significantly enhance MSRP. Moreover, perceived benefits and top management support partially mediate the effects of coercive and mimetic pressures. However, when it comes to normative pressures, their impact on MSRP is solely channelled through the support of top management.

Originality/value

This study is one of the early endeavours to explore the factors influencing the social responsibility performance of BRI megaprojects. It sheds light on the interplay between external pressures and internal factors in shaping social responsibility efforts in these projects. These findings are of particular significance for BRI actors and stakeholders, offering guidance for enhancing social responsibility strategies within the context of BRI megaprojects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 April 2022

Bertha Viviana Ruales Guzmán and Oscar Fernando Castellanos Domínguez

This study aims to address two objectives: to analyse how the benefits of quality management (QM) are perceived on specific productivity indicators of the Colombian dairy industry…

Abstract

Purpose

This study aims to address two objectives: to analyse how the benefits of quality management (QM) are perceived on specific productivity indicators of the Colombian dairy industry and to analyse the degree of QM implementation.

Design/methodology/approach

The methodology used was a multiple case study and involved four companies in the Colombian dairy industry. The study variables were 32 QM practices and 7 productivity indicators. Data collection instruments were in-depth interviews and checklists.

Findings

Findings revealed that all productivity indicators exhibit changes after QM implementation. In addition, cases approaching ISO 9001 have the highest number of practices implemented, as well as evidence of control of all productivity indicators, which allows them to perceive greater benefits.

Originality/value

This research generates novel findings that contribute to the consolidation of theory by analysing changes in specific productivity indicators of the dairy industry after the QM implementation. At the same time, it provides valuable and useful information for managers, practitioners and policymakers.

Details

International Journal of Productivity and Performance Management, vol. 72 no. 8
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 21 July 2023

Meishan Jia and Lingmin Zhao

In China, information-based construction management (ICM) has not obtained the expected results because of the benefit game between construction enterprises and the government…

Abstract

Purpose

In China, information-based construction management (ICM) has not obtained the expected results because of the benefit game between construction enterprises and the government. Promoting ICM is a long-term, complex and dynamic game process. Therefore, an evolutionary game model is established to promote ICM.

Design/methodology/approach

MATLAB was used to conduct evolutionary game analysis on the behavioural strategies of two parties. System stability analysis and numerical simulation were conducted. The variables affecting ICM realization were analysed and comprehensively considered. The optimal stability strategy and key variables were obtained.

Findings

The results show that the system includes four evolutionarily stable strategies (ESSs) with 10 decisive parameters. Information technology costs, benefits, reputation, the government intervention level, the enterprise ICM level and the degree of reward and punishment determine the ideal ESS. Increasing tangible benefits, enhancing corporate reputation, improving the level of government guidance and reducing intervention costs can promote ICM implementation. Rewards are more effective than punishments, and appropriate rewards should be determined.

Research limitations/implications

First, reducing labour disputes, accidents and environmental pollution brings great social and ecological benefits; hence, the recognition of external benefits and the establishment of a benefit compensation mechanism by the government will be a future focus of research (Jia et al., 2020). Second, this study considered only the government and construction enterprises, and there may be other stakeholders, such as owners and the public, in the ICM adoption process, which needs further analysis (Zhang and Li, 2022). Third, this research is based on the specific context of government intervention in ICM. The selection of parameters and the determination of values were based on the national conditions in China. Therefore, the generalizability of the research results to other countries and other political contexts needs to be further improved (Hardie et al., 2013; Martínez-Román et al., 2017). Fourth, the empirical data were collected from Shandong Province and a pilot project, and the universality of the data remains to be verified. Nevertheless, the data were used only for the initial values of the simulation, which did not affect the simulation path.

Practical implications

(1) This study comprehensively summarized the benefit and cost indexes for the government and enterprises to promote ICM and constructed the payment matrix model. (2) This study determined the theoretical relation that the parameters should meet when system evolves into a certain strategy, and the research findings provide recommendations for overall control for the government and enterprises to synergistically adopt the ICM. (3) The study determined the influence of the main parameters on system evolution path and identified the core parameters, thus providing targeted improvement recommendations for the government and enterprises.

Social implications

Real-time data-based management can ensure product quality and production safety and improve decision-making and efficiency. For the government, ICM can effectively reduce project quality and safety accidents, labour disputes, supplier mix-ups and environmental pollution, thus reducing the government's management costs and improving social benefits.

Originality/value

(1) Based on the challenges of ICM implementation, the payment matrix is constructed, with the cost and benefit parameters fully considered. (2) This study determines the theoretical relationship that should be met when both parties coordinate their implementation and when enterprises implement independently, and the optimal strategy is specified. (3) Incorporating an actual case, a simulation is conducted to clarify the influence of a single parameter on the evolutionary path of behaviours. (4) A decision-making basis for governments and enterprises to control and improve ICM is provided.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 November 2023

Laura Broccardo, Paola Vola, Safiya Mukhtar Alshibani and Riccardo Tiscini

Digitalization is affecting business management and pushing for new strategies, innovative products, new ways to communicate with stakeholders and new channels. This phenomenon is…

Abstract

Purpose

Digitalization is affecting business management and pushing for new strategies, innovative products, new ways to communicate with stakeholders and new channels. This phenomenon is unavoidable, and companies have to face it in a holistic and integrated way. One holistic and interconnected approach, when studying enterprise challenges, is represented by the business process management method, a fitting mechanism when digitalization needs to be amalgamated in business practices, enhancing the intellectual capital (IC), therefore, this study researches digitalization under business process lens, in a sample of small and medium enterprises (SMEs), that constitute an under-explored set, as regard digitalization, process management and IC. The research aims to explore the digital tools and business processes link and the related impact on performance, benefits and IC.

Design/methodology/approach

In exploring digitalization, a sample of Italian SMEs was scrutinized. The data were elaborated using two types of tests: (1) the binomial tests for the categorical questions and (2) the zeta test was used for quantitative variables. Furthermore, the partial least square (PLS)-SEM model was applied.

Findings

Findings reveal that some digital tools are more adopted in the sample analysed, and also some particular digital tools are more inclined to support certain business processes. Furthermore, not only performance benefits emerge, but also benefits in terms of better communication and faster decisions, supporting the decision making process of managers, also considering that business processes approach is one way to manage IC.

Practical implications

Thanks to the conducted research it is possible to make aware managers and owners of SMEs to consciously choose the right type of digitalization investments, without neglecting training programme, to realize the company digital transformation, providing a map and bearing in mind the value added creation, protecting their IC.

Originality/value

The paper's originality is represented by the contribution in opening the black box about digitalization, business process management and IC in small and medium companies.

Details

Journal of Intellectual Capital, vol. 25 no. 1
Type: Research Article
ISSN: 1469-1930

Keywords

Article
Publication date: 16 June 2022

Xiaojuan Li, Zhou Zhang, C.Y. Jim, Jiyu Lai and Xueqing Chen

This paper aims to establish a model to evaluate the benefits of building information modeling (BIM) from the owners' perspective. The model analyzes the correlation between five…

Abstract

Purpose

This paper aims to establish a model to evaluate the benefits of building information modeling (BIM) from the owners' perspective. The model analyzes the correlation between five secondary benefit indicators and their subsystems: product, financial, organizational, management and strategic. The final key factors of BIM benefits provide a decision-making basis for owners to raise the efficiency of BIM application.

Design/methodology/approach

Firstly, the authors combed 31 BIM-related literature and interviewed experts to identify 15 preliminary benefit indicators. The authors established a BIM benefit evaluation system based on relevant concepts, including two primary indicators, five secondary indicators and 15 tertiary indicators. Secondly, the authors analyzed the indicators by the extension theory of matter element analysis and a questionnaire survey of expert opinion. Finally, the new method was applied to a case study of a large shopping center in east China for empirical verification.

Findings

A BIM benefit evaluation model, including a three-tiered hierarchy of primary, secondary and tertiary indicators, was constructed through literature review and expert opinions. The model determined the critical factors of BIM benefits, enhanced understanding of owner benefits and improved BIM application under the owners' leadership.

Originality/value

At present, most studies focus on specific project stages or benefit indicators. This study developed an integrated BIM benefit evaluation system that targets owners. The findings could foster the development of China's construction industry, promote owner-led BIM application and advocate adopting the benefit evaluation method.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 May 2022

Zhenshuang Wang, Yanxin Zhou, Xiaohua Jin, Ning Zhao and Jianshu Sun

Public-private partnership (PPP) projects for construction waste recycling have become the main approach to construction waste treatment in China. Risk sharing and income…

Abstract

Purpose

Public-private partnership (PPP) projects for construction waste recycling have become the main approach to construction waste treatment in China. Risk sharing and income distribution of PPP projects play a vital role in achieving project success. This paper is aimed at building a practical and effective risk sharing and income distribution model to achieve win–win situation among different stakeholders, thereby providing a systematic framework for governments to promote construction waste recycling.

Design/methodology/approach

Stakeholders of construction waste recycling PPP projects were reclassified according to the stakeholder theory. Best-worst multi–criteria decision-making method and comprehensive fuzzy evaluation method (BWM–FCE) risk assessment model was constructed to optimize the risk assessment of core stakeholders in construction waste recycling PPP projects. Based on the proposed risk evaluation model for construction waste recycling PPP projects, the Shapley value income distribution model was modified in combination with capital investment, contribution and project participation to obtain a more equitable and reasonable income distribution system.

Findings

The income distribution model showed that PPP Project Companies gained more transaction benefits, which proved that PPP Project Companies played an important role in the actual operation of PPP projects. The policy change risk, investment and financing risk and income risk were the most important risks and key factors for project success. Therefore, it is of great significance to strengthen the management of PPP Project Companies, and in the process of PPP implementation, the government should focus on preventing the risk of policy changes, investment and financing risks and income risks.

Practical implications

The findings from this study have advanced the application methods of risk sharing and income distribution for PPP projects and further improved PPP project-related theories. It helps to promote and rationalize fairness in construction waste recycling PPP projects and to achieve mutual benefits and win–win situation in risk sharing. It has also provided a reference for resource management of construction waste and laid a solid foundation for long-term development of construction waste resources.

Originality/value

PPP mode is an effective tool for construction waste recycling. How to allocate risks and distribute benefits has become the most important issue of waste recycling PPP projects, and also the key to project success. The originality of this study resides in its provision of a holistic approach of risk allocation and benefit distribution on construction waste PPP projects in China as a developing country. Accordingly, this study adds its value by promoting resource development of construction waste, extending an innovative risk allocation and benefit distribution method in PPP projects, and providing a valuable reference for policymakers and private investors who are planning to invest in PPP projects in China.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 March 2024

Waqar Ahmed, Arsalan Najmi and Sohail Majeed

This paper aims to provide a framework regarding Information Technology (IT) Flexibility in Supply Chain and its relationship with the benefits we could see from Enterprise…

Abstract

Purpose

This paper aims to provide a framework regarding Information Technology (IT) Flexibility in Supply Chain and its relationship with the benefits we could see from Enterprise Resource Planning (ERP) systems. Furthermore, this research explores the moderating effect of Process Integration Capability in the relationship between IT flexibility and ERP benefits.

Design/methodology/approach

This research model will help organizations get additional benefits from their ERP systems that incurred huge costs, time and multiple resources at their implementation. The technique used for analyzing data is structural equation modeling (SEM), and data is collected from 107 respondents through a questionnaire from Business and IT Professionals.

Findings

The study findings reveal a positive and significant relationship between IT flexibility and ERP systems benefits; moreover, results also confirmed that the organization's process integration capability significantly increased the benefits of ERP systems. The findings also highlight empirical evidence about the significance of the top-to-bottom approach investing in IT flexibility and the bottom-to-top approach during the implementation of IT systems for successful implementations.

Practical implications

This study has various implications for practitioners that help them successfully implement and long-term viability of their IT infrastructure.

Originality/value

This study's findings will help IT managers and strategists make effective decisions for creating IT flexibility in alignment with the strategic goals to realize the desired results expected from ERP systems and implementations of new IT systems.

Details

Journal of Systems and Information Technology, vol. 26 no. 1
Type: Research Article
ISSN: 1328-7265

Keywords

Open Access
Article
Publication date: 26 May 2023

Mpho Trinity Manenzhe, Arnesh Telukdarie and Megashnee Munsamy

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

1705

Abstract

Purpose

The purpose of this paper is to propose a system dynamic simulated process model for maintenance work management incorporating the Fourth Industrial Revolution (4IR) technologies.

Design/methodology/approach

The extant literature in physical assets maintenance depicts that poor maintenance management is predominantly because of a lack of a clearly defined maintenance work management process model, resulting in poor management of maintenance work. This paper solves this complex phenomenon using a combination of conceptual process modeling and system dynamics simulation incorporating 4IR technologies. A process for maintenance work management and its control actions on scheduled maintenance tasks versus unscheduled maintenance tasks is modeled, replicating real-world scenarios with a digital lens (4IR technologies) for predictive maintenance strategy.

Findings

A process for maintenance work management is thus modeled and simulated as a dynamic system. Post-model validation, this study reveals that the real-world maintenance work management process can be replicated using system dynamics modeling. The impact analysis of 4IR technologies on maintenance work management systems reveals that the implementation of 4IR technologies intensifies asset performance with an overall gain of 27.46%, yielding the best maintenance index. This study further reveals that the benefits of 4IR technologies positively impact equipment defect predictability before failure, thereby yielding a predictive maintenance strategy.

Research limitations/implications

The study focused on maintenance work management system without the consideration of other subsystems such as cost of maintenance, production dynamics, and supply chain management.

Practical implications

The maintenance real-world quantitative data is retrieved from two maintenance departments from company A, for a period of 24 months, representing years 2017 and 2018. The maintenance quantitative data retrieved represent six various types of equipment used at underground Mines. The maintenance management qualitative data (Organizational documents) in maintenance management are retrieved from company A and company B. Company A is a global mining industry, and company B is a global manufacturing industry. The reliability of the data used in the model validation have practical implications on how maintenance work management system behaves with the benefit of 4IR technologies' implementation.

Social implications

This research study yields an overall benefit in asset management, thereby intensifying asset performance. The expected learnings are intended to benefit future research in the physical asset management field of study and most important to the industry practitioners in physical asset management.

Originality/value

This paper provides for a model in which maintenance work and its dynamics is systematically managed. Uncontrollable corrective maintenance work increases the complexity of the overall maintenance work management. The use of a system dynamic model and simulation incorporating 4IR technologies adds value on the maintenance work management effectiveness.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 5
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 3 October 2023

Jingyu Cheng, Minxi Wang, Lilin Wu and Xin Li

The purpose of this paper is to explore the high-quality development (HQD) strategy of Chinese mineral resource enterprises, which is important for Chinese mineral resource…

Abstract

Purpose

The purpose of this paper is to explore the high-quality development (HQD) strategy of Chinese mineral resource enterprises, which is important for Chinese mineral resource enterprises to improve the efficiency and benefit of resource utilization, reduce the intensity of resource and energy consumption and gradually form resource-saving and environment-friendly enterprises.

Design/methodology/approach

This study establishes an evaluation index system with four dimensions: economy, environment, society and management innovation. The entropy value method assigns weights to them and then uses the system dynamics (SD) model for case simulation.

Findings

The results of the SD simulation conclude that the fulfillment of social responsibility and the implementation of management innovation can accelerate the realization of HQD of mineral resource enterprises; profitability plays a crucial role in economic indicators; the improvement of energy-saving volume has the most significant impact on environmental benefits; the social contribution is the key element to measure social indicators; and the sales rate of core products has the most significant impact on the benefits of management innovation.

Originality/value

Based on the few studies on the evaluation of the development strategy of mineral resource enterprises, this study establishes an evaluation index system that considers the interactions between indicators, combines the entropy value method with SD and uses the SD model to comprehensively and systematically analyze the impact and degree of each factor on the HQD of mineral resource enterprises.

Details

Chinese Management Studies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1750-614X

Keywords

1 – 10 of over 22000