Search results

1 – 10 of 543
Open Access
Article
Publication date: 4 January 2024

Ankita Kalia

This study aims to explore the relationship between chief executive officer (CEO) power and stock price crash risk in India. Furthermore, it seeks to analyse how insider trades…

Abstract

Purpose

This study aims to explore the relationship between chief executive officer (CEO) power and stock price crash risk in India. Furthermore, it seeks to analyse how insider trades may moderate the impact of CEO power on stock price crash risk.

Design/methodology/approach

A study of 236 companies from the S&P BSE 500 Index (2014–2023) have been analysed through pooled ordinary least square (OLS) regression in the baseline analysis. To enhance the results' reliability, robustness checks include alternative methodologies, such as panel data regression with fixed-effects, binary logistic regression and Bayesian regression. Additional control variables and alternative crash risk measure have also been utilised. To address potential endogeneity, instrumental variable techniques such as two-stage least squares (IV-2SLS) and difference-in-difference (DiD) methodologies are utilised.

Findings

Stakeholder theory is supported by results revealing that CEO power proxies like CEO duality, status and directorship reduce one-year ahead stock price crash risk and vice versa. Insider trades are found to moderate the link between select dimensions of CEO power and stock price crash risk. These findings persist after addressing potential endogeneity concerns, and the results remain consistent across alternative methodologies and variable inclusions.

Originality/value

This study significantly advances research on stock price crash risk, especially in emerging economies like India. The implications of these findings are crucial for investors aiming to mitigate crash risk, for corporations seeking enhanced governance measures and for policymakers considering the economic and welfare consequences associated with this phenomenon.

Details

Asian Journal of Economics and Banking, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2615-9821

Keywords

Article
Publication date: 3 January 2023

Pengcheng Xiang, Xin Xia and Xianya Pang

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project…

Abstract

Purpose

The purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source factors and refine the risk management strategies of CMCPs through a case study.

Design/methodology/approach

Based on the analysis of the risk system of CMCPs, the concept model and risk assessment principles of integrated risk assessment were confirmed. The risk source factors and project objectives of the CMCP were identified from a literature review, export interview and case analysis. According to the vulnerability theory, the integrated risk assessment model was developed by involving vulnerabilities, threats, objectives and interaction of those factors synthetically. Then, ZW high-speed railway from China was analyzed to verify the feasibility and effectiveness of the proposed method.

Findings

As a result, 12 threat factors and 12 vulnerability factors were identified. Based on the case study, the main external threat comes from T13 (conflicts of interest between local governments) and T23 (harsh natural environment); the most easily exploited internal vulnerabilities were V11 (complexity of technology), V13 (lack of experience in technical application), V21 (inadequate experience) and V23 (lack of interest coordination mechanism). Moreover, the economic objective was most affected.

Practical implications

It is essential to develop an interest coordination mechanism for CMCPs. The harsh natural environment is a critical factor, but it also promotes technological innovation and iteration. Public opinions in different regions are critical for CMCPs, and more emphasis should be placed on public opinion surveys of CMCPs. Moreover, diverse and flexible environmental protection strategies should apply in CMCPs.

Originality/value

This research has the following three contributions. First, based on vulnerability theory, an integrated risk assessment approach of CMCPs is developed, which enriches the risk measurement method system and provides inspiration for future research on risk in the construction industry. Second, the risk sources of CMCPs are identified from the perspective of vulnerability and threat to provide clear guidance for the risk management of CMCPs. Third, the core risk source factors and management strategies confirmed by the case study will be beneficial for various governments in different regions and project managers to optimize the project management scheme, as they are transferable management experiences.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 21 March 2024

Warisa Thangjai and Sa-Aat Niwitpong

Confidence intervals play a crucial role in economics and finance, providing a credible range of values for an unknown parameter along with a corresponding level of certainty…

Abstract

Purpose

Confidence intervals play a crucial role in economics and finance, providing a credible range of values for an unknown parameter along with a corresponding level of certainty. Their applications encompass economic forecasting, market research, financial forecasting, econometric analysis, policy analysis, financial reporting, investment decision-making, credit risk assessment and consumer confidence surveys. Signal-to-noise ratio (SNR) finds applications in economics and finance across various domains such as economic forecasting, financial modeling, market analysis and risk assessment. A high SNR indicates a robust and dependable signal, simplifying the process of making well-informed decisions. On the other hand, a low SNR indicates a weak signal that could be obscured by noise, so decision-making procedures need to take this into serious consideration. This research focuses on the development of confidence intervals for functions derived from the SNR and explores their application in the fields of economics and finance.

Design/methodology/approach

The construction of the confidence intervals involved the application of various methodologies. For the SNR, confidence intervals were formed using the generalized confidence interval (GCI), large sample and Bayesian approaches. The difference between SNRs was estimated through the GCI, large sample, method of variance estimates recovery (MOVER), parametric bootstrap and Bayesian approaches. Additionally, confidence intervals for the common SNR were constructed using the GCI, adjusted MOVER, computational and Bayesian approaches. The performance of these confidence intervals was assessed using coverage probability and average length, evaluated through Monte Carlo simulation.

Findings

The GCI approach demonstrated superior performance over other approaches in terms of both coverage probability and average length for the SNR and the difference between SNRs. Hence, employing the GCI approach is advised for constructing confidence intervals for these parameters. As for the common SNR, the Bayesian approach exhibited the shortest average length. Consequently, the Bayesian approach is recommended for constructing confidence intervals for the common SNR.

Originality/value

This research presents confidence intervals for functions of the SNR to assess SNR estimation in the fields of economics and finance.

Details

Asian Journal of Economics and Banking, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2615-9821

Keywords

Article
Publication date: 4 April 2024

Richard Kadan, Temitope Seun Omotayo, Prince Boateng, Gabriel Nani and Mark Wilson

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While…

Abstract

Purpose

This study aimed to address a gap in subcontractor management by focusing on previously unexplored complexities surrounding subcontractor management in developing countries. While past studies concentrated on selection and relationships, this study delved into how effective subcontractor management impacts project success.

Design/methodology/approach

This study used the Bayesian Network analysis approach, through a meticulously developed questionnaire survey refined through a piloting stage involving experienced industry professionals. The survey was ultimately distributed among participants based in Accra, Ghana, resulting in a response rate of approximately 63%.

Findings

The research identified diverse components contributing to subcontractor disruptions, highlighted the necessity of a clear regulatory framework, emphasized the impact of financial and leadership assessments on performance, and underscored the crucial role of main contractors in Integrated Project and Labour Cost Management with Subcontractor Oversight and Coordination.

Originality/value

Previous studies have not considered the challenges subcontractors face in projects. This investigation bridges this gap from multiple perspectives, using Bayesian network analysis to enhance subcontractor management, thereby contributing to the successful completion of construction projects.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 February 2023

Ying Lu, Jie Liu and Wenhui Yu

Mega construction projects (MCPs), which play an important role in the economy, society and environment of a country, have developed rapidly in recent years. However, due to…

Abstract

Purpose

Mega construction projects (MCPs), which play an important role in the economy, society and environment of a country, have developed rapidly in recent years. However, due to frequent social conflicts caused by the negative social impact of MCPs, social risk control has become a major challenge. Exploring the relationship between social risk factors and social risk from the perspective of risk evolution and identifying key factors contribute to social risk control; but few studies have paid enough attention to this. Therefore, this study aims to systematically analyze the impact of social risk factors on social risk based on a social risk evolution path.

Design/methodology/approach

This study proposed a social risk evolution path for MCPs explaining how social risk occurs and develops with the impact of social risk factors. To further analyze the impact quantitatively, a social risk analysis model combining structural equation model (SEM) with Bayesian network (BN) was developed. SEM was used to verify the relationship in the social risk evolution path. BN was applied to identify key social risk factors and predict the probabilities of social risk, quantitatively. The feasibility of the proposed model was verified by the case of water conservancy projects.

Findings

The results show that negative impact on residents’ living standards, public opinion advantage and emergency management ability were key social risk factors through sensitivity analysis. Then, scenario analysis simulated the risk probability results with the impact of different states of these key factors to obtain management strategies.

Originality/value

This study creatively proposes a social risk evolution path describing the dynamic interaction of the social risk and first applies the hybrid SEM–BN method in the social risk analysis for MCPs to explore effective risk control strategies. This study can facilitate the understanding of social risk from the perspective of risk evolution and provide decision-making support for the government coping with social risk in the implementation of MCPs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 16 June 2023

Sou-Sen Leu, Kuang-Jen Huang, Cathy Chang-Wei Hung and Pei-Lin Wu

In recent years, cost overrun becomes a common problem in steel building construction projects. The average percentage can vary widely depending on the project type, size…

Abstract

Purpose

In recent years, cost overrun becomes a common problem in steel building construction projects. The average percentage can vary widely depending on the project type, size, complexity and location. The steel structure change ratio in Taiwan is from 1 to 18% in statistics. The contractors always put every possible effort into preventing or mitigating project cost overruns, and one of the approaches is an accurate cost overrun risk estimate. Traditional project cost overrun risk assessment models mainly focus on macro-level evaluation and may not function well for the project-specific level (micro-level). This study creates a network-like connection model between the outcome (i.e. cost overrun risk) and the associated root causes in which the project status evaluation checklists of design, manufacturing, construction and interfaces are used to evaluate the checklists' influences through the Bayesian network (BN) composed by intermediate causes.

Design/methodology/approach

Due to the constraint of data availability, BN nodes, relationships and conditional probabilities are defined to establish a BN-based steel building project cost overrun assessment model following the knowledge of experts. Because of the complexity of the BN, the construction of the BN structure is first to build BN's fault tree (FT) hierarchy. And then, basic BN framework is constructed by the transformation of the FT hierarchy. Furthermore, some worthwhile additional arcs among BN nodes are inserted if necessary. Furthermore, conditional probability tables (CPTs) among BN nodes are explored by experts following the concept of the ranked node. Finally, the BN-based model was validated against the final cost analysis reports of 15 steel building projects done in Taiwan and both were highly consistent. The overall BN-based model construction process consists of three steps: (1) FT construction and BN framework transformation, (2) CPT computation and (3) model validation.

Findings

This study established a network-like bridge model between the outcome (i.e. cost overrun risk) and the root causes in a network of which cost influences are evaluated through the project-specific status evaluation checklists of design, manufacturing, construction and interfaces. This study overcame several limitations of the previous cost overrun risk assessment models: (1) few past research support assessment of cost overrun based on real-time project-owned data and (2) the traditional causal models inadequately depict interdependencies among influence factors of cost overrun at the network. The main influence factors of the cost overrun risk at the steel building projects in Taiwan were also examined using sensitivity analysis. The main root causes of cost overrun in steel building projects are design management and interface integration.

Originality/value

The proposed model belongs to the project-specific causal assessment model using real-time project-owned status checklist data as input. Such a model was seldom surveyed in the past due to the complicated interdependence among causes in the network. For practical use, a convenient and simple regression equation was also developed to forecast the cost overrun risk of the steel building project based on the root causes as input. Based on the analysis of cost overrun risk and significant influence factors, proper tailor-made preventive strategies are established to reduce the occurrence of cost overrun at the project.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 November 2023

Rajeev R. Bhattacharya and Mahendra R. Gupta

The authors provide a general framework of behavior under asymmetric information and develop indices of diligence, objectivity and quality by an analyst and analyst firm about a…

Abstract

Purpose

The authors provide a general framework of behavior under asymmetric information and develop indices of diligence, objectivity and quality by an analyst and analyst firm about a studied firm, and relate them to the accuracy of its forecasts. The authors test the associations of these indices with time.

Design/methodology/approach

The test of Public Information versus Non-Public Information Models provides the index of diligence, which equals one minus the p-value of the Hausman Specification Test of Ordinary Least Squares (OLS) versus Two Stage Least Squares (2SLS). The test of Objectivity versus Non-Objectivity Models provides the index of objectivity, which equals the p-value of the Wald Test of zero coefficients versus non-zero coefficients in 2SLS regression of the earnings forecast residual. The exponent of the negative of the standard deviation of the residuals of the analyst forecast regression equation provides the index of analytical quality. Each index asymptotically equals the Bayesian ex post probability, by the analyst and analyst firm about the studied firm, of the relevant behavior.

Findings

The authors find that ex post accuracy is a statistically and economically significant increasing function of the product of the indices of diligence, objectivity and quality by the analyst and analyst firm about the studied firm, which asymptotically equals the Bayesian ex post joint probability of diligence, objectivity and quality. The authors find that diligence, objectivity, quality and accuracy did not improve with time.

Originality/value

There has been no previous work done on the systematic and objective characterization and joint analysis of diligence, objectivity and quality of analyst forecasts by an analyst and analyst firm for a studied firm, and their relation with accuracy. This paper puts together the frontiers of various disciplines.

Details

Journal of Accounting Literature, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0737-4607

Keywords

Article
Publication date: 11 December 2023

Mohammad Hosein Madihi, Ali Akbar Shirzadi Javid and Farnad Nasirzadeh

In traditional Bayesian belief networks (BBNs), a large amount of data are required to complete network parameters, which makes it impractical. In addition, no systematic method…

Abstract

Purpose

In traditional Bayesian belief networks (BBNs), a large amount of data are required to complete network parameters, which makes it impractical. In addition, no systematic method has been used to create the structure of the BBN. The aims of this study are to: (1) decrease the number of questions and time and effort required for completing the parameters of the BBN and (2) present a simple and apprehensible method for creating the BBN structure based on the expert knowledge.

Design/methodology/approach

In this study, by combining the decision-making trial and evaluation laboratory (DEMATEL), interpretive structural modeling (ISM) and BBN, a model is introduced that can form the project risk network and analyze the impact of risk factors on project cost quantitatively based on the expert knowledge. The ranked node method (RNM) is then used to complete the parametric part of the BBN using the same data obtained from the experts to analyze DEMATEL.

Findings

Compared to the traditional BBN, the proposed method will significantly reduce the time and effort required to elicit network parameters and makes it easy to create a BBN structure. The results obtained from the implementation of the model on a mass housing project showed that considering the identified risk factors, the cost overruns relating to material, equipment, workforce and overhead cost were 37.6, 39.5, 42 and 40.1%, respectively.

Research limitations/implications

Compared to the traditional BBN, the proposed method will significantly reduce the time and effort required to elicit network parameters and makes it easy to create a BBN structure. The results obtained from the implementation of the model on a mass housing project showed that considering the identified risk factors, the cost overruns relating to material, equipment, workforce and overhead cost were 37.6, 39.5, 42 and 40.1%, respectively. The obtained results are based on a single case study project and may not be readily generalizable.

Originality/value

The presented framework makes the BBN more practical for quantitatively assessing the impact of risk on project costs. This helps to manage financial issues, which is one of the main reasons for project bankruptcy.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 October 2023

Muhammad Saiful Islam, Madhav Nepal and Martin Skitmore

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural…

Abstract

Purpose

Power plant projects are very complex and encounter serious cost overruns worldwide. Their cost overrun risks are not independent but interrelated in many cases, having structural relationships among each other. The purpose of this study is, therefore, to establish the complex structural relationships of risks involved.

Design/methodology/approach

In total, 76 published articles from the previous literature are reviewed using the content analysis method. Three risk networks in different phases of power plant projects are depicted based on literature review and case studies. The possible methods of solving these risk networks are also discussed.

Findings

The study finds critical cost overrun risks and develops risk networks for the procurement, civil and mechanical works of power plant projects. It identifies potential models to assess cost overrun risks based on the developed risk networks. The literature review also revealed some research gaps in the cost overrun risk management of power plants and similar infrastructure projects.

Practical implications

This study will assist project risk managers to understand the potential risks and their relationships to prevent and mitigate cost overruns for future power plant projects. It will also facilitate decision-makers developing a risk management framework and controlling projects’ cost overruns.

Originality/value

The study presents conceptual risk networks in different phases of power plant projects for comprehending the root causes of cost overruns. A comparative discussion of the relevant models available in the literature is presented, where their potential applications, limitations and further improvement areas are discussed to solve the developed risk networks for modeling cost overrun risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 January 2024

Michael O'Connell

The author examines the impact these efficient factors have on factor model comparison tests in US returns using the Bayesian model scan approach of Chib et al. (2020), and Chib…

Abstract

Purpose

The author examines the impact these efficient factors have on factor model comparison tests in US returns using the Bayesian model scan approach of Chib et al. (2020), and Chib et al.(2022).

Design/methodology/approach

Ehsani and Linnainmaa (2022) show that time-series efficient investment factors in US stock returns span and earn 40% higher Sharpe ratios than the original factors.

Findings

The author shows that the optimal asset pricing model is an eight-factor model which contains efficient versions of the market factor, value factor (HML) and long-horizon behavioral factor (FIN). The findings show that efficient factors enhance the performance of US factor model performance. The top performing asset pricing model does not change in recent data.

Originality/value

The author is the only one to examine if the efficient factors developed by Ehsani and Linnainmaa (2022) have an impact on model comparison tests in US stock returns.

Details

Journal of Economic Studies, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0144-3585

Keywords

1 – 10 of 543