Search results

1 – 8 of 8
Article
Publication date: 5 December 2022

S. Sathvik, L. Krishnaraj and Bankole Osita Awuzie

Sleep quality has been associated with health and safety issues influencing construction labour productivity in developing countries. Despite its significantly adverse…

Abstract

Purpose

Sleep quality has been associated with health and safety issues influencing construction labour productivity in developing countries. Despite its significantly adverse contribution to these facets if left unattended to, limited studies have sought to establish its prevalence and causal factors in labour-intensive contexts. This study aims to bridge the gap between the prevalence and casual factors of poor sleep quality among construction workers.

Design/methodology/approach

Adopting a case study research design, data were collected from a randomly selected sample of construction workers (n = 475) recruited from four construction-based corporations in Southern India. Self-administered questionnaires comprising a Pittsburgh Sleep Quality Index (PSQI) scale was used to measure sleep quality among respondents alongside demographic characteristics, lifestyle preferences and work-habits data. Data were analysed using multivariate logistic regression analysis and descriptive statistical techniques.

Findings

Slightly more than a third of the construction workers (n = 33.9%) surveyed experienced poor sleep quality based on a PSQI method score of = 5. Also, the nexus between demographic characteristics, lifestyle preferences and work habits on the incidence of poor sleep quality among construction workers was confirmed.

Practical implications

The study contributes to the contemporary discourse on improving sleep health of construction workers to enhance their well-being thereby enabling their contribution towards achieving improved construction labour productivity.

Originality/value

This study makes an original contribution to the extent that it seeks to not only determine the prevalence of sleep quality within the construction industry and associated causal factors but to explore its implications on construction labour productivity.

Details

Built Environment Project and Asset Management, vol. 13 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 19 June 2020

Chikezirim Okorafor, Fidelis Emuze, Dillip Das, Bankole Osita Awuzie and Theo Haupt

The built environment is well known for carbon emission and its impact especially as it pertains to existing buildings. This has culminated in an increasing need for a retrofit of…

Abstract

Purpose

The built environment is well known for carbon emission and its impact especially as it pertains to existing buildings. This has culminated in an increasing need for a retrofit of such buildings. This study details the development of an artefact for improving the delivery of energy retrofit projects therein to curb these impacts.

Design/methodology/approach

The study utilized a mixed method research design for data collection. In achieving this, data was collected in three different phases; (1) a pilot study; (2) a juxtaposition of desktop case studies, live case studies, focus group discussion forum and an expert survey; and (3) a questionnaire survey for the validation of the emergent artefact. Accordingly, the quantitative data was analysed using descriptive statistics, whereas qualitative content analysis was deployed for qualitative data.

Findings

The findings enabled an identification of the elements of a building energy retrofit project (BERP) such as project initiation, building assessment, detailed energy survey, technical analysis and implementation plans of energy measures, monitoring and verification. Also, it provided the challenges and enablers associated with successful BERP. This information was subsequently utilized in the development and validation of an artefact for delivering successful BERP. Summarily, a set of guidelines comprising of seven stages for managing successful BERPs were elucidated.

Practical implications

The validated artefact provides an adaptive and innovative route for achieving sustainability in retrofit trade.

Originality/value

The study conceptualizes an artefact for improving the delivery of BERPs.

Details

Built Environment Project and Asset Management, vol. 10 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 4 September 2020

Seeram Ramakrishna, Alfred Ngowi and Bankole Osita Awuzie

125

Abstract

Details

Built Environment Project and Asset Management, vol. 10 no. 4
Type: Research Article
ISSN: 2044-124X

Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 September 2020

Olalekan Shamsideen Oshodi, Bankole Osita Awuzie, Julius Akotia, Adesola S. Ademiloye and Alfred Ngowi

The use of recycled concrete (RC) can reduce the greenhouse emissions associated with the production of cement, which is one of the primary materials used for the execution of…

Abstract

Purpose

The use of recycled concrete (RC) can reduce the greenhouse emissions associated with the production of cement, which is one of the primary materials used for the execution of construction projects. This research aims to review the state of knowledge in the field of RC research. An understanding of the state of the art in the RC domain justifies future research in this field.

Design/methodology/approach

A systematic and comprehensive search of RC-related literature was conducted using the Scopus database. In this research, the bibliometrix R-package was used for the analysis of bibliometric information of the selected papers. The software was used to create a map, which highlights the trends and gaps in the RC knowledge domain.

Findings

The results reveal the research themes, clusters, collaboration networks and advancement of knowledge in the field of RC research. The study integrates the literature focussed on RC research and provides a platform for progression of knowledge in this field.

Originality/value

The study contributes to the growing body of knowledge by providing an up-to-date RC knowledge map based on an analysis of bibliographic data. Information gleaned from previous studies suggests that bibliometric review can strengthen and complement the findings emerging from other forms of literature reviews. The study reported here is one of the first studies to provide insights into the evolution of RC research.

Details

Built Environment Project and Asset Management, vol. 10 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 13 April 2018

Rasheed Isa, Fidelis Emuze, Dillip Das and Bankole Osita Awuzie

The purpose of this paper is to propose a model for operationalizing the integrated use of lean and sustainability concepts for infrastructure delivery. This model is premised on…

Abstract

Purpose

The purpose of this paper is to propose a model for operationalizing the integrated use of lean and sustainability concepts for infrastructure delivery. This model is premised on the need for the attainment of a sustainable built environment through efficient infrastructure delivery.

Design/methodology/approach

A case study research design was used in assessing five purposively selected cases within Gauteng province in South Africa. These facilities attained Green Building Council of South Africa ratings of 5- to 6-star, for the rating of green buildings and available evidence of integration of lean principles at the developmental stage. Questionnaires were administered to project’s role-players and semi-structured interviews were conducted with the users and facility managers, in order to elicit data for the model development. Questionnaire survey was adopted for the model validation.

Findings

The lean-sustainability platform for infrastructure delivery demonstrates features such as resources, drivers, barriers, activities, outputs, the results, and the ultimate impact. The findings give insight into various components of the model. It validates its robustness and highlights leadership among other critical factors necessary for successful operationalization of the lean-sustainability ethos required to transform the delivery of infrastructure.

Practical implications

The developed model provides a transformational route for achieving infrastructure sustainability. The lean-sustainable indicators identified will serve as evaluation tools for assessing lean-sustainability ethos during the delivery phases of infrastructure projects.

Originality/value

The model provides a new way of thinking about infrastructure project delivery regarding the need to promote sustainability in the built environment.

Details

Built Environment Project and Asset Management, vol. 8 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 7 November 2016

Amal Abuzeinab, Mohammed Arif, Dennis J. Kulonda and Bankole Osita Awuzie

Sustainability has the potential to bring enormous benefits to our built environment. To release this potential, a change in business models is required. The purpose of this paper…

1080

Abstract

Purpose

Sustainability has the potential to bring enormous benefits to our built environment. To release this potential, a change in business models is required. The purpose of this paper is to investigate green business models (GBMs) transformation by adopting five essential elements of green value creation and capture: green value proposition (GVP), target group (TG), key activities (KA), key resources (KR), and financial logic (FL).

Design/methodology/approach

In this qualitative study, 19 semi-structured interviews were conducted. Interviewees were selected purposively. The emergent data were analysed with the aid of themes.

Findings

It was observed that significant effort was being made towards enabling the transformation of certain elements pertinent to green value creation: KA and KR. This was particularly so when compared to other elements like GVP, TG, and FL.

Practical implications

Findings from this study should encourage construction managers to align their extant BMs to green activities hence enabling new approaches to green value creation and capture. Furthermore, the study will aid in improving the environmental and economic positions of the value chain within the construction sector.

Originality/value

This research is one of the few empirical academic works investigating GBMs in the construction sector.

Details

Built Environment Project and Asset Management, vol. 6 no. 5
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 4 October 2021

Mercy Ogunnusi, Temitope Omotayo, Mansur Hamma-Adama, Bankole Osita Awuzie and Temitope Egbelakin

The construction industry represents most of every country’s finances and vital to continued economic growth and activities, especially in developing countries. The impact of the…

3478

Abstract

Purpose

The construction industry represents most of every country’s finances and vital to continued economic growth and activities, especially in developing countries. The impact of the severe acute respiratory syndrome-2 disease (COVID19) on the government’s income resulted in the expectation of many public projects being cancelled or delayed providing little opportunity for the emergence of new public projects. This study collated a global qualitative perspective (survey interviews) on the lessons learned during the COVID-19 pandemic and the positive and negative impacts for future-proofing the construction sector.

Design/methodology/approach

In total, 76 respondents from five continents excluding South America responded to the online open-ended structured questionnaire. Data collected were analysed through artificial inteligence analytics tool – Zoho analytics.

Findings

The themes indicating the positive impact obtained from the interview were overhead cost reduction, remote working environment, focus on health and safety, improved productivity and sustainability goals while the themes signifying the negative impact were low business turnover, delays in construction payment and output, difficulties working from home and job losses. Supply chain management, construction project management improvement, concentration on health and safety and effective virtual working environment were collated as themes on lessons learned.

Social implications

The major findings of this study emphasise on the need to improve the occupational health and safety and onsite safety measures for future proofing of the construction industry.

Originality/value

The findings from the analyses made clear the imperativeness of the built environment research, with a focus on novel framework and strategies for future proofing the construction industry.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 8 of 8