Search results

1 – 10 of 27
Open Access
Article
Publication date: 12 May 2023

Olivia McDermott, Kevin ODwyer, John Noonan, Anna Trubetskaya and Angelo Rosa

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to…

79278

Abstract

Purpose

This study aims to improve a construction company's overall project delivery by utilising lean six sigma (LSS) methods combined with building information modelling (BIM) to design, modularise and manufacture various building elements in a controlled factory environment off-site.

Design/methodology/approach

A case study in a construction company utilised lean six sigma (LSS) methodology and BIM to identify non-value add waste in the construction process and improve sustainability.

Findings

An Irish-based construction company manufacturing modular pipe racks for the pharmaceutical industry utilised LSS to optimise and standardise their off-site manufacturing (OSM) partners process and leverage BIM to design skids which could be manufactured offsite and transported easily with minimal on-site installation and rework required. Productivity was improved, waste was reduced, less energy was consumed, defects were reduced and the project schedule for completion was reduced.

Research limitations/implications

The case study was carried out on one construction company and one construction product type. Further case studies would ensure more generalisability. However, the implementation was tested on a modular construction company, and the methods used indicate that the generic framework could be applied and customized to any offsite company.

Originality/value

This is one of the few studies on implementing offsite manufacturing (OSM) utilising LSS and BIM in an Irish construction company. The detailed quantitative benefits and cost savings calculations presented as well as the use of the LSM methods and BIM in designing an OSM process can be leveraged by other construction organisations to understand the benefits of OSM. This study can help demonstrate how LSS and BIM can aid the construction industry to be more environmentally friendly.

Details

International Journal of Lean Six Sigma, vol. 15 no. 8
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 17 January 2024

Obinna Chinedu Okezue, Madonna Uzoigwe, Livinus Ekene Ugwu, Jeneviv Nene John, Davidson Okwudili John and Ukamaka Gloria Mgbeojedo

This study aims to explore the level of independence among persons with disabilities (PWDs) towards their use of public buildings’ facilities, as well as assess the anxiety and…

Abstract

Purpose

This study aims to explore the level of independence among persons with disabilities (PWDs) towards their use of public buildings’ facilities, as well as assess the anxiety and relevant challenges regarding such use.

Design/methodology/approach

In a cross-sectional survey design, 91 consenting PWDs were recruited via purposive sampling at diverse locations and invited to complete self-report questionnaires on their use of public buildings’ facilities.

Findings

Only 19 PWDs (20.9%) were able to independently use such facilities. The participants’ level of anxiety, observed to be mostly severe (41.7%), was significantly associated with sex and affected body region (p < 0.05). Most PWDs identified “lack of amenities” (85.7%), “inconvenience” (78%) and “safety issues” (59.4%) as relevant challenges towards the use of public buildings’ facilities.

Research limitations/implications

This research emphasises the urgent need to universally improve PWDs’ level of independence towards the use of public buildings’ facilities alongside eradicating anxiety and challenges experienced towards such use. Accessibility ought to be promoted among PWDs, with specific attention given to women and those affected in multiple body regions; as such populations are prone to experiencing substantial anxiety. This approach should entail the provision of barrier-free facilities as well as ensuring their safe and convenient use by PWDs.

Originality/value

This study sought and provided key feedback from PWDs on the current built environment, which ought to be considered by relevant stakeholders to improve accessibility, promote well-being and contribute towards meeting the global goals of reducing inequality and making cities/communities inclusive, safe, resilient and sustainable.

Details

Facilities , vol. 42 no. 5/6
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 15 April 2024

Shiwangi Singh, Sanjay Dhir, Vellupillai Mukunda Das and Anuj Sharma

While extant literature explores the influence of institutions on the national innovation system (NIS), most research has either focused on specific institutional aspects or…

Abstract

Purpose

While extant literature explores the influence of institutions on the national innovation system (NIS), most research has either focused on specific institutional aspects or treated institutions as a unified entity. This study aims to examine the effect of various institutional factors on a country’s NIS.

Design/methodology/approach

The conceptual model was empirically validated using regression analysis. The study sample comprised a total of 84 countries.

Findings

This study identifies and empirically validates a comprehensive set of institutional factors. It also highlights the significant institutional factors (including political stability, government effectiveness, ease of resolving insolvency and the rule of law) that can help improve a country’s NIS.

Originality/value

The research provides practical implications for organizations and policymakers seeking to understand and foster an innovative culture within the NIS. Policymakers are encouraged to develop a nurturing environment within the NIS by focusing on significant institutional factors. Organizations are encouraged to closely monitor developments in the NIS of a country to make informed strategic decisions at the business, corporate and international levels.

Details

Journal of Science and Technology Policy Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2053-4620

Keywords

Article
Publication date: 5 January 2024

Madurachcharige Hasini Vidushima Fernando, Duleepa Dulshan Costa, Buddha Koralage Malsha Nadeetharu and Udayangani Kulatunga

A comprehensive literature review was conducted to identify the lean principles and the challenges of building refurbishment. To have an in-depth investigation of the application…

82

Abstract

Purpose

A comprehensive literature review was conducted to identify the lean principles and the challenges of building refurbishment. To have an in-depth investigation of the application of lean principles to address the challenges of refurbishment projects, ten expert interviews following a qualitative research approach were utilised in this research. Data were analysed using manual content analysis to derive the framework.

Design/methodology/approach

The refurbishment of buildings has attracted the attention of the present construction industry. However, uncertain project characteristics, information deficiency, limited space for construction activities and less stakeholder involvement make it complex. Since the lean concept effectively deals with complex and uncertain projects, this study focusses to investigate the application of lean principles to overcome the challenges of refurbishment projects in Sri Lanka by developing a framework.

Findings

It was found that the five main lean principles of customer value, value stream, value flow, pull and perfection are appropriate for building refurbishment projects in Sri Lanka. Precise identification of clients and end-users, value adding and non-value adding activities, interruptions and stakeholder communication chains, setting scope, examining the possible technologies and taking measures to deliver the exact product to ensure the successful application of lean principles for refurbishment projects. Further, 27 benefits of five lean principles were identified which can be used to address the 13 identified challenges of building refurbishment of projects. Finally, a framework has developed portraying the application of lean principles in building refurbishment.

Practical implications

The framework developed is beneficial for the building refurbishment project team to address the barriers of refurbishment projects by applying lean principles.

Originality/value

This framework can be used as a guideline for the implementation of building refurbishment projects by addressing their challenges with lean principles.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 2 April 2024

Fatima Saeed Al-Dhuhouri, Faridahwati Mohd-Shamsudin and Shaker Bani-Melhem

The literature on workplace ostracism lacks the integration of the antecedents and consequences of ostracism in a single study, hindering a holistic picture of how perceived…

Abstract

Purpose

The literature on workplace ostracism lacks the integration of the antecedents and consequences of ostracism in a single study, hindering a holistic picture of how perceived workplace ostracism (PWO) emerges and subsequently hampering theoretical development and practical intervention. Based on this critical gap, we examine the effect of person-organization unfit and interpersonal distrust as potential antecedents of PWO, which we propose to affect employee silence. Furthermore, we highlight PWO as a mediator linking interpersonal distrust and person-organization unfit to employee silence. In addition, we further investigate the boundary condition of ethical leadership to address when the effect of PWO on employee silence can be potentially mitigated.

Design/methodology/approach

Survey data were collected from 242 service industry employees in the United Arab Emirates, and analyzed using PLS-SEM.

Findings

Both person-organization unfit and interpersonal distrust lead to PWO, increasing employee silence. Feeling ostracized serves as a mediator, linking interpersonal distrust and person-organization unfit to employee silence. Ethical leadership moderates this, reducing the ostracism’s impact on silence, showcasing its value in mitigating harmful workplace dynamics.

Practical implications

The study is useful for organizations and managers as it illustrates the causes and consequence of PWO and provides practical solutions.

Originality/value

This study is one of the scarce endeavors to holistically investigate workplace ostracism by testing its antecedents and consequence in a single model. Furthermore, it explores person-organization unfit as a novel antecedent of PWO.

Details

International Journal of Organization Theory & Behavior, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1093-4537

Keywords

Article
Publication date: 7 June 2023

Khalil Idrissi Gartoumi, Mohamed Aboussaleh and Smail Zaki

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation…

Abstract

Purpose

This paper aims to explore a framework for implementing Lean Construction (LC) to provide corrective actions for quality defects, customer dissatisfaction and value creation during the construction of megaprojects.

Design/methodology/approach

This paper presents a case study involving the construction of the Mohamed VI Tower in Morocco. It is the tallest tower in Africa, with 55 floors and a total height of 250 m. This study of the quality of the work and the involvement of the LC was carried out using the Define–Measure–Analysis–Improve–Control approach from Lean six sigma. It describes the Critical to Quality and analyses the root causes of quality defects, customer dissatisfaction and variation in the quality process.

Findings

Firstly, the results of this study map the causal factors of lack of quality as established in the literature. Secondly, the LC tools have reduced non-value-added sources of quality waste and, consequently, improved critical quality indicators.

Research limitations/implications

This document focuses on one part of the tower’s construction and is limited to a project case in a country where LC is rarely used.

Originality/value

This study reinforces the literature reviews, surveys and the small number of case studies that have validated the potential of LC and further clarifies future directions for the practical emergence of this quality improvement approach, especially for large-scale projects.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 26 March 2024

Mughees Aslam, Edmund Baffoe-Twum and Sohail Malik

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the…

Abstract

Purpose

Lean construction (LC) is an innovative approach in the construction industry that has shown significant success in developed countries. Although LC has potential in the construction sector of Pakistan, it has not been extensively explored. This study aims to address this knowledge gap by identifying and predicting current lean practices and assessing the strengths and weaknesses of LC implementation in Pakistan.

Design/methodology/approach

Using robust statistical methods to analyze 92 valid responses, the study reveals that approximately 54% of lean practices are currently in use in the construction industry of Pakistan, with a population mean ranging from 52.7% to 55.6%.

Findings

Surprisingly, the research identifies instances where some construction firms in Pakistan are implementing LC practices, even though they have only a limited understanding of its underlying principles. Notably, certain subprinciples, such as visual management, top management commitment to change, employee training, process cycle time reduction and production optimization, are less integrated within the construction industry. Exploring the possibility of implementing LC, recommendations for strategies to implement LC in Pakistan are suggested, aligning with the conceptual model proposed by the researchers.

Originality/value

The novelty of this work offers insights that can serve as a comprehensive guide for developing nations. It provides a structured approach to assess and benchmark LC practices, which, in turn, can contribute to a more efficient and effective construction industry. Moreover, the strategies proposed in this research can aid developing countries in the efficient implementation of LC. This will have a positive implication for both economic and developmental outcomes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 26 March 2024

Andrew Ebekozien, Clinton Aigbavboa, Mohamad Shaharudin Samsurijan, Noor Alyani Nor Azazi and Okechukwu Dominic Saviour Duru

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle…

Abstract

Purpose

Studies show that building information modelling (BIM) technology can improve construction productivity regarding the design, construction and maintenance of a project life cycle in the 21st century. Revit has been identified as a frequently used tool for delivering BIM in the built environment. Studies about BIM technology via Revit are scarce in training middle-level workforce higher education institutions. Thus, this study aims to investigate the relevance of BIM technology and offer measures to promote digitalisation in Nigeria’s built environment polytechnic undergraduates via Revit.

Design/methodology/approach

Given the unexplored nature of training the middle-level workforce in Nigeria, 37 semi-structured virtual interviews were conducted across Nigeria, and saturation was achieved. The participants were knowledgeable about construction-related BIM. The researchers used a thematic analysis for the collected data and honed them with secondary sources.

Findings

Improved visualisation of design, effective and efficient work productivity, automatic design and quantification, improved database management and collaboration and data storage in the centrally coordinated model, among others, emerged as BIM’s benefits. BIM technology via Revit is challenging, especially in Nigeria’s polytechnic education curriculum. The 24 perceived issues were grouped into government/regulatory agencies-related, polytechnic management-related and polytechnic undergraduate students-related hindrances in Nigeria’s built environment.

Research limitations/implications

This study is limited to BIM implications for Nigeria’s built environment polytechnic undergraduates.

Originality/value

This study contributes to the literature paucity in attempting to uncover perceived issues hindering the implementation of BIM technology via Revit in training Nigeria’s built environment polytechnic undergraduates via a qualitative approach.

Open Access
Article
Publication date: 31 October 2023

Emilia Kääriä and Ahm Shamsuzzoha

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the…

1175

Abstract

Purpose

This study is focused to support an ongoing development project of the case company's current state and the challenges of the order-to-cash (O2C) process. The O2C process is the most visible process to the customer, and therefore, its punctual and fluent order management is vital. It is observed that the high degree of manual work in the O2C process causes mistakes, delays and rework in the process. The purpose of this article is therefore to analyze the case company's current state of the O2C process as well as to identify the areas of development in this process by deploying the means of Lean Six Sigma tools such as value stream mapping (VSM).

Design/methodology/approach

The study was conducted as a mix of quantitative and qualitative analysis. Based on both the quantitative and qualitative data, a workshop on VSM was organized to analyze the current state of the O2C process of a case company, engaged in the energy and environment sector in Finland.

Findings

The results found that excessive manual work was highly connected to inadequate or incorrect data in pricing and invoicing activities, which resulted in canceled invoices. Canceled invoices are visible to the customer and have a negative impact on the customer experience. This study found that by improving the performance of the O2C process activities and improving communication among the internal and external stakeholders, the whole O2C process can perform more effectively and provide better customer value.

Originality/value

The O2C process is the most visible process to the customer and therefore its punctual and fluent order management is vital. To ensure that the O2C process is operating as desired, suitable process performance metrics need to be aligned and followed. The results gathered from the case company's data, questionnaire interviews, and the VSM workshop are all highlighted in this study. The main practical and managerial implications were to understand the real-time O2C process performance, which is necessary to ensure strong performance and enhance continuous improvement of the O2C process that leads to operational excellence and commercial competitiveness of the studied case company.

Details

International Journal of Productivity and Performance Management, vol. 73 no. 11
Type: Research Article
ISSN: 1741-0401

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 27