Article
Publication date: 29 January 2024

Klaudia Jaskula, Dimosthenis Kifokeris, Eleni Papadonikolaki and Dimitrios Rovas

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is…

Abstract

Purpose

Information management workflow in building information modelling (BIM)-based collaboration is based on using a common data environment (CDE). The basic premise of a CDE is exposing all relevant data as a single source of truth and facilitating continuous collaboration between stakeholders. A multitude of tools can be used as a CDE, however, it is not clear how the tools are used or if they fulfil the users’ needs. Therefore, this paper aims to investigate current practices of using CDEs for information management during the whole built asset’s life cycle, through a state-of-the-art literature review and an empirical study.

Design/methodology/approach

Literature data is collected according to the PRISMA 2020 guideline for reporting systematic reviews. This paper includes 46 documents in the review and conduct a bibliometric and thematic analysis to identify the main challenges of digital information management. To understand the current practice and the views of the stakeholders using CDEs in their work, this paper used an empirical approach including semi-structured interviews with 15 BIM experts.

Findings

The results indicate that one of the major challenges of CDE adoption is project complexity and using multiple CDEs simultaneously leading to data accountability, transparency and reliability issues. To tackle those challenges, the use of novel technologies in CDE development such as blockchain could be further investigated.

Originality/value

The research explores the major challenges in the practical implementation of CDEs for information management. To the best of the authors’ knowledge, this is the first study on this topic combining a systematic literature review and fieldwork.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 February 2023

Mostafa Dadashi Haji and Behrouz Behnam

It is a well-accepted note that to enhance safety performance in a project by preventing hazards, recognizing the safety leading indicators is of paramount importance.

Abstract

Purpose

It is a well-accepted note that to enhance safety performance in a project by preventing hazards, recognizing the safety leading indicators is of paramount importance.

Design/methodology/approach

In this research, the relationship between safety leading indicators is determined, and their impacts on the project are assessed and visualized throughout the time of the project in a proactive manner. Construction and safety experts are first interviewed to determine the most important safety leading indicators of the construction industry, and then the relationships that may exist between them are identified. Furthermore, a system dynamics model is generated using the interviews and integrated with an add-on developed on the building information modeling (BIM) platform. Finally, the impacts of the safety leading indicators on the project are calculated based on their time of occurrence, impact time and effective radius.

Findings

The add-on generates a heat-map that visualizes the impacts of the safety leading indicators on the project through time. Moreover, to assess the effectiveness of the developed tool, a case study is conducted on a station located on a water transfer line. In order to validate the results of the tool, a survey is also conducted from the project's staff and experts in the field. Previous studies have so far focused on active safety leading indicators that may result in a particular hazard, and the importance of the effects that safety leading indicators have on another is not considered. This study considers their effects on each other in a real-time manner.

Originality/value

Using this tool project's stakeholders and staff can identify the hazards proactively; hence, they can make the required decisions in advance to reduce the impact of associated events. Moreover, two other potentially contributions of the presented work can be enumerated as: firstly, the findings provide a knowledge framework of active safety leading indicators and their interactions for construction safety researchers who can go on to further study safety management. Secondly, the proposed framework contributes to encouragement of time-based location-based preventive strategies on construction sites.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 11 December 2023

Muhammad Ashraf Fauzi, Khairul Firdaus Anuar, Nurhaizan Mohd Zainudin, Mohd Hanafiah Ahmad and Walton Wider

This study evaluates the knowledge structure of building information modeling (BIM) in green buildings. Buildings are one of the main contributors to carbon emissions, and…

Abstract

Purpose

This study evaluates the knowledge structure of building information modeling (BIM) in green buildings. Buildings are one of the main contributors to carbon emissions, and implementing BIM in green buildings is seen as an indispensable approach to mitigate environmental and climate change issues.

Design/methodology/approach

Through a bibliometric analysis, 297 publications retrieved from the Web of Science (WoS) were analyzed to explore their intellectual structure.

Findings

Bibliographic coupling analysis produced four clusters on current and emerging trends, while co-word analysis produced four clusters on future BIM and green building trends. Current and emerging trends revolve around BIM adoption in green and existing buildings, life cycle analysis (LCA) and sustainable rating tools. Future trends related to BIM and performance analysis and optimization, the BIM framework for green building design and construction, overcoming barriers and maximizing benefits in BIM adoption.

Research limitations/implications

The implications of this study are relevant to all BIM and green building stakeholders, including developers, engineers, architects, occupants, tenants and the whole community.

Originality/value

This study examines the crucial integration of BIM and green building within the more extensive construction and building field scope.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 14 July 2023

Bowen Zheng, Mudasir Hussain, Yang Yang, Albert P.C. Chan and Hung-Lin Chi

In the last decades, various building information modeling–life cycle assessment (BIM-LCA) integration approaches have been developed to assess the environmental impact of the…

Abstract

Purpose

In the last decades, various building information modeling–life cycle assessment (BIM-LCA) integration approaches have been developed to assess the environmental impact of the built asset. However, there is a lack of consensus on the optimal BIM-LCA integration approach that provides the most accurate and efficient assessment outcomes. To compare and determine their accuracy and efficiency, this study aimed to investigate four typical BIM-LCA integration solutions, namely, conventional, parametric modeling, plug-in and industry foundation classes (IFC)-based integration.

Design/methodology/approach

The four integration approaches were developed and applied using the same building project. A quantitative technique for evaluating the accuracy and efficiency of BIM-LCA integration solutions was used. Four indicators for assessing the performance of BIM-LCA integration were (1) validity of LCA results, (2) accuracy of bill-of-quantity (BOQ) extraction, (3) time for developing life cycle inventories (i.e. developing time) and (4) time for calculating LCA results (i.e. calculation time).

Findings

The results show that the plug-in-based approach outperforms others in developing and calculation time, while the conventional one could derive the most accuracy in BOQ extraction and result validity. The parametric modeling approach outperforms the IFC-based method regarding BOQ extraction, developing time and calculation time. Despite this, the IFC-based approach produces LCA outcomes with approximately 1% error, proving its validity.

Originality/value

This paper forms one of the first studies that employ a quantitative and objective method to determine the performance of four typical BIM-LCA integration solutions and reveal the trade-offs between the accuracy and efficiency of the integration approaches. The findings provide practical references for LCA practitioners to select appropriate BIM-LCA integration approaches for evaluating the environmental impact of the built asset during the design phase.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 March 2024

Pengcheng Pan, Yu Wang, Yumiao Yang and Sujuan Zhang

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in…

Abstract

Purpose

Building Information Modeling (BIM) capabilities have been studied at the individual, project, organizational, and even industry levels to ensure the realization of BIM value in the architectural, engineering, construction, and operation industry. However, limited research has focused on a project owner organization perspective to investigate owner BIM capabilities that are required to ensure effective project management and delivery. This present study aims to propose an indicator framework to evaluate owner BIM capabilities at the organizational level.

Design/methodology/approach

Leveraging the existing literature on BIM capabilities and synthesizing insights from the resource-based view and information technology capabilities research, this study conceptualizes the BIM capabilities of project owner organizations and offers a framework of indicators for measurement. Semi-structured interviews with BIM experts and a questionnaire survey were conducted to identify key indicators affecting owner BIM capabilities. A six-dimensional structural equation model with 29 indicators was then established.

Findings

The findings highlight the multidimensionality of owner BIM capabilities and show that process capabilities play a crucial role in enhancing owner BIM capabilities, while technical capabilities are considered as the least important aspect.

Research limitations/implications

The study sheds light on the key role of project owner organizations in ensuring BIM value and suggests that project owners focus more on the organizational processes of introducing BIM in managing projects.

Originality/value

This study reconceptualizes owner BIM capabilities drawing on the idea of resource-based view and information technology capabilities and highlights the important dimensions and indicators of owner BIM capabilities at the organizational level.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 December 2022

Hanane Bouhmoud, Dalila Loudyi and Salman Azhar

Considering the world population, an additional 415.1 billion m2 of built floor will be needed by 2050, which could worsen the environmental impact of the construction industry…

Abstract

Purpose

Considering the world population, an additional 415.1 billion m2 of built floor will be needed by 2050, which could worsen the environmental impact of the construction industry that is responsible for one-third of global Carbon Emissions (CEs). Thus, the current construction practices need to be upgraded toward eco-friendly technologies. Building Information Modeling (BIM) proved a significant potential to enhance Building and Infrastructure (B&I) ecological performances. However, no previous study has evaluated the nexus between BIM and B&I CEs. This study aims to fill this gap by disclosing the research evolution and metrics and key concepts and tools associated with this nexus.

Design/methodology/approach

A mixed-method design was adopted based on scientometric and scoping reviews of 52 consistent peer-reviewed papers collected from 3 large scientific databases.

Findings

This study presented six research metrics and revealed that the nexus between BIM and CEs is a contemporary topic that involves seven main research themes. Moreover, it cast light on six key associated concepts: Life Cycle Assessment; Boundary limits; Building Life Cycle CE (BLCCE); Responsible sources for BLCCE; Green and integrated BIM; and sustainable buildings and related rating systems. Furthermore, it identified 56 nexus-related Information and Communication Technologies tools and 17 CE-coefficient databases and discussed their consistency.

Originality/value

This study will fill the knowledge gap by providing scholars, practitioners and decision-makers with a good grasp of the nexus between CEs and BIM and paving the path toward further research, strategies and technological solutions to decrease CEs of B&I sectors and their impacts on the climate change.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 31 October 2023

Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…

Abstract

Purpose

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.

Design/methodology/approach

Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.

Findings

A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.

Practical implications

The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.

Originality/value

To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 28 February 2023

Sara Rashidian, Robin Drogemuller, Sara Omrani and Fereshteh Banakar

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving…

Abstract

Purpose

The application of integrated project delivery (IPD) in conjunction with building information modeling (BIM) and Lean Construction (LC) as the efficient method for improving collaboration and delivering construction projects has been acknowledged by construction academics and professionals. Once organizations have fully embraced BIM, IPD and LC integration, a measurement tool such as a maturity model (MM) for benchmarking their progress and setting realistic goals for continuous improvement will be required. In the context of MMs literature, however, no comprehensive analysis of these three construction management methods has been published to reveal the current trends and common themes in which the models have approached each other.

Design/methodology/approach

Therefore, this study integrates systematic literature review (SLR) and thematic analysis techniques to review and categorize the related MMs; the key themes in which the interrelationship between BIM, IPD and LC MMs has been discussed and conceptualized in the attributes; the shared characteristics of the existing BIM, IPD and LC MMs, as well as their strengths and limitations. The Preferred Reporting Items for Systematic Reviews (PRISMA) method has been used as the primary procedure for article screening and reviewing published papers between 2007 and 2022.

Findings

Despite the growth of BIM, IPD and LC integration publications and acknowledgment in the literature, no MM has been established that holistically measures BIM, IPD and LC integration in an organization. This study identifies five interrelated and overlapping themes indicative of the collaboration of BIM, IPD and LC in existing MMs' structure, including customer satisfaction, waste minimization, Lean practices and cultural and legal aspects. Furthermore, the MMs' common characteristics, strengths and limitations are evaluated to provide a foundation for developing future BIM, IPD and LC-related MMs.

Practical implications

This paper examines the current status of research and the knowledge gaps around BIM, IPD and LC MMs. In addition, the highlighted major themes serve as a foundation for academics who intend to develop integrated BIM, IPD, and LC MMs. This will enable researchers to build upon these themes and establish a comprehensive list of maturity attributes fulfilling the BIM, IPD and LC requirements and principles. In addition, the MMs' BIM, IPD and LC compatibility themes, which go beyond themes' intended characteristics in silos, increase industry practitioners' awareness of the underlying factors of BIM, IPD and LC integration.

Originality/value

This review article is the first of a kind to analyze the interaction of IPD, BIM and LC in the context of MMs in current AEC literature. This study concludes that BIM, IPD and LC share several joint cornerstones according to the existing MMs.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 26 January 2022

The-Quan Nguyen, Eric C.W. Lou and Bao Ngoc Nguyen

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers…

Abstract

Purpose

This paper aims to provide an integrated BIM-based approach for quantity take-off for progress payments in the context of high-rise buildings in Vietnam. It tries to find answers for the following questions: (1) When to start the QTO processes to facilitate the contract progress payments? (2) What information is required to measure the quantity of works to estimate contract progress payment (3) What are the challenges to manage (i.e. create, store, update and exploit)? What are the required information for this BIM use? and (4) How to process the information to deliver BIM-based QTO to facilitate contract progress payment?

Design/methodology/approach

The paper applied a deductive approach and expert consensus through a Delphi procedure to adapt to current innovation around BIM-based QTO. Starting with a literature review, it then discusses current practices in BIM-based QTO in general and high-rise building projects in particular. Challenges were compiled from the previous studies for references for BIM-based QTO to facilitate contract progress payment for high-rise building projects in Vietnam. A framework was developed considering a standard information management process throughout the construction lifecycle, when the BIM use of this study is delivered. The framework was validated with Delphi technique.

Findings

Four major challenges for BIM-based QTO discovered: new types of information required for the BIM model, changes and updates as projects progress, low interoperability between BIM model and estimation software, potentiality of low productivity and accuracy in data entry. Required information for QTO to facilitate progress payments in high-rise building projects include Object Geometric/Appearance Information, Structural Components' Definition and Contextual Information. Trade-offs between “Speed – Level of Detail–Applicable Breadth” and “Quality – Productivity” are proposed to consider the information amount to input at a time when creating/updating BIM objects. Interoperability check needed for creating, authoring/updating processing the BIM model's objects.

Research limitations/implications

This paper is not flawless. The first limitation lies in that the theoretical framework was established only based on desk research and small number of expert judgment. Further primary data collection would be needed to determine exactly how the framework underlies widespread practices. Secondly, this study only discussed the quantity take-off specifically for contract progress payment, but not for other purposes or broader BIM uses. Further research in this field would be of great help in developing a standard protocol for automatic quantity surveying system in Vietnam.

Originality/value

A new theoretical framework for BIM-based QTO validated with Delphi technique to facilitate progress payments for high-rise building projects, considering all information management stages and the phases of information development in the project lifecycle. The framework identified four types of information required for this QTO, detailed considerations for strategies (Library Objects Development, BIM Objects Information Declaration, BIM-based QTO) for better managing the information for this BIM use. Two trade-offs of “Speed – LOD–Applicable Breadth” and “Quality – Productivity” have been proposed for facilitating the strategies and also for enhancing the total efficiency and effectiveness of the QTO process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 7 September 2023

Himal Suranga Jayasena, Niraj Thurairajah, B.A.K.S. Perera and Mohan Siriwardena

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of…

Abstract

Purpose

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of understanding that supports contextualized understanding of BIM adoption decisions in a BIM infant industry. The framework bridges the gap in current knowledge in terms of the absence of such a framework, which has hindered the structured understanding of the BIM decision of an adopter, curtailing the appropriate strategizing of their BIM adoption.

Design/methodology/approach

The study focuses on a BIM infant industry, where early adopters begin using BIM, allowing insights into this crucial initial stage of adoption. Identifying affordances as a versatile concept that could effectively represent not only what an adopter perceives and expects from BIM implementation, but also, what the adopter, in fact, can achieve from it, an affordance-led framework of understanding (AFU) was developed to comprehensively capture varying dynamics of BIM decision process. The study took a qualitative retroductive approach to theory with semi-structured interviews to gather necessary data from a sample of BIM adopters purposively selected to maximize the breadth and depth of data.

Findings

The study concludes by identifying and defining pertinent affordances as a new concept and a compulsory state for BIM adoption. Findings further demonstrate that existing theories can be linked to the AFU to strategically direct the affordances dynamics towards the pertinent state.

Originality/value

The AFU enables a deeper contextualizable view of innovation adoption that was absent in existing innovation studies. It significantly enhances the precision of strategizing BIM adoption compared to previous approaches, enabling adopters to plan and implement BIM in a manner that aligns well with their expectations and specific conditions.