Article
Publication date: 25 February 2022

Tito Ceci de Sena and Márcio Minto Fabricio

This study proposes a framework for collaborative building information modeling BIM implementation in construction and development companies in the Brazilian architecture…

Abstract

Purpose

This study proposes a framework for collaborative building information modeling BIM implementation in construction and development companies in the Brazilian architecture, engineering and construction (AEC) market. The study addresses aspects concerning BIM collaboration, levels of adoption and maturity, classification of BIM objects and use of tools.

Design/methodology/approach

The study conclusions are based on a bibliographic review and on active participation in a BIM implementation process conducted with two construction and development companies that participated in the study, which allowed examining the practical problems of the elaboration of BIM in various technical specialties, and the proposition of a framework to help overcome these limitations.

Findings

The research identified the importance of adopting standardized methods to develop models, establishing common classifications for objects to allow the use by different stakeholders on 3D, 4D and 5D processes, in a context that information is scattered and, in many cases, divergent across different companies and even different areas from the same company.

Originality/value

The study presents a practical set of methods and tools to be used within a context common to the Brazilian AEC market, on which construction and development companies are responsible for the management of the design and construction phase of a building. The recommendations of the research take into account the shortage of nationwide frameworks and classification standards, so it contributes to filling some gaps of current literature that cover theoretical aspects of guidance documents for BIM implementation but do not detail specific practical applications within a determined context. The limitations of the framework proposed are its focus on establishing context-specific guidelines, which may not be suitable universally.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 5
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 November 2022

Praveena Munianday, Rahimi A. Rahman and Muneera Esa

There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of…

Abstract

Purpose

There is a dearth of studies conducted by local academics on actual building information modelling (BIM) projects to analyse the actual hurdles of BIM adoption. The majority of BIM research focuses on the technology’s general advantages, disadvantages, issues and limitations. In addition, research on actual BIM projects that have integrated BIM throughout the project is necessary to increase the current low number of BIM users in Malaysia. Consequently, the purpose of this study is to examine the challenges BIM adopters experience while implementing BIM in their projects and how they overcome them.

Design/methodology/approach

An in-depth interview session was used to collect data based on a case-study methodology. In Malaysia, three BIM projects were chosen, given the available resources. To evaluate the data in this qualitative study, NVivo was used.

Findings

According to the findings, the most important elements influencing the adoption of new technology and innovation were people and capital. The most significant impediments to BIM adoption are the appraisal of time and finances, as well as the tolerance of changes in approach.

Originality/value

Collaborative training and BIM education have been the most explored solutions for reducing BIM difficulties. As a result, these concerns and solutions should be investigated and implemented to ensure project success and fully use technological innovation.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 11 August 2023

Charles Frommweiler and Erik Poirier

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the…

Abstract

Purpose

The building commissioning (BCx) phase is a critical stage in a building's lifecycle. It is also a complex process that involves a large number of actors and activities. While the use of building information modeling (BIM) in the commissioning phase of building equipment and systems could be beneficial, few studies have investigated the processes behind its implementation. The research presented in this paper aims to investigate the implementation of BIM for the commissioning phase within a general contracting company through action-research.

Design/methodology/approach

Through direct involvement with the research partner, a large general contractor, a diagnosis on the current limitations of the commissioning process was conducted. An action plan to implement BIM for commissioning was developed and implemented in two pilot projects. Evaluation was performed through on-site observations and informal discussions with field staff. Learning was specified through the development of a formal protocol for BIM-enabled BCx.

Findings

This action-research project helped the partner organization identify the challenges and a way forward to formalize its BIM-enabled BCx process. The action plan aimed at countering the lack of knowledge about the status of equipment and system commissioning as well as the lack of standardization. The research team co-developed and tested a formal protocol, including BIM-enabled processes and technologies to address these observed problems. A complete implementation ecosystem was structured and deployed. Preliminary feedback indicated that improvements were obtained using a BIM-enabled approach over a traditional approach.

Originality/value

While past studies have investigated the BCx process, this study identified current challenges considering recent advances in BIM and focused on a large general contractor. This work provides an in-depth account of a large general contractor attempting to streamline its BCx process. The results of the study could help guide practitioners in implementing more streamlined BIM-enabled BCx processes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Chukwuka Christian Ohueri, San Chuin Liew, Jibril Adewale Bamgbade and Wallace Imoudu Enegbuma

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to…

Abstract

Purpose

The efficient application of building information modeling (BIM) methodology in the sustainable building design process, known as green BIM, provides ideal leverage to significantly enhance multidiscipline team collaboration. However, the practical execution of green BIM is characterized by issues such as duplication of work, information silos and poor cross-party coordination. Besides, there are limited studies on the specific components that are critical to driving green BIM collaborative design. This study aims to establish the critical components of green BIM collaborative design to enable the multidiscipline team to effectively use diverse software to collaboratively exchange accurate information, thus ensuring informed decision-making in the sustainable building design process.

Design/methodology/approach

Data were obtained by using a questionnaire to survey 360 respondents comprising mainly architects and engineers (civil, mechanical and electrical) in Malaysia. Subsequently, data were analyzed via confirmatory factor analysis. Afterward, a measurement model was established and used to test the 11 hypotheses of this study.

Findings

A covariance-based structural equation model of the critical components for successful BIM-based sustainable building design collaboration was established.

Practical implications

The research findings will guide the multidisciplinary team to collaboratively exchange accurate information in green BIM practices.

Originality/value

To the best of the authors’ knowledge, this research is the first attempt in the literature to provide a pragmatic approach for practitioners to combine the established critical components of green BIM to collaboratively exchange heterogeneous sustainability criteria and efficiently design buildings with high sustainability performance, particularly in emerging countries like Malaysia.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 26 December 2023

Dat Tien Doan, Ali Ghaffarianhoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini and John Tookey

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to…

Abstract

Purpose

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to determine the key factors affecting the success of a BIM project.

Design/methodology/approach

Both primary and secondary data were employed in this research, including 21 semi-structured interviews and industry guidelines from the three most well-known global building excellence models (BEMs). The data were analysed through content analysis due to its recognised benefits as a transparent and reliable approach.

Findings

Leadership, clients and other stakeholders, strategic planning, people, resources, process and results were identified as seven main categories along with 39 indicators in the BIM adoption framework. Based on the interviewees' perspectives, leadership is considered the most significant category, impacting all of the remaining categories.

Practical implications

Using the developed framework will enhance comprehension of BIM, offering directives for those embracing BIM. This will aid construction stakeholders in being better equipped for BIM projects. Having a skilled BIM manager can lead to the success of construction projects.

Originality/value

This research contributed to the existing body of knowledge by providing the categories with specific factors that assist BIM practitioners in assessing their BIM performance for further BIM practice improvement.

Article
Publication date: 13 May 2022

Mustafa Onur Savaşkan and Ozan Önder Özener

This article presents a case study on the Heritage Building Information Modeling (H-BIM) application in a historic village in Bursa, Turkey. The study addresses how tailor-made…

Abstract

Purpose

This article presents a case study on the Heritage Building Information Modeling (H-BIM) application in a historic village in Bursa, Turkey. The study addresses how tailor-made and highly structured H-BIM approaches can effectively be implemented in preservation applications for historic vernacular buildings in the rural architecture context.

Design/methodology/approach

Using inexpensive digital photogrammetry techniques tightly combined with an object-oriented BIM ontology, parametric meta-modeling and object/system propagation methods, the study employed a holistic H-BIM approach for capturing the materiality, building object behaviors and indigenous construction principles of a characteristic vernacular house that were synthesized in a parametric H-BIM model. The followed stages, steps and connected methods were systematized and articulated in a prototypical H-BIM implementation framework.

Findings

The study findings suggested that the developed parametric H-BIM approach can return effective results with the combined use of low-cost and practical digital photogrammetry with BIM methods. The flexibility and adaptability of the parametric H-BIM implementation framework facilitated the synthesis of a comprehensive H-BIM model and allowed an in-depth evaluation of local architectural heritage with its physical, spatial and environmental characteristics. The proposed H-BIM approach also provided significant documentation and system-specific assessment benefits for preserving the vernacular examples which are prone to extinction especially due to structural and systemic deterioration.

Originality/value

The study proposes a feasible, practical and replicable H-BIM implementation methodology for vernacular preservation applications. The knowledge-embedded H-BIM approach, flows and techniques presented in this study provide a holistic and systematic H-BIM framework – with the integrated use of digital photogrammetry and parametric meta-modeling methods – that has the potential for the democratization of H-BIM applications in education and practice.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 January 2023

Syahrul Nizam Kamaruzzaman, Sarah Nabiha Suznan and Nik Elyna Myeda

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks…

Abstract

Purpose

This study aims to leverage the implementation of building information modelling (BIM) in facilities management (FM), and thus the integration of BIM and FM are explored. It looks at identifying the information needed to implement BIM application in FM, to determine the level of implementation of BIMFM as well as to recommend BIMFM application mapping for building life cycle.

Design/methodology/approach

This study applied qualitative methodology, upon which a purposive sampling to 16 interviewees were conducted among professionals involved in any BIM, FM, BIMFM projects. Final analysis was conducted using thematical analysis by ATLAS.ti software.

Findings

The types of information required to implement BIMFM range from managerial information, commercial information, technical information and all full life cycle data. The implementation of BIMFM is agreed as beneficial, as it builds up efficiency of building performance, able to close gap of loses information, helps to improve FM in terms of data management, mitigates the problems, identifies priority defects and to enhance the FM processes. Respondents also believed that the causes where there is no implementation of BIMFM is in the situations where things are in order and when it becomes very expensive.

Originality/value

This paper has managed to gather the essential elements toward leveraging the implementation of BIMFM in digital construction project which are in the means of information types, the needs of BIMFM implementation and towards the end drawing the BIMFM implementation plan framework that could be used as a reference for the practitioners and industry.

Details

Journal of Facilities Management , vol. 21 no. 4
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 30 May 2023

Sharifah Nur Aina Syed Alwee, Umi Kalsum Zolkafli and Hafez Salleh

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in…

Abstract

Purpose

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.

Design/methodology/approach

The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.

Findings

Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.

Practical implications

The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.

Originality/value

This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.

Details

Facilities , vol. 41 no. 11/12
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 1 March 2023

Rachel Madeira Magalhães, Luiz Carlos Brasil de Brito Mello and Maria Aparecida Steinherz Hippert

The main factor that leads organizations to implement Building Information Modeling (BIM) is customer demand. While this is a frequent topic in the BIM literature, few studies…

1579

Abstract

Purpose

The main factor that leads organizations to implement Building Information Modeling (BIM) is customer demand. While this is a frequent topic in the BIM literature, few studies address BIM organizational readiness. Due to this gap in BIM implementation literature, this paper aims to understand what affects organizational BIM readiness and how the BIM readiness process occurs.

Design/methodology/approach

The present paper adopts design science research as a methodological approach. A literature review examined 69 journal articles. The analysis focused on multiple theories, such as organizational readiness for change, adoption and diffusion of innovations and project management.

Findings

By investigating BIM organizational readiness, this study presents a construct and a conceptual model for driving BIM readiness.

Originality/value

This study can benefit researchers and organizations. The results presented may drive further research and discussions on the topic. But it is important to state that these results must be tested on real situations.

Details

Frontiers in Engineering and Built Environment, vol. 3 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Article
Publication date: 9 January 2024

Muneeb Afzal, Johnny Kwok Wai Wong and Alireza Ahmadian Fard Fini

Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they…

Abstract

Purpose

Request for information (RFI) documents play a pivotal role in seeking clarifications in construction projects. However, perceived as inevitable “non-value adding” tasks, they harbour risks like schedule delays and increased project costs, underlining the importance of strategic RFI management in construction projects. Despite this, a lack of literature dissecting RFI processes impedes a full understanding of their intricacies and impacts. This study aims to bridge the gap through a comprehensive literature review, delving into RFI intricacies and implications, while emphasising the necessity for strategic RFI management to prevent project risks.

Design/methodology/approach

This research study systematically reviews RFI-related papers published between 2000 and 2023. Accordingly, the review discusses key themes related to RFI management, yielding best practices for industry stakeholders and highlighting research directions and gaps in the body of knowledge.

Findings

Present RFI management platforms exhibit deficiencies and lack analytics essential for streamlined RFI processing. Complications arise in building information modelling (BIM)-enabled projects due to software disparities and interoperability hurdles. The existing body of knowledge heavily relies on manual content analysis, an impractical approach for the construction industry. The proposed research direction involves automated comprehension of unstructured RFI content using advanced text mining and natural language processing techniques, with the potential to greatly elevate the efficiency of RFI processing.

Originality/value

The study extends the RFI literature by providing novel insights into the problemetisation with the RFI process, offering a holistic understanding and best practices to minimise adverse effects. Additionally, the paper synthesises RFI processes in traditional and BIM-enabled project settings, maps a causal-loop diagram to identify associated issues and summarises approaches for extracting knowledge from the unstructured content of RFIs. The outcomes of this review stand to offer invaluable insights to both industry practitioners and researchers, enabling and promoting the refinement of RFI processes within the construction domain.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175