Search results

1 – 10 of 107
Article
Publication date: 24 November 2022

Rui Li, Zhanwen Niu, Chaochao Liu and Bei Wu

Given the complexity of building information modeling (BIM) adoption decisions in small- and medium-sized enterprises (SMEs) in the Architecture, Engineering and Construction…

Abstract

Purpose

Given the complexity of building information modeling (BIM) adoption decisions in small- and medium-sized enterprises (SMEs) in the Architecture, Engineering and Construction (AEC) industry, understanding BIM adoption decision-making through the net effect of a single factor on BIM adoption decisions alone is limited. Therefore, this paper analyzed the co-movement effect of managers' psychological factors on the BIM adoption decisions from the perspective of managers' perceptions. The purpose is to let managers have a deep understanding of their BIM adoption decisions, and put forward targeted suggestions for the AEC industry to promote the adoption of BIM by SMEs.

Design/methodology/approach

Data from 192 managers in SMEs collected by the questionnaire were used in a fuzzy set qualitative comparative analysis (fsQCA). Due to the limitations of fsQCA in making the best use of the data used, as a complement to fsQCA, necessary conditions analysis (NCA) was used to analyze the extent to which necessary conditions influenced the outcome.

Findings

(1) NCA analysis shows that high perceived resource availability (PRA) and high performance expectancy (PE) are necessary conditions for high BIM adoption intention (AI). (2) fsQCA analysis shows that high PE is the single core condition for high AI. fsQCA analysis identifies three configurations of managers' psychological factors, reflecting three types of managers' decision preferences, namely benefit preference, loss aversion and risk avoidance, respectively. Different decision preferences may lead to different BIM adoption strategies, such as full in-house use, partial in-house/outsourcing and full outsourcing of BIM processes. (3) High perceived risk (PR) and low perceived business value of BIM (PBV) are the core conditions for low AI.

Originality/value

This paper expands on the application of fsQCA to context of BIM adoption decisions. Based on the results of fsQCA analysis, this paper also establishes the relationship between managers' decision-making psychology and BIM adoption strategy choice and analyzes the impact of different decision biases on BIM adoption strategy choice. It concludes with suggestions for encouraging managers to adopt BIM and for avoiding decision-making bias.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 October 2022

Yunis Ali Ahmed, Hafiz Muhammad Faisal Shehzad, Muhammad Mahboob Khurshid, Omayma Husain Abbas Hassan, Samah Abdelsalam Abdalla and Nashat Alrefai

Building information modelling (BIM) has transformed the traditional practices of the Architecture, Engineering and Construction (AEC) industry. BIM creates a collaborative…

Abstract

Purpose

Building information modelling (BIM) has transformed the traditional practices of the Architecture, Engineering and Construction (AEC) industry. BIM creates a collaborative digital representation of built environment data. Competitive advantage can be achieved with collaborative project delivery and rich information modelling. Despite the abundant benefits, BIM’s adoption in the AEC is susceptible to confrontation. A substantial impediment to BIM adoption often cited is data interoperability. Other facets of interoperability got limited attention. Other academic areas, including information systems, discuss the interoperability construct ahead of data interoperability. These interoperability factors have yet to be surveyed in the AEC industry. This study aims to investigate the effect of interoperability factors on BIM adoption and develop a comprehensive BIM adoption model.

Design/methodology/approach

The theoretical foundations of the proposed model are based on the European interoperability framework (EIF) and technology, organization, environment framework (TOE). Quantitative data collection from construction firms is gathered. The model has been thoroughly examined and validated using partial least squares structural equation modelling in SmartPLS software.

Findings

The study’s findings indicate that relative advantage, top management support, government support, organizational readiness and regulation support are determinants of BIM adoption. Financial constraints, complexity, lack of technical interoperability, semantic interoperability, organizational interoperability and uncertainty are barriers to BIM adoption. However, compatibility, competitive pressure and legal interoperability do not affect BIM adoption.

Practical implications

Finally, this study provides recommendations containing the essential technological, organizational, environmental and interoperability factors that AEC stakeholders can address to enhance BIM adoption.

Originality/value

To the best of the authors’ knowledge, this paper is one of the first studies to combine TOE and EIF in a single research model. This research provides empirical evidence for using the proposed model as a guide to promoting BIM adoption. As a result, the highlighted determinants can assist organizations in developing and executing successful policies that support BIM adoption in the AEC industry.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 11 October 2022

Onaopepo Adeniyi, Niraj Thurairajah and Feyisetan Leo-Olagbaye

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction…

Abstract

Purpose

Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.

Design/methodology/approach

The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.

Findings

Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.

Research limitations/implications

This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.

Practical implications

The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.

Originality/value

The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 26 March 2024

Xichen Chen, Alice Yan Chang-Richards, Florence Yean Yng Ling, Tak Wing Yiu, Antony Pelosi and Nan Yang

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This…

Abstract

Purpose

Despite extensive academic research related to digital technologies (DT), their integration into architecture, engineering and construction (AEC) projects lags in practice. This paper aims to discover DT deployment patterns and emerging trends in real-life AEC projects.

Design/methodology/approach

A case study methodology was adopted, including individual case analyses and comparative multiple-case analyses.

Findings

The results revealed the temporal distribution of DT in practical AEC projects, specific DT products/software, major project types integrated with digital solutions, DT application areas and project stages and associated project performance. Three distinct patterns in DT adoption have been observed, reflecting the evolution of DT applications, the progression from single to multiple DT integration and alignment with emerging industry requirements. The DT adoption behavior in the studied cases has been examined using the technology-organization-environment-human (TOE + H) framework. Further, eight emerging trend streams for future DT adoption were identified, with “leveraging the diverse features of certain mature DT” being a shared recognition of all studied companies.

Practical implications

This research offers actionable insights for AEC companies, facilitating the development of customized DT implementation roadmaps aligned with organizational needs. Policymakers, industry associations and DT suppliers may leverage these findings for informed decision-making, collaborative educational initiatives and product/service customization.

Originality/value

This research provides empirical evidence of applicable products/software, application areas and project performance. The examination of the TOE + H framework offers a holistic understanding of the collective influences on DT adoption. The identification of emerging trends addresses the evolving demands of the AEC industry in the digital era.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 August 2022

Saba Mani, Navid Ahmadi Eftekhari, M. Reza Hosseini and Javad Bakhshi

This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.

Abstract

Purpose

This paper aims to explore the various sociotechnical dimensions of building information modelling (BIM)-induced changes associated with stakeholder management of projects.

Design/methodology/approach

This paper relies on grounded theory and data collection from two case studies – one in the public sector and one in the private sector – and is underpinned by Leavitt’s (1964) sociotechnical model.

Findings

Findings reveal four new dimensions of stakeholder management as being affected through BIM-induced changes: commitment; transparency; learning and experience; and stakeholder satisfaction, with these extending beyond the dimensions recognised in the existing literature. Another novelty lies in bringing to light the highly context-specific nature of BIM-induced changes pertinent to stakeholder management, with the two case studies demonstrating differences in these changes. Furthermore, a theoretical model of the causal impacts of various identified dimensions is presented, in which the sequence of changes and the causal associations between the identified dimensions are conceptualised.

Originality/value

Through Leavitt’s (1964) Diamond lens, the procedure of change and its evolutionary procedure for various components of the sociotechnical system of stakeholder management are theorised. The tentative conceptualisations presented offer a springboard from which to further investigate the episode of change pertinent to various dimensions of stakeholder management in BIM-enabled projects.

Details

Construction Innovation , vol. 24 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 15 April 2024

Carlos Alejandro Diaz Schery, Rodrigo Goyannes Gusmão Caiado, Soraida Aguilar Vargas and Yiselis Rodriguez Vignon

The purpose of this paper is twofold: first, to present a rigorous bibliometric analysis and a systematic literature review of the critical success factors (CSFs) for Building…

Abstract

Purpose

The purpose of this paper is twofold: first, to present a rigorous bibliometric analysis and a systematic literature review of the critical success factors (CSFs) for Building information modelling (BIM)-based digital transformation; second, to identify the relationship between the dimensions in favour of BIM implementation.

Design/methodology/approach

This study adopts a two-step approach to combine bibliometric and systematic literature review to explore the research topic of BIM and CSFs. Bibliometric tools such as Biblioshiny in R language and Ucinet software were applied to this study.

Findings

Besides identifying the two most influential authors (e.g. Bryde and Antwi-Afari), the key journal for disseminating articles, and the most influential countries in this discourse (e.g. Hong Kong and Australia), the study also identifies four pivotal research themes derived from the co-occurrence analysis of keywords: the fusion of sustainability and technology with BIM; practical application and its integration within construction management; innovation and engineering paradigms; and the advent of emerging technologies (e.g. Blockchain) within developing nations. Additionally, the paper introduces a comprehensive framework for selecting CSFs pertinent to BIM-centred digital transformation as viewed through the lens of dynamic capabilities.

Originality/value

This paper establishes a link between dynamic capabilities theory, CSFs, and BIM dimensions, presenting a multifaceted framework guiding future paths and offering practical insights for managerial and political decision-makers engaged in digital transformation endeavours. The study positions dynamic capabilities as pivotal, aligning digital technologies with continuous business performance, and advocates for a strategic focus on digital transformation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 14 June 2022

Samuel Adeniyi Adekunle, Clinton Ohis Aigbavboa and Obuks Augustine Ejohwomu

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of…

1588

Abstract

Purpose

The implementation of BIM in the construction industry requires the coevolution of the various aspects of the BIM ecosystem. The human dimension is a very important dimension of the ecosystem necessary for BIM implementation. It is imperative to study this aspect of the BIM ecosystem both from the employer perspective and employee availability to provide insights for stakeholders (job seekers, employers, students, researchers, policymakers, higher education institutions, career advisors and curriculum developers) interested in the labour market dynamics.

Design/methodology/approach

To understand the BIM actor roles through the employer lens and the actual BIM actors in the construction industry, this study employed data mining of job adverts from LinkedIn and Mncjobs website. Content analysis was employed to gain insights into the data collected. Also, through a quantitative approach, the existing BIM actor roles were identified.

Findings

The study identified the employers' expectations of BIM actors; however, it is noted that the BIM actor recruitment space is still a loose one as recruiters put out open advertisements to get a large pool of applicants. From the data analysed, it is concluded that the BIM actor role is not an entirely new profession. However, it simply exists as construction industry professionals with BIM tool skills. Also, the professional development route is not well defined yet.

Originality/value

This study presents a realistic angle to BIM actor roles hence enhancing BIM implementation from the human perspective. The findings present an insight into the preferred against the actual.

Details

Engineering, Construction and Architectural Management, vol. 31 no. 13
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 5 December 2023

Atul Kumar Singh and V.R. Prasath Kumar

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building…

Abstract

Purpose

Blockchain is a developing technology that affects numerous industries, including facility management (FM). Many barriers are associated with adopting blockchain-enabled building information modeling (BEBIM) in FM. This research aims to identify and prioritize the barriers to adopting BEBIM in FM.

Design/methodology/approach

To address the knowledge gap, this study employs a two-phase methodology for evaluating the barriers to adopting BEBIM in FM. The first phase involves a comprehensive literature review identifying 14 barriers to BEBIM adoption. Using a Delphi approach, the identified barriers were categorized into 6 groups and finalized by 11 experts, adding 3 more barriers to the list. The best-worst method (BWM) determines the priority weights of identified barriers and sub-barriers in the second phase.

Findings

This study reveals that adopting BEBIM for FM in India faces significant hurdles. The most critical barriers are “limited collaboration” and “communication among stakeholders,” “legal constraints in certain jurisdictions” and “challenges in establishing trust and governance models.” To mitigate these barriers, stakeholders should foster collaboration and communication, develop efficient blockchain technology (BT) and establish a trust and governance model.

Practical implications

This work underscores the importance of formulating effective strategies to overcome the identified barriers and emphasizes implications that can assist policymakers and industry stakeholders in achieving successful BEBIM adoption for improved FM practice.

Originality/value

The study provides valuable insights for policymakers, construction industry stakeholders and facility managers interested in leveraging this technology to improve the efficiency and effectiveness of FM practice in India.

Details

Built Environment Project and Asset Management, vol. 14 no. 2
Type: Research Article
ISSN: 2044-124X

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 107