Search results

1 – 10 of 393
Article
Publication date: 1 February 2024

Abdulkabir Opeyemi Bello and Calistus Ayegba

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to…

Abstract

Purpose

Despite successfully adopting building information modelling (BIM) for design and construction, its adoption in post-construction is critically lagging. This study aims to investigate the adoption of BIM for post-construction in Nigeria. Specifically, it aims to investigate the barriers hindering BIM adoption, propose strategies to facilitate its integration into the post-construction phase and examine the relationship between the barriers and strategies towards adopting BIM for post-construction.

Design/methodology/approach

This study employs a quantitative approach to gather numerical data on BIM perceived barriers among International Facility Management Association (IFMA) members. The study also develops strategies from an extensive literature review and combines them with insights from preliminary investigation. The data were analysed using descriptive and inferential statistics.

Findings

The top perceived barriers among the professionals are lack of BIM awareness, software availability issues and difficulties using new technologies. Institute training/workshops on BIM software for the professionals in the organisation, including BIM software courses in various related professional exams, and encouraging adoption of BIM from the grassroots, such as higher institutions, emerge as the top strategies. The findings further show a significant relationship between the barriers and strategies, emphasising the recognition that understanding barriers prompts the active development and implementation of strategies.

Originality/value

This study holds originality in its examination of the relationship between the barriers and strategies associated with BIM adoption in Nigerian Architecture, Construction, Engineering and Operation.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 7 September 2023

Himal Suranga Jayasena, Niraj Thurairajah, B.A.K.S. Perera and Mohan Siriwardena

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of…

Abstract

Purpose

Successful adoption of building information modelling (BIM) by early adopters is crucial for its effective diffusion. The purpose of this study is to develop a framework of understanding that supports contextualized understanding of BIM adoption decisions in a BIM infant industry. The framework bridges the gap in current knowledge in terms of the absence of such a framework, which has hindered the structured understanding of the BIM decision of an adopter, curtailing the appropriate strategizing of their BIM adoption.

Design/methodology/approach

The study focuses on a BIM infant industry, where early adopters begin using BIM, allowing insights into this crucial initial stage of adoption. Identifying affordances as a versatile concept that could effectively represent not only what an adopter perceives and expects from BIM implementation, but also, what the adopter, in fact, can achieve from it, an affordance-led framework of understanding (AFU) was developed to comprehensively capture varying dynamics of BIM decision process. The study took a qualitative retroductive approach to theory with semi-structured interviews to gather necessary data from a sample of BIM adopters purposively selected to maximize the breadth and depth of data.

Findings

The study concludes by identifying and defining pertinent affordances as a new concept and a compulsory state for BIM adoption. Findings further demonstrate that existing theories can be linked to the AFU to strategically direct the affordances dynamics towards the pertinent state.

Originality/value

The AFU enables a deeper contextualizable view of innovation adoption that was absent in existing innovation studies. It significantly enhances the precision of strategizing BIM adoption compared to previous approaches, enabling adopters to plan and implement BIM in a manner that aligns well with their expectations and specific conditions.

Details

Archnet-IJAR: International Journal of Architectural Research, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2631-6862

Keywords

Article
Publication date: 11 September 2023

Chee Fui Wong, See Hung Lau, Ooi Kuan Tan and Jeffrey Boon Hui Yap

This paper studies the critical factors from the perspectives of technological quality, personal compatibility and organisational commitment using the technological adoption…

Abstract

Purpose

This paper studies the critical factors from the perspectives of technological quality, personal compatibility and organisational commitment using the technological adoption framework (TAF). The proposed TAF studies the critical factors that influence the intention to use building information modelling (BIM) taking into consideration of the “Perceived Ease of Use (PEU)” and “Perceive Usefulness (PU).”

Design/methodology/approach

The proposed study is a quantitative research study using the TAF model and the statistical analysis using “Partial Least Squares-Structural Equation Modelling (PLS-SEM).” The questionnaires are developed based on the literature review study and disseminated to the stakeholders in the Malaysian construction industry, including consultants, contractors, and clients. The data collected are analysed using PLS-SEM to identify the correlation between the critical factors influencing BIM adoption and the moderation influence of the PEU and PU towards the “Intention to Use (IU)” BIM.

Findings

The data collected from 185 construction industry stakeholders in Malaysia was utilised to develop the structural equation model. The measurement model was analysed in terms of composite reliability, discriminant validity, and collinearity issues. Subsequently, the SEM is analysed, and the findings on the hypothesis on the correlation between the critical factors and the intention to use BIM are examined. The study also examines the mediation effects of the PEU and PU towards the BIM adoption in the Malaysian construction industry.

Originality/value

This research conceptual framework, TAF, is derived from the integration of the existing underpinning theories of the technological adoption model and the technology–organisation–environment framework. This new TAF can be used for the study of new technology adoption. This cross-sectional research study is in line with the “Construction 4.0 Strategic Plan” in Malaysia to establish the current BIM adoption scenario and formulate the framework to promote incentives to promote BIM adoption.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 March 2023

Oluseye Olugboyega

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of…

Abstract

Purpose

Some BIM implementation strategies are critical, while others are insignificant and ineffective in terms of lowering BIM adoption obstacles and promoting widespread acceptance of BIM in projects. The BIM literature has not provided evidence to support this claim or identify the fundamental BIM implementation strategies. This study filled this gap by identifying and investigating the effect of fundamental BIM implementation methodologies on the occurrence of proportional impacts between stages.

Design/methodology/approach

The findings indicate a positive and crucial relationship between the stages of the BIM implementation strategies and the reduction of barriers (r = 1.79, z = 2.15), preliminary and sustained BIM adoption barriers (r = 1.53, z = 60.83), BIM adoption on projects and BIM-enabled integration and collaboration (r = 0.7, z = 2.74). This validates the model's hypotheses and demonstrates that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering the obstacles alone will not secure BIM adoption.

Findings

The validation of the model's hypotheses demonstrated that the fundamental BIM implementation strategies will accelerate the reduction of BIM adoption hurdles. The impact, however, will be the same for both sustained and preliminary barriers. This implies that lowering BIM adoption obstacles alone will not secure BIM adoption. This study proposes that BIM deployment tactics be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance.

Research limitations/implications

In line with the findings of this study, BIM adoption must be consistent and long-term before the benefits in project execution become evident and substantiated. The BIM abilities of project participants, the feasibility of BIM conventions and the proficiency of BIM supervisors may all play a role in this.

Practical implications

This research implies a few approaches and tactics for implementing BIM in an efficient and beneficial manner. The study's findings imply that BIM deployment tactics should be carefully chosen in order to remove preliminary impediments, reduce barriers and energise BIM acceptance. It also explains how to structure BIM implementation strategies in developing countries. Another significant practical implication is the model's conclusion on the benefits of BIM adoption.

Originality/value

This study emphasises the significance of understanding the interrelatedness between the stages of the BIM implementation process in order to promote unavoidable and high-quality BIM adoption, as well as identifying the essential strategies that will guide policymakers and industry players in improving and pursuing successful BIM implementation. This study adds to BIM implementation theories by providing new information on the models, stages and interconnections of the BIM implementation process. However, the study could not identify the factors that impede BIM adoption despite the reduction in barriers and use of fundamental BIM implementation strategies.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 27 February 2024

Yu Yang, Shiting Shao and Dongping Cao

Despite the critical role of the policy environment in facilitating the advancement of building information modeling (BIM) as a systemic innovation to reshape traditional facility…

Abstract

Purpose

Despite the critical role of the policy environment in facilitating the advancement of building information modeling (BIM) as a systemic innovation to reshape traditional facility design, construction and operation processes, scant scholarly attention has been paid to systematically investigating how and why complex BIM policies are concretely and gradually implemented in different regional contexts from a dynamic policy diffusion perspective. This study aims to empirically investigate how different types of BIM policy instruments are dynamically implemented in heterogeneous regions over time and how the diffusion of BIM policies across different regions is comprehensively impacted by both internal efficiency needs and external legitimacy pressures.

Design/methodology/approach

This study employed a positivist research paradigm in which BIM policy data from 182 prefecture-level and above cities in China during 2011–2022 were analyzed with quantitative approaches for theory verification. Based on the content analysis of the evolutionary characteristics of the adopted BIM policy instruments in heterogeneous regions over time, the event history analysis (EHA) method was then used to further examine the mechanisms underlying the diffusion of BIM policies across different regions.

Findings

The content analysis results show that while environmental instruments (such as technological integration and goal planning) are the primary policy instruments currently adopted in China, recent years have also witnessed increasing adoptions of supply-side instruments (such as fiscal support and information support) and demand-side instruments (such as demonstration projects and tax incentives). After controlling for the impacts of regional fiscal and technical resources, the EHA results illustrate that BIM policy adoption positively relates to regional construction industry scale but negatively relates to regional industry productivity and that compared with public pressures from industry participants, vertical pressures from the central government and horizontal pressures from neighboring regions are more substantial drivers for policy adoption.

Originality/value

As an exploratory effort of using a dynamic policy diffusion perspective to systematically investigate how BIM policies are adopted in heterogeneous regional contexts to facilitate BIM advancement, this study not only characterizes the complexity and dynamics of BIM policies but also provides deepened understandings of the mechanisms underlying policy adoption in the conservative construction industry. The findings hold implications for how multifarious policy instruments can be more effectively and dynamically adopted to facilitate the advancement of BIM and related technologies as innovative solutions in the construction domain.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 26 December 2023

Dat Tien Doan, Ali Ghaffarianhoseini, Nicola Naismith, Amirhosein Ghaffarianhoseini and John Tookey

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to…

Abstract

Purpose

In New Zealand, building information modelling (BIM) prevalence is still in its early stages and faces many challenges. This research aims to develop a BIM adoption framework to determine the key factors affecting the success of a BIM project.

Design/methodology/approach

Both primary and secondary data were employed in this research, including 21 semi-structured interviews and industry guidelines from the three most well-known global building excellence models (BEMs). The data were analysed through content analysis due to its recognised benefits as a transparent and reliable approach.

Findings

Leadership, clients and other stakeholders, strategic planning, people, resources, process and results were identified as seven main categories along with 39 indicators in the BIM adoption framework. Based on the interviewees' perspectives, leadership is considered the most significant category, impacting all of the remaining categories.

Practical implications

Using the developed framework will enhance comprehension of BIM, offering directives for those embracing BIM. This will aid construction stakeholders in being better equipped for BIM projects. Having a skilled BIM manager can lead to the success of construction projects.

Originality/value

This research contributed to the existing body of knowledge by providing the categories with specific factors that assist BIM practitioners in assessing their BIM performance for further BIM practice improvement.

Article
Publication date: 17 February 2023

Michael Nii Addy, Titus Ebenezer Ebenezer Kwofie, Divine Mawutor Agbonani and Adikie E. Essegbey

Building information modelling (BIM) and augmented reality (AR) are unique technologies in the digitalized construction industry. In spite of the numerous benefits of BIM-AR, its…

Abstract

Purpose

Building information modelling (BIM) and augmented reality (AR) are unique technologies in the digitalized construction industry. In spite of the numerous benefits of BIM-AR, its adoption has been at a relatively slow pace. The purpose of this study is to investigate how the factors within technology–organization–environment (TOE) framework influence the adoption of BIM-AR in the context of construction companies in a developing country.

Design/methodology/approach

By using a mainly deductive quantitative design, survey data were collected from senior management of built environment companies in Ghana using questionnaires. The study adopted a mixture of both purposive and snowball sampling approaches. Partial least squares structural equation modelling was used to analyse how the factors within the TOE framework explain BIM-AR adoption in Ghana.

Findings

Findings from the study show that the top three factors within the TOE framework that facilitate the adoption of BIM-AR include ICT infrastructure within construction firms; the size of the construction firm, which may influence the financial capacity to accommodate BIM-AR; and competitive pressure. The inhibitors of BIM-AR at the company level included external support and trading partners’ readiness.

Research limitations/implications

Implicit is that the significant factors will be useful to policymakers and companies in developing programs that appeal to non-adopters to aid in mitigating their challenges and further enhance BIM-AR adoption.

Originality/value

The value of this paper has been the use of the theoretical framework TOE to explain the adoption factors of BIM-AR in the Ghanaian construction industry. The originality of the paper is further anchored in consideration of BIM-AR, which is quite nascent in emerging countries.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 30 August 2023

Nazanin Hatami and Ali Rashidi

Architecture, engineering and construction (AEC) is an important industry worldwide and one of the largest economic sectors in several developing countries, particularly in Iran…

Abstract

Purpose

Architecture, engineering and construction (AEC) is an important industry worldwide and one of the largest economic sectors in several developing countries, particularly in Iran. The Iranian AEC sector suffers from low productivity and needs to adopt building information modeling (BIM) to reduce inefficiencies. Therefore, this paper was conducted to identify the BIM barriers and propose practical solutions to overcome them in Iran.

Design/methodology/approach

A comprehensive literature review, two rounds of the Delphi technique and semi-structured interviews with 12 Iranian experts in the AEC sector were conducted. The data were analyzed using the mean score, standard deviation and nonparametric tests.

Findings

The present study identified 26 BIM barriers in the Iranian AEC community and provided practical strategies for improving BIM adoption. The identified barriers were categorized into six main groups including source barriers, financial barriers, unawareness barriers, organizational barriers, regulatory barriers and market-demand barriers. The main three BIM barriers in Iran were the lack of government intervention, change-resistant and the gap between industry and academia. Kruskal–Wallis tests revealed that there are no statistically significant differences in perceptions of BIM barriers between respondents. The Mann–Whitney test indicated that there is no statistically significant difference in perceptions between engineers and architects except for one.

Originality/value

There are few studies on BIM adoption across developing countries, particularly in Iran. Moreover, the results can also be used in other developing nations with similar conditions.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 September 2023

Xiaoying Li, Xiujuan Jin, Heng Li, Lulu Gong and Deyang Zhou

Considering the substantial benefits derived from the use of Building Information Modeling (BIM) in construction projects, governments and its related sectors have introduced…

Abstract

Purpose

Considering the substantial benefits derived from the use of Building Information Modeling (BIM) in construction projects, governments and its related sectors have introduced mandatory policies requiring the use of BIM. However, little is known about the impact of mandatory policies on BIM-based project performance. Therefore, the purpose of this paper is to provide a systematical understanding on the impact of policy interventions on the implementation practice of innovative technologies.

Design/methodology/approach

This paper utilizes the propensity score matching and difference in differences (PSM-DID) method to investigate the impact of policy interventions on BIM-based project performance. Using the panel data collected from 2015 to 2021 in the Hong Kong construction industry, this paper explores the impact of the first mandatory BIM policy on the BIM-based project performance of three key stakeholders.

Findings

The subjective BIM performance and BIM return on investment (ROI) have significantly improved after implementing the mandatory BIM policy. The promotion effect of mandatory BIM policy on BIM-based project performance gradually increases over time. Moreover, the promotion effect of mandatory BIM policy on BIM performance shows significant heterogeneity for different stakeholders and organizations of different sizes.

Originality/value

This study examined the impact of policy interventions on BIM-based project performance. The research findings can provide a holistic understanding of the potential implications of innovative mandatory policy in performance improvement and offer some constructive suggestions to policymakers and industry practitioners to promote the penetration of BIM in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 December 2022

Dubem Isaac Ikediashi, Otoabasi Asuquo Ansa, Anthony Okwogume Ujene and Sani Reuben Akoh

Building information modelling (BIM) has been established in the literature as a successful platform that creates an intelligent virtual model for processing data from conceptual…

Abstract

Purpose

Building information modelling (BIM) has been established in the literature as a successful platform that creates an intelligent virtual model for processing data from conceptual design through construction to operational stage of a facility. However, its adoption for facilities management (FM) provision in Nigeria has been slow due to inherent barriers. The aim of this paper is to (1) assess and categorise using factor analysis BIM for FM barriers and (2) model the barriers using stakeholders' personal/professional attributes.

Design/methodology/approach

Anchored on quantitative research design, 205 copies of structured questionnaire were distributed to key stakeholders and facilities managers in Nigeria's three strategic cities while 135 valid responses were received giving a response rate of 65.8%. Data collected were analysed using descriptive statistics while multiple regression analysis was used to model the barriers. Kruskal Wallis test was used to test the only hypothesis postulated for the study.

Findings

The study established lack of awareness of BIM for FM, poor supporting infrastructure for Internet services, and lack of education and training as the top three rated barriers militating against adoption of BIM for FM in Nigeria while corruption, widespread mistakes and errors and cultural issues were established as the three least rated barriers. Besides, findings also established eight underlying factors that explained 23 barrier factors used for the study which were subsequently used to develop eight regression models. In effect, gender, professional affiliation, organisation, experience, education, expertise, BIM for FM project type, and location were found to statistically predict the 8 extracted factors driving perceived barriers of BIM for FM adoption in Nigeria.

Practical implications

The study has provided a framework of barrier factors to help stakeholders identify specific barriers for which appropriate measures can be taken to ameliorate consequences of the perceived barriers. Meanwhile, an improved and rejuvenated advocacy on inherent benefits of BIM for facilities management by frontline stakeholders could potentially steer up interests and increased participation of stakeholders on BIM for FM.

Originality/value

The unique study developed the first ever regression model that links BIM for FM barriers to professional attributes of facilities management stakeholders in Nigeria.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

1 – 10 of 393