1 – 10 of 158Elisa Verna, Gianfranco Genta and Maurizio Galetto
The purpose of this paper is to investigate and quantify the impact of product complexity, including architectural complexity, on operator learning, productivity and quality…
Abstract
Purpose
The purpose of this paper is to investigate and quantify the impact of product complexity, including architectural complexity, on operator learning, productivity and quality performance in both assembly and disassembly operations. This topic has not been extensively investigated in previous research.
Design/methodology/approach
An extensive experimental campaign involving 84 operators was conducted to repeatedly assemble and disassemble six different products of varying complexity to construct productivity and quality learning curves. Data from the experiment were analysed using statistical methods.
Findings
The human learning factor of productivity increases superlinearly with the increasing architectural complexity of products, i.e. from centralised to distributed architectures, both in assembly and disassembly, regardless of the level of overall product complexity. On the other hand, the human learning factor of quality performance decreases superlinearly as the architectural complexity of products increases. The intrinsic characteristics of product architecture are the reasons for this difference in learning factor.
Practical implications
The results of the study suggest that considering product complexity, particularly architectural complexity, in the design and planning of manufacturing processes can optimise operator learning, productivity and quality performance, and inform decisions about improving manufacturing operations.
Originality/value
While previous research has focussed on the effects of complexity on process time and defect generation, this study is amongst the first to investigate and quantify the effects of product complexity, including architectural complexity, on operator learning using an extensive experimental campaign.
Details
Keywords
The purpose of this research is to systematically review the properties of supply chains demonstrating that they are complex systems, and that the management of supply chains is…
Abstract
Purpose
The purpose of this research is to systematically review the properties of supply chains demonstrating that they are complex systems, and that the management of supply chains is best achieved by steering rather than controlling these systems toward desired outcomes.
Design/methodology/approach
The research study was designed as both exploratory and explanatory. Data were collected from secondary sources using a comprehensive literature review process. In parallel with data collection, data were analyzed and synthesized.
Findings
The main finding is the introduction of an inductive framework for steering supply chains from a complex systems perspective by explaining why supply chains have properties of complex systems and how to deal with their complexity while steering them toward desired outcomes. Complexity properties are summarized in four inter-dependent categories: Structural, Dynamic, Behavioral and Decision making, which together enable the assessment of supply chains as complex systems. Furthermore, five mechanisms emerged for dealing with the complexity of supply chains: classification, modeling, measurement, relational analysis and handling.
Originality/value
Recognizing that supply chains are complex systems allows for a better grasp of the effect of positive feedback on change and transformation, and also interactions leading to dynamic equilibria, nonlinearity and the role of inter-organizational learning, as well as emerging capabilities, and existing trade-offs and paradoxical tensions in decision-making. It recognizes changing dynamics and the co-evolution of supply chain phenomena in different scales and contexts.
Details
Keywords
Patrik Jonsson, Johan Öhlin, Hafez Shurrab, Johan Bystedt, Azam Sheikh Muhammad and Vilhelm Verendel
This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?
Abstract
Purpose
This study aims to explore and empirically test variables influencing material delivery schedule inaccuracies?
Design/methodology/approach
A mixed-method case approach is applied. Explanatory variables are identified from the literature and explored in a qualitative analysis at an automotive original equipment manufacturer. Using logistic regression and random forest classification models, quantitative data (historical schedule transactions and internal data) enables the testing of the predictive difference of variables under various planning horizons and inaccuracy levels.
Findings
The effects on delivery schedule inaccuracies are contingent on a decoupling point, and a variable may have a combined amplifying (complexity generating) and stabilizing (complexity absorbing) moderating effect. Product complexity variables are significant regardless of the time horizon, and the item’s order life cycle is a significant variable with predictive differences that vary. Decoupling management is identified as a mechanism for generating complexity absorption capabilities contributing to delivery schedule accuracy.
Practical implications
The findings provide guidelines for exploring and finding patterns in specific variables to improve material delivery schedule inaccuracies and input into predictive forecasting models.
Originality/value
The findings contribute to explaining material delivery schedule variations, identifying potential root causes and moderators, empirically testing and validating effects and conceptualizing features that cause and moderate inaccuracies in relation to decoupling management and complexity theory literature?
Details
Keywords
John A. Kearby, Ryan D. Winz, Thom J. Hodgson, Michael G. Kay, Russell E. King and Brandon M. McConnell
The purpose of this paper is to investigate US noncombatant evacuation operations (NEO) in South Korea and devise planning and management procedures that improve the efficiency of…
Abstract
Purpose
The purpose of this paper is to investigate US noncombatant evacuation operations (NEO) in South Korea and devise planning and management procedures that improve the efficiency of those missions.
Design/methodology/approach
It formulates a time-staged network model of the South Korean noncombatant evacuation system as a mixed integer linear program to determine an optimal flow configuration that minimizes the time required to complete an evacuation. This solution considers the capacity and resource constraints of multiple transportation modes and effectively allocates the limited assets across a time-staged network to create a feasible evacuation plan. That solution is post-processed and a vehicle routing procedure then produces a high resolution schedule for each individual asset throughout the entire duration of the NEO.
Findings
This work makes a clear improvement in the decision-making and resource allocation methodology currently used in a NEO on the Korea peninsula. It immediately provides previously unidentifiable information regarding the scope and requirements of a particular evacuation scenario and then produces an executable schedule for assets to facilitate mission accomplishment.
Originality/value
The significance of this work is not relegated only to evacuation operations on the Korean peninsula; there are numerous other NEO and natural disaster related scenarios that can benefit from this approach.
Details
Keywords
Josana Gabriele Bolzan Wesz, Carlos Torres Formoso and Patricia Tzortzopoulos
The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order…
Abstract
Purpose
The purpose of this paper is to propose a model for planning and controlling the design process in companies that design, manufacture and assemble prefabricated engineer-to-order (ETO) building systems. This model was devised as an adaptation of the Last Planner® System for ETO multiple-project environments.
Design/methodology/approach
Design science research, also known as prescriptive research, was the methodological approach adopted in this research. An empirical study was carried out at the design department of a leading steel fabricator from Brazil, in which the proposed model was implemented in six different design teams.
Findings
The main benefits of the proposed model were shielding design work from variability, encouraging collaborative planning, creating opportunities for learning, increasing process transparency, and flexibility according to project status. Two main factors affected the effectiveness of the implementation process commitment and leadership of design managers, and training on design management and project planning and control core concepts and practices.
Research limitations/implications
Some limitations were identified in the implementation process: similarly to some previous studies (Ballard, 2002; Codinhoto and Formoso, 2005), the success of constraint analysis was still limited; some of the metrics produced (e.g. ABI, causes of planning failures) have not been fully used for process improvement; and systematic feedback about project status was not properly implemented and tested.
Originality/value
The main contributions of this study in relation to traditional design planning and control practices are related to the use of two levels of look-ahead planning, the introduction of a decoupling point between conceptual and detail design, the proposition of new metrics for the Last Planner® System, and understanding the potential role of visual management to support planning and control.
Details
Keywords
Petter Haglund and Martin Rudberg
Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics…
Abstract
Purpose
Contingency studies within logistics and supply chain management have shown a need for longitudinal studies on fit. The purpose of this paper is to investigate the logistics strategy from a process of establishing fit perspective.
Design/methodology/approach
A large Swedish building contractor's logistics strategy process was analysed using a longitudinal single-case study for a period of 11 years (2008–2019).
Findings
The case study reveals three main constraints to logistics strategy implementation: a dominant purchasing organisation, a lack of incentives and diverging top-management priorities. This suggests that logistics strategy fit is not a conscious choice determined by contextual factors.
Research limitations/implications
Establishing fit is a continuous cycle of regaining fit between the logistics context and logistics strategy components. Fit can be achieved by a change to the logistics context or to logistics strategy components.
Practical implications
Logistics managers may need to opt for satisfactory fit in view of the costs incurred by changing strategy versus the benefits to be gained from a higher degree of fit.
Originality/value
This paper adopts a longitudinal case design to study the fit between the logistics context and strategy, adding to the body of knowledge on organisational design and strategy in logistics and supply chain management.
Details
Keywords
Peter Burggraef, Johannes Wagner, Matthias Dannapfel and Sebastian Patrick Vierschilling
The purpose of this paper is to investigate the benefit of pre-emptive disruption management measures for assembly systems towards the target dimension adherence to delivery times.
Abstract
Purpose
The purpose of this paper is to investigate the benefit of pre-emptive disruption management measures for assembly systems towards the target dimension adherence to delivery times.
Design/methodology/approach
The research was conducted by creating simulation models for typical assembly systems and measuring its varying throughput times due to changes in their disruption profiles. Due to the variability of assembly systems, key influence factors were investigated and used as a foundation for the simulation setup. Additionally, a disruption profile for each simulated process was developed, using the established disruption categories material, information and capacity. The categories are described by statistical distributions, defining the interval between the disruptions and the disruption duration. By a statistical experiment plan, the effect of a reduced disruption potential onto the throughput time was investigated.
Findings
Pre-emptive disruption management is beneficial, but its benefit depends on the operated assembly system and its organisation form, such as line or group assembly. Measures have on average a higher beneficial impact on group assemblies than on line assemblies. Furthermore, it was proven that the benefit, in form of better adherence to delivery times, per reduced disruption potential has a declining character and approximates a distinct maximum.
Originality/value
Characterising the benefit of pre-emptive disruption management measures enables managers to use this concept in their daily production to minimise overall costs. Despite the hardly predictable influence of pre-emptive disruption measures, these research results can be implemented into a heuristic for efficiently choosing these measures.
Details
Keywords
Erik Flores-Garcia, Jessica Bruch, Magnus Wiktorsson and Mats Jackson
The purpose of this paper is to explore the selection of decision-making approaches at manufacturing companies when implementing process innovations.
Abstract
Purpose
The purpose of this paper is to explore the selection of decision-making approaches at manufacturing companies when implementing process innovations.
Design/methodology/approach
This study reviews the current understanding of decision structuredness for determining a decision-making approach and conducts a case study based on an interactive research approach at a global manufacturer.
Findings
The findings show the correspondence of intuitive, normative and combined intuitive and normative decision-making approaches in relation to varying degrees of equivocality and analyzability. Accordingly, the conditions for determining a decision-making choice when implementing process innovations are revealed.
Research limitations/implications
This study contributes to increased understanding of the combined use of intuitive and normative decision making in production system design.
Practical implications
Empirical data are drawn from two projects in the heavy-vehicle industry. The study describes decisions, from start to finish, and the corresponding decision-making approaches when implementing process innovations. These findings are of value to staff responsible for the design of production systems.
Originality/value
Unlike prior conceptual studies, this study considers normative, intuitive and combined intuitive and normative decision making. In addition, this study extends the current understanding of decision structuredness and discloses the correspondence of decision-making approaches to varying degrees of equivocality and analyzability.
Details
Keywords
Denise Ann Brady, Patricia Tzortzopoulos, John Rooke, Carlos Torres Formoso and Algan Tezel
The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a…
Abstract
Purpose
The purpose of this paper is to discuss a production planning and control model known as the Lean construction management (LCM) model, which applies a number of visual tools in a systematic way to the planning and control process. The application of the visual tools in this way facilitates the flow of information, thus improving transparency between the interfaces of planning, execution and control.
Design/methodology/approach
Design Science research is adopted for this investigation, which analyses the original development of the model and reports on its testing and refinement over different types of projects. The research is divided into three parts, each part focussing on a different stage of development and construction project type.
Findings
The main findings are related to the benefits of visual management in the construction planning and control process, such as maintaining consistency between different planning levels, so that feasible execution plans are created; control becomes more focussed on prevention rather than correction, and creates opportunities for collaborative problem solving. Moreover, the physical display of the visual tools in a discrete planning area on-site encourages a regular exchange between participants on actual work progress as it unfolds, leading to more timely reaction to the problems at hand.
Originality/value
The problem of a lack of transparency in construction planning and control leads to communication issues on-site, poor process orientation and high levels of waste. LCM improves process transparency by making information related to system-wide processes more readily available to project participants. This enables them to foresee problems in a timely manner and to take necessary measures to resolve them or to adapt the process to current circumstances. The LCM model proposes a new way of applying visual tools and controls systematically to improve transparency in construction planning and control.
Details
Keywords
Djordje Popovic and Carin Rösiö
The purpose of the study was to investigate the alignment between current product and manufacturing systems and how it could be achieved.
Abstract
Purpose
The purpose of the study was to investigate the alignment between current product and manufacturing systems and how it could be achieved.
Design/Methodology/Approach
Case study research method was chosen for the collection and analysis of empirical data. The data was of qualitative nature and was collected using research techniques such as observations through video recordings of processes, documents and open and semi-structured interviews.
Findings
The variation of outer side sub-element of the exterior wall element was found to not be aligned with its corresponding assembly. A hybrid assembly of outer side sub-elements characterised by flexibility and reconfigurability can be developed.
Research Limitations/Implications
The study is limited to the exterior wall element and corresponding manufacturing system.
Practical Implications
The presented approach was formulated with the aim to be used both for the analysis of existing products and manufacturing systems as well as for the design of new manufacturing systems.
Originality/Value
So far, this is the first study in the context of timber house building where the alignment between product and manufacturing systems was investigated by considering product variety and flexibility of manufacturing systems.
Details