Search results

1 – 10 of over 1000
Article
Publication date: 1 September 2023

Diego Augusto de Jesus Pacheco and Thomas Schougaard

This study aims to investigate how to identify and address production levelling problems in assembly lines utilising an intensive manual workforce when higher productivity levels…

Abstract

Purpose

This study aims to investigate how to identify and address production levelling problems in assembly lines utilising an intensive manual workforce when higher productivity levels are urgently requested to meet market demands.

Design/methodology/approach

A mixed-methods approach was used in the research design, integrating case study analysis, interviews and qualitative/quantitative data collection and analysis. The methodology implemented also introduces to the literature on operational performance a novel combination of data analysis methods by introducing the use of the Natural Language Understanding (NLU) methods.

Findings

First, the findings unveil the impacts on operational performance that transportation, limited documentation and waiting times play in assembly lines composed of an intensive workforce. Second, the paper unveils the understanding of the role that a limited understanding of how the assembly line functions play in productivity. Finally, the authors provide actionable insights into the levelling problems in manual assembly lines.

Practical implications

This research supports industries operating assembly lines with intensive utilisation of manual workforce to improve operational performance. The paper also proposed a novel conceptual model prescriptively guiding quick and long-term improvements in intensive manual workforce assembly lines. The article assists industrial decision-makers with subsequent turnaround strategies to ensure higher efficiency levels requested by the market.

Originality/value

The paper offers actionable findings relevant to other manual assembly lines utilising an intensive workforce looking to improve operational performance. Some of the methods and strategies examined in this study to improve productivity require minimal capital investments. Lastly, the study contributes to the empirical literature by identifying production levelling problems in a real context.

Details

International Journal of Productivity and Performance Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1741-0401

Keywords

Article
Publication date: 21 April 2022

Narpat Ram Sangwa and Kuldip Singh Sangwan

This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization.

Abstract

Purpose

This paper proposes an integrated value stream mapping (VSM) for a complex assembly line to improve the leanness of a complex automotive component manufacturing organization.

Design/methodology/approach

This study depicts the application of VSM at the case organization, where top management is concerned about the challenges of higher cycle time and lower productivity. Gemba walks were conducted to establish the concept of “walk the flow, create the flow” along the assembly line. The multi-hierarchical cross-functional team developed the current value stream map to know the “as-is” state. Then, the team analysed the current VSM and proposed the future VSM for the “to-be” state.

Findings

The integrated VSM shows different processes and work cells, various wastes, non-value-added activities, cycle time, uptime and the material and information flows for both products of the assembly line on the same map. The integrated VSM reduced cycle time, non-value-added activities, work in process inventory and improved line efficiency and production per labour hour for both the products, simultaneously.

Research limitations/implications

The limitation of the study is that the study focussed only on the application of VSM for one complex assembly only. Future research may be conducted using the developed integrated VSM approach in other complex production environments.

Practical implications

Managers can identify and reduce system waste by incorporating the concept of integrated VSM in a complex production or assembly environment where two or more products are being manufactured/assembled with low similarity.

Originality/value

The application of VSM for assembly lines is highly challenging because of merging flows, a large number of child parts in the lines and assembly of more than one product on the same line.

Details

The TQM Journal, vol. 35 no. 4
Type: Research Article
ISSN: 1754-2731

Keywords

Article
Publication date: 4 July 2023

Binghai Zhou and Mingda Wen

In a kitting supply system, the occurrence of material-handling errors is unavoidable and will cause serious production losses to an assembly line. To minimize production losses…

Abstract

Purpose

In a kitting supply system, the occurrence of material-handling errors is unavoidable and will cause serious production losses to an assembly line. To minimize production losses, this paper aims to present a dynamic scheduling problem of automotive assembly line considering material-handling mistakes by integrating abnormal disturbance into the material distribution problem of mixed-model assembly lines (MMALs).

Design/methodology/approach

A multi-phase dynamic scheduling (MPDS) algorithm is proposed based on the characteristics and properties of the dynamic scheduling problem. In the first phase, the static material distribution scheduling problem is decomposed into three optimization sub-problems, and the dynamic programming algorithm is used to jointly optimize the sub-problems to obtain the optimal initial scheduling plan. In the second phase, a two-stage rescheduling algorithm incorporating removing rules and adding rules was designed according to the status update mechanism of material demand and multi-load AGVs.

Findings

Through comparative experiments with the periodic distribution strategy (PD) and the direct insertion method (DI), the superiority of the proposed dynamic scheduling strategy and algorithm is verified.

Originality/value

To the best of the authors’ knowledge, this study is the first to consider the impact of material-handling errors on the material distribution scheduling problem when using a kitting strategy. By designing an MPDS algorithm, this paper aims to maximize the absorption of the disturbance caused by material-handling errors and reduce the production losses of the assembly line as well as the total cost of the material transportation.

Details

Engineering Computations, vol. 40 no. 5
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 25 December 2023

Zihan Dang and Naiming Xie

Assembly line is a common production form and has been effectively used in many industries, but the imprecise processing time of each process makes production line balancing and…

Abstract

Purpose

Assembly line is a common production form and has been effectively used in many industries, but the imprecise processing time of each process makes production line balancing and capacity forecasting the most troublesome problems for production managers. In this paper, uncertain man-hours are represented as interval grey numbers, and the optimization problem of production line balance in the case of interval grey man-hours is studied to better evaluate the production line capacity.

Design/methodology/approach

First, this paper constructs the basic model of assembly line balance optimization for the single-product scenario, and on this basis constructs an assembly line balance optimization model under the multi-product scenario with the objective function of maximizing the weighted greyscale production line balance rate, second, this paper designs a simulated annealing algorithm to solve problem. A neighborhood search strategy is proposed, based on assembly line balance optimization, an assembly line capacity evaluation method with interval grey man-hour characteristics is designed.

Findings

This paper provides a production line balance optimization scheme with uncertain processing time for multi-product scenarios and designs a capacity evaluation method to provide managers with scientific management strategies so that decision-makers can scientifically solve the problems that the company's design production line is quite different from the actual production situation.

Originality/value

There are few literary studies on combining interval grey number with assembly line balance optimization. Therefore, this paper makes an important contribution in this regard.

Details

Grey Systems: Theory and Application, vol. 14 no. 2
Type: Research Article
ISSN: 2043-9377

Keywords

Article
Publication date: 17 October 2023

Derya Deliktaş and Dogan Aydin

Assembly lines are widely employed in manufacturing processes to produce final products in a flow efficiently. The simple assembly line balancing problem is a basic version of the…

Abstract

Purpose

Assembly lines are widely employed in manufacturing processes to produce final products in a flow efficiently. The simple assembly line balancing problem is a basic version of the general problem and has still attracted the attention of researchers. The type-I simple assembly line balancing problems (SALBP-I) aim to minimise the number of workstations on an assembly line by keeping the cycle time constant.

Design/methodology/approach

This paper focuses on solving multi-objective SALBP-I problems by utilising an artificial bee colony based-hyper heuristic (ABC-HH) algorithm. The algorithm optimises the efficiency and idleness percentage of the assembly line and concurrently minimises the number of workstations. The proposed ABC-HH algorithm is improved by adding new modifications to each phase of the artificial bee colony framework. Parameter control and calibration are also achieved using the irace method. The proposed model has undergone testing on benchmark problems, and the results obtained have been compared with state-of-the-art algorithms.

Findings

The experimental results of the computational study on the benchmark dataset unequivocally establish the superior performance of the ABC-HH algorithm across 61 problem instances, outperforming the state-of-the-art approach.

Originality/value

This research proposes the ABC-HH algorithm with local search to solve the SALBP-I problems more efficiently.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 9 June 2023

Binghai Zhou and Yufan Huang

The purpose of this paper is to cut down energy consumption and eliminate production waste on mixed-model assembly lines. Therefore, a supermarket integrated dynamic cyclic…

Abstract

Purpose

The purpose of this paper is to cut down energy consumption and eliminate production waste on mixed-model assembly lines. Therefore, a supermarket integrated dynamic cyclic kitting system with the application of electric vehicles (EVs) is introduced. The system resorts to just-in-time (JIT) and segmented sub-line assignment strategies, with the objectives of minimizing line-side inventory and energy consumption.

Design/methodology/approach

Hybrid opposition-based learning and variable neighborhood search (HOVMQPSO), a multi-objective meta-heuristics algorithm based on quantum particle swarm optimization is proposed, which hybridizes opposition-based learning methodology as well as a variable neighborhood search mechanism. Such algorithm extends the search space and is capable of obtaining more high-quality solutions.

Findings

Computational experiments demonstrated the outstanding performance of HOVQMPSO in solving the proposed part-feeding problem over the two benchmark algorithms non-dominated sorting genetic algorithm-II and quantum-behaved multi-objective particle swarm optimization. Additionally, using modified real-life assembly data, case studies are carried out, which imply HOVQMPSO of having good stability and great competitiveness in scheduling problems.

Research limitations/implications

The feeding problem is based on static settings in a stable manufacturing system with determined material requirements, without considering the occurrence of uncertain incidents. Current study contributes to assembly line feeding with EV assignment and could be modified to allow cooperation between EVs.

Originality/value

The dynamic cyclic kitting problem with sub-line assignment applying EVs and supermarkets is solved by an innovative HOVMQPSO, providing both novel part-feeding strategy and effective intelligent algorithm for industrial engineering.

Article
Publication date: 19 May 2023

Michail Katsigiannis, Minas Pantelidakis and Konstantinos Mykoniatis

With hybrid simulation techniques getting popular for systems improvement in multiple fields, this study aims to provide insight on the use of hybrid simulation to assess the…

Abstract

Purpose

With hybrid simulation techniques getting popular for systems improvement in multiple fields, this study aims to provide insight on the use of hybrid simulation to assess the effect of lean manufacturing (LM) techniques on manufacturing facilities and the transition of a mass production (MP) facility to incorporating LM techniques.

Design/methodology/approach

In this paper, the authors apply a hybrid simulation approach to improve an educational automotive assembly line and provide guidelines for implementing different LM techniques. Specifically, the authors describe the design, development, verification and validation of a hybrid discrete-event and agent-based simulation model of a LEGO® car assembly line to analyze, improve and assess the system’s performance. The simulation approach examines the base model (MP) and an alternative scenario (just-in-time [JIT] with Heijunka).

Findings

The hybrid simulation approach effectively models the facility. The alternative simulation scenario (implementing JIT and Heijunka LM techniques) improved all examined performance metrics. In more detail, the system’s lead time was reduced by 47.37%, the throughput increased by 5.99% and the work-in-progress for workstations decreased by up to 56.73%.

Originality/value

This novel hybrid simulation approach provides insight and can be potentially extrapolated to model other manufacturing facilities and evaluate transition scenarios from MP to LM.

Details

International Journal of Lean Six Sigma, vol. 15 no. 2
Type: Research Article
ISSN: 2040-4166

Keywords

Article
Publication date: 22 November 2023

Weiwen Mu, Wenbai Chen, Huaidong Zhou, Naijun Liu, Haobin Shi and Jingchen Li

This paper aim to solve the problem of low assembly success rate for 3c assembly lines designed based on classical control algorithms due to inevitable random disturbances and…

Abstract

Purpose

This paper aim to solve the problem of low assembly success rate for 3c assembly lines designed based on classical control algorithms due to inevitable random disturbances and other factors,by incorporating intelligent algorithms into the assembly line, the assembly process can be extended to uncertain assembly scenarios.

Design/methodology/approach

This work proposes a reinforcement learning framework based on digital twins. First, the authors used Unity3D to build a simulation environment that matches the real scene and achieved data synchronization between the real environment and the simulation environment through the robot operating system. Then, the authors trained the reinforcement learning model in the simulation environment. Finally, by creating a digital twin environment, the authors transferred the skill learned from the simulation to the real environment and achieved stable algorithm deployment in real-world scenarios.

Findings

In this work, the authors have completed the transfer of skill-learning algorithms from virtual to real environments by establishing a digital twin environment. On the one hand, the experiment proves the progressiveness of the algorithm and the feasibility of the application of digital twins in reinforcement learning transfer. On the other hand, the experimental results also provide reference for the application of digital twins in 3C assembly scenarios.

Originality/value

In this work, the authors designed a new encoder structure in the simulation environment to encode image information, which improved the model’s perception of the environment. At the same time, the authors used the fixed strategy combined with the reinforcement learning strategy to learn skills, which improved the rate of convergence and stability of skills learning. Finally, the authors transferred the learned skills to the physical platform through digital twin technology and realized the safe operation of the flexible printed circuit assembly task.

Details

Industrial Robot: the international journal of robotics research and application, vol. 51 no. 1
Type: Research Article
ISSN: 0143-991X

Keywords

Article
Publication date: 7 November 2023

Zhu Wang, Hongtao Hu and Tianyu Liu

Driven by sustainable production, mobile robots are introduced as a new clean-energy material handling tool for mixed-model assembly lines (MMALs), which reduces energy…

Abstract

Purpose

Driven by sustainable production, mobile robots are introduced as a new clean-energy material handling tool for mixed-model assembly lines (MMALs), which reduces energy consumption and lineside inventory of workstations (LSI). Nevertheless, the previous part feeding scheduling method was designed for conventional material handling tools without considering the flexible spatial layout of the robotic mobile fulfillment system (RMFS). To fill this gap, this paper focuses on a greening mobile robot part feeding scheduling problem with Just-In-Time (JIT) considerations, where the layout and number of pods can be adjusted.

Design/methodology/approach

A novel hybrid-load pod (HL-pod) and mobile robot are proposed to carry out part feeding tasks between material supermarkets and assembly lines. A bi-objective mixed-integer programming model is formulated to minimize both total energy consumption and LSI, aligning with environmental and sustainable JIT goals. Due to the NP-hard nature of the proposed problem, a chaotic differential evolution algorithm for multi-objective optimization based on iterated local search (CDEMIL) algorithm is presented. The effectiveness of the proposed algorithm is verified by dealing with the HL-pod-based greening part feeding scheduling problem in different problem scales and compared to two benchmark algorithms. Managerial insights analyses are conducted to implement the HL-pod strategy.

Findings

The CDEMIL algorithm's ability to produce Pareto fronts for different problem scales confirms its effectiveness and feasibility. Computational results show that the proposed algorithm outperforms the other two compared algorithms regarding solution quality and convergence speed. Additionally, the results indicate that the HL-pod performs better than adopting a single type of pod.

Originality/value

This study proposes an innovative solution to the scheduling problem for efficient JIT part feeding using RMFS and HL-pods in automobile MMALs. It considers both the layout and number of pods, ensuring a sustainable and environmental-friendly approach to production.

Details

Engineering Computations, vol. 40 no. 9/10
Type: Research Article
ISSN: 0264-4401

Keywords

Article
Publication date: 28 December 2022

Emanuele Gabriel Margherita and Alessio Maria Braccini

The purpose of this study is to explore how Industry 4.0 (I40) technologies support workers' engagement in soft total quality management (TQM) practices for organisational…

Abstract

Purpose

The purpose of this study is to explore how Industry 4.0 (I40) technologies support workers' engagement in soft total quality management (TQM) practices for organisational performance.

Design/methodology/approach

The authors conducted a multiple case study of six Italian manufacturing organisations that operate with I40 production and implement TQM practices. The authors concentrated on the relationship between I40 technologies and soft TQM aspects.

Findings

I40 technologies provide two forms of engagement with workers. Workers can act as machine supervisors and expert assembly operators. Organisations use five soft TQM practices to involve and develop workers for TQM that vary according to automation levels. The five soft TQM practices are top management design around workers, incremental trials with I40 technologies, worker empowerment, I40 sociotechnical collaboration and individual feedback systems.

Originality/value

In the literature that focusses primarily on how I40 technologies support the hard side of TQM by creating a data-driven and automated quality management system, the authors illustrate how the workforce can be engaged in I40 with five soft TQM practices to improve organisational performance. Thus, the authors complement the theory of hard and soft TQM aspects for I40 production systems.

1 – 10 of over 1000