Search results

1 – 10 of 83
Open Access
Article
Publication date: 18 January 2022

Srinimalan Balakrishnan Selvakumaran and Daniel Mark Hall

The purpose of this paper is to investigate the feasibility of an end-to-end simplified and automated reconstruction pipeline for digital building assets using the design science…

1446

Abstract

Purpose

The purpose of this paper is to investigate the feasibility of an end-to-end simplified and automated reconstruction pipeline for digital building assets using the design science research approach. Current methods to create digital assets by capturing the state of existing buildings can provide high accuracy but are time-consuming, expensive and difficult.

Design/methodology/approach

Using design science research, this research identifies the need for a crowdsourced and cloud-based approach to reconstruct digital building assets. The research then develops and tests a fully functional smartphone application prototype. The proposed end-to-end smartphone workflow begins with data capture and ends with user applications.

Findings

The resulting implementation can achieve a realistic three-dimensional (3D) model characterized by different typologies, minimal trade-off in accuracy and low processing costs. By crowdsourcing the images, the proposed approach can reduce costs for asset reconstruction by an estimated 93% compared to manual modeling and 80% compared to locally processed reconstruction algorithms.

Practical implications

The resulting implementation achieves “good enough” reconstruction of as-is 3D models with minimal tradeoffs in accuracy compared to automated approaches and 15× cost savings compared to a manual approach. Potential facility management use cases include the issue and information tracking, 3D mark-up and multi-model configurators.

Originality/value

Through user engagement, development, testing and validation, this work demonstrates the feasibility and impact of a novel crowdsourced and cloud-based approach for the reconstruction of digital building assets.

Details

Journal of Facilities Management , vol. 20 no. 3
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 30 April 2021

Sepehr Alizadehsalehi and Ibrahim Yitmen

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality…

8934

Abstract

Purpose

The purpose of this research is to develop a generic framework of a digital twin (DT)-based automated construction progress monitoring through reality capture to extended reality (RC-to-XR).

Design/methodology/approach

IDEF0 data modeling method has been designed to establish an integration of reality capturing technologies by using BIM, DTs and XR for automated construction progress monitoring. Structural equation modeling (SEM) method has been used to test the proposed hypotheses and develop the skill model to examine the reliability, validity and contribution of the framework to understand the DRX model's effectiveness if implemented in real practice.

Findings

The research findings validate the positive impact and importance of utilizing technology integration in a logical framework such as DRX, which provides trustable, real-time, transparent and digital construction progress monitoring.

Practical implications

DRX system captures accurate, real-time and comprehensive data at construction stage, analyses data and information precisely and quickly, visualizes information and reports in a real scale environment, facilitates information flows and communication, learns from itself, historical data and accessible online data to predict future actions, provides semantic and digitalize construction information with analytical capabilities and optimizes decision-making process.

Originality/value

The research presents a framework of an automated construction progress monitoring system that integrates BIM, various reality capturing technologies, DT and XR technologies (VR, AR and MR), arraying the steps on how these technologies work collaboratively to create, capture, generate, analyze, manage and visualize construction progress data, information and reports.

Details

Smart and Sustainable Built Environment, vol. 12 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 13 September 2022

Oliver Disney, Mattias Roupé, Mikael Johansson and Alessio Domenico Leto

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design…

4051

Abstract

Purpose

Building information modeling (BIM) is mostly limited to the design phase where two parallel processes exist, i.e. creating 2D-drawings and BIM. Towards the end of the design process, BIM becomes obsolete as focus shifts to producing static 2D-drawings, which leads to a lack of trust in BIM. In Scandinavia, a concept known as Total BIM has emerged, which is a novel “all-in” approach where BIM is the single source of information throughout the project. This paper's purpose is to investigate the overall concept and holistic approach of a Total BIM project to support implementation and strategy work connected to BIM.

Design/methodology/approach

Qualitative data were collected through eight semi-structured interviews with digitalization leaders from the case study project. Findings were analyzed using a holistic framework to BIM implementation.

Findings

The Total BIM concept was contingent on the strong interdependences between commonly found isolated BIM uses. Four main success factors were identified, production-oriented BIM as the main contractual and legally binding construction document, cloud-based model management, user-friendly on-site mobile BIM software and strong leadership.

Originality/value

A unique case is studied where BIM is used throughout all project phases as a single source of information and communication platform. No 2D paper drawings were used on-site and the Total BIM case study highlights the importance of a new digitalized construction process.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 21 May 2018

Parvaneh Shahsavand, Akbar Marefat and Majid Parchamijalal

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and…

45453

Abstract

Purpose

The purpose of this paper is to reveal the main causes of delays in the projects are from the client (relative importance index (RII)=0.716), labor and equipment (RII=0.701) and contractor (RII=0.698). Hence determining the contractual responsibility of delay is the most likely source of dispute in construction projects and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule. Therefore, authors try to investigate all process-based techniques of delay claims and evaluated and conformed them with principles by Society of Construction Law (SCL) protocol and Association for the Advancement of Cost Engineering International (AACEI) in order to choose the best techniques based on the specific circumstances of each project.

Design/methodology/approach

This section is divided into two distinct parts: refers to the methods used to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in construction industry; and refers to advantages and disadvantages of various techniques used to analyze delays and their conform with SCL protocol. A questionnaire was developed to assess the perceptions of clients, consultants, and contractors on the relative importance of causes of delay in Iranian construction industry. The respondents were asked to indicate their response category on 78 well-recognized construction delay factors identified by authors.

Findings

In total, 78 causes of delay were identified through research. The identified causes are combined into seven groups. The field survey included 58 contractors, 55 consultants, and 62 client. Data collected were analyzed by RII and Statistical Package for Social Sciences (SPSS). The authors identified main causes of delay and ten most important causes, according to Table AII, from the perspective of three major groups of participants (clients, consultants and contractors). The ranking of categories of causes of delay, according to Table I, were: client-related causes (RII=0.716); labor and equipment category causes (RII=0.701); contractor-related causes (RII=0.698); material-related causes (RII=0.690); design-related causes (RII=0.666); external causes (RII=0.662); and consultant-related causes (RII=0.662). But according to the discussions and given that determining the contractual responsibility of delay is the most likely source of dispute in construction industry and many techniques have been used in the courts to demonstrate the criticalities of a delay event on the project schedule.

Originality/value

All process-based techniques of delay analysis have been present in this paper and categorized in 11 groups. In order to understand the advantages and disadvantages of them by clients, contractor and consultant, a thorough review conducted to reveal the nature of techniques. In the next step, given that selecting the most appropriate technique based on constraints and specific conditions of each project is one of the most important steps to carry out a successful delay analysis. The authors conformed, all process-based techniques of delay analysis, by SCL protocol and AACEI principles. Finally, the result of this match was brought in order to choose the best technique based on the specific circumstances of each project.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 4
Type: Research Article
ISSN: 0969-9988

Keywords

Open Access
Article
Publication date: 19 January 2023

Benjamin Hellenborn, Oscar Eliasson, Ibrahim Yitmen and Habib Sadri

The purpose of this study is to identify the key data categories and characteristics defined by asset information requirements (AIR) and how this affects the development and…

1512

Abstract

Purpose

The purpose of this study is to identify the key data categories and characteristics defined by asset information requirements (AIR) and how this affects the development and maintenance of an asset information model (AIM) for a blockchain-based digital twin (DT).

Design/methodology/approach

A mixed-method approach involving qualitative and quantitative analysis was used to gather empirical data through semistructured interviews and a digital questionnaire survey with an emphasis on AIR for blockchain-based DTs from a data-driven predictive analytics perspective.

Findings

Based on the analysis of results three key data categories were identified, core data, static operation and maintenance (OM) data, and dynamic OM data, along with the data characteristics required to perform data-driven predictive analytics through artificial intelligence (AI) in a blockchain-based DT platform. The findings also include how the creation and maintenance of an AIM is affected in this context.

Practical implications

The key data categories and characteristics specified through AIR to support predictive data-driven analytics through AI in a blockchain-based DT will contribute to the development and maintenance of an AIM.

Originality/value

The research explores the process of defining, delivering and maintaining the AIM and the potential use of blockchain technology (BCT) as a facilitator for data trust, integrity and security.

Details

Smart and Sustainable Built Environment, vol. 13 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 11 July 2019

Matthew Li, David Allinson and Kevin Lomas

The purpose of this paper is to identify the impact of traditionally unmonitored energy sources and sinks on assessment of the as-built thermal performance of occupied homes. The…

2543

Abstract

Purpose

The purpose of this paper is to identify the impact of traditionally unmonitored energy sources and sinks on assessment of the as-built thermal performance of occupied homes. The analysis aims to demonstrate the potential scale of uncertainties introduced in a heat balance estimation of the heat transfer coefficient (HTC) when using in-use monitored data.

Design/methodology/approach

Energy flows for two UK homes – one a 1930s dwelling with high heat loss, the second a higher-performing 2014-built home – are predicted using the UK Government’s standard assessment procedure (SAP) and visualised using Sankey diagrams. Selected modelled energy flows are used as inputs in a quasi-steady state heat balance to calculate in-use HTCs as if from measured data sets gathered in occupied homes. The estimated in-use HTCs are compared against SAP-calculated values to illustrate the impact of including or omitting various heat sources and sinks.

Findings

The results demonstrate that for dwellings with low heat loss, the increased proportion of heating demand met by unmetered internal and solar gains informs a greater sensitivity of a heat balance estimation of the HTC to their omission. While simple quasi-steady state heat balance methods may be appropriate for dwellings with very high heat loss, alternative approaches are likely to be required for those with lower heat loss.

Originality/value

A need to understand the impacts of unmetered heat flows on the accuracy with which a building’s thermal performance may be inferred from in-use monitored data is identified: this paper illustrates the scale of these impacts for two homes at opposite ends of the energy performance scale.

Details

International Journal of Building Pathology and Adaptation, vol. 38 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 1 December 2023

Lina Gharaibeh, Sandra Matarneh, Kristina Eriksson and Björn Lantz

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on…

Abstract

Purpose

This study aims to present a state-of-the-art review of building information modelling (BIM) in the Swedish construction practice with a focus on wood construction. It focuses on examining the extent, maturity and actual practices of BIM in the Swedish wood construction industry, by analysing practitioners’ perspectives on the current state of BIM and its perceived benefits.

Design/methodology/approach

A qualitative approach was selected, given the study’s exploratory character. Initially, an extensive review was undertaken to examine the current state of BIM utilisation and its associated advantages within the construction industry. Subsequently, empirical data were acquired through semi-structured interviews featuring open-ended questions, aimed at comprehensively assessing the prevailing extent of BIM integration within the Swedish wood construction sector.

Findings

The research concluded that the wood construction industry in Sweden is shifting towards BIM on different levels, where in some cases, the level of implementation is still modest. It should be emphasised that the wood construction industry in Sweden is not realising the full potential of BIM. The industry is still using a combination of BIM and traditional methods, thus, limiting the benefits that full BIM implementation could offer the industry.

Originality/value

This study provided empirical evidence on the current perceptions and state of practice of the Swedish wood construction industry regarding BIM maturity.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 28 September 2022

Yuxin Zhang, Wei Dong, Junyan Wang, Congcong Che and Lefei Li

Through this research study, the authors found that digital thread has made significant progress in the life cycle management of the US Air Force. The authors hope that by…

1666

Abstract

Purpose

Through this research study, the authors found that digital thread has made significant progress in the life cycle management of the US Air Force. The authors hope that by reviewing similar studies in the aerospace field, the meaning of digital thread can be summarized and applied to a wider range of fields. In addition, theoretically, the definition of digital twin and digital thread are not unified. The authors hope that the comparison of digital thread and digital twin will better enable scholars to distinguish between the two concepts. Besides, the authors are also looking forward that more people will realize the significance of digital thread and carry out future research.

Design/methodology/approach

Complete research about digital thread and the relevant concept of the digital twin is conducted. First, by searching in Google Scholar with the keyword “digital thread”, the authors filter results and save literature with high relevance to digital thread. The authors also track these papers’ references for more paper of digital thread and digital twin. After removing the duplicate and low-relevance literature, 72 digital thread-related literature studies are saved and further analyzed from the perspective of time development, application field and research directions.

Findings

Digital thread application in industries other than the aviation manufacturing industry is still relatively few, and the research on the application of digital thread in real industrial scenarios is mainly at the stage of framework design and design-side decision optimization. In addition, the digital thread needs a new management mechanism and organizational structure to realize landing. The new management mechanism and the process can adapt to the whole life cycle management process based on the digital thread, manage the data security and data update, and promote the digital thread to play a better effect on the organizational management.

Practical implications

Based on a review of digital thread, future research directions and usage suggestions are given. The fault diagnosis of high-speed train bogie as an example shows the effectiveness of the method and also partially demonstrates the advantages and effects brought by the digital thread connecting the data models at various stages.

Originality/value

This paper first investigates and analyzes the theoretical connotation and research progress of digital thread and gives a complete definition of digital thread from the perspective of the combination of digital thread and digital twins. Next, the research process of digital thread is reviewed, and the application fields, research directions and achievements in recent years are summarized. Finally, taking the fault diagnosis of high-speed train bogie as an example partially demonstrates the advantages and effects brought by the digital thread connecting the data models at various stages.

Details

Digital Transformation and Society, vol. 1 no. 2
Type: Research Article
ISSN: 2755-0761

Keywords

Open Access
Article
Publication date: 7 March 2023

Solomon O. Obadimu and Kyriakos I. Kourousis

Honeycombs enjoy wide use in various engineering applications. The emergence of additive manufacturing (AM) as a method of customisable of parts has enabled the reinvention of the…

1163

Abstract

Purpose

Honeycombs enjoy wide use in various engineering applications. The emergence of additive manufacturing (AM) as a method of customisable of parts has enabled the reinvention of the honeycomb structure. However, research on in-plane compressive performance of both classical and new types of honeycombs fabricated via AM is still ongoing. Several important findings have emerged over the past years, with significance for the AM community and a review is considered necessary and timely. This paper aims to review the in-plane compressive performance of AM honeycomb structures.

Design/methodology/approach

This paper provides a state-of-the-art review focussing on the in-plane compressive performance of AM honeycomb structures, covering both polymers and metals. Recently published studies, over the past six years, have been reviewed under the specific theme of in-plane compression properties.

Findings

The key factors influencing the AM honeycombs' in-plane compressive performance are identified, namely the geometrical features, such as topology shape, cell wall thickness, cell size and manufacturing parameters. Moreover, the techniques and configurations commonly used for geometry optimisation toward improving mechanical performance are discussed in detail. Current AM limitations applicable to AM honeycomb structures are identified and potential future directions are also discussed in this paper.

Originality/value

This work evaluates critically the primary results and findings from the published research literature associated with the in-plane compressive mechanical performance of AM honeycombs.

Details

International Journal of Structural Integrity, vol. 14 no. 3
Type: Research Article
ISSN: 1757-9864

Keywords

Open Access
Book part
Publication date: 1 May 2019

Giles Thomson, Göran Lindahl, Ammar Shemery, Mattias Roupé, Keith Hampson and Mikael Johansson

The purpose of this paper is to introduce and discuss potential applications of emerging Building Information Model (BIM) and related technologies as applied to healthcare…

Abstract

Purpose

The purpose of this paper is to introduce and discuss potential applications of emerging Building Information Model (BIM) and related technologies as applied to healthcare facilities. The paper presents example of applications of digital tools enabled by BIM that support more integrated outcomes for complex healthcare projects.

Approach

Paper formulation by a transdisciplinary author group with ideas and approaches developed through discussions and writing to explore future research directions. Initial ideas are supplemented by a literature review with examples introduced where relevant.

Findings

BIM as a front-end construction engineering tool is quite mature. Application of BIM and related tools to support complex healthcare at the precinct scale, for facilities management (FM), including improved user experience (UX) has been limited but shows great promise to support complex healthcare projects.

Research Limitations/Implications

The research presented is limited and exploratory as it represents the first step by this group to investigate an integrated approach to digital healthcare design and FM.

Practical Implications

The paper introduces the considerable benefits of BIM models, and related tools for FM and/or UX (both staff and patients) to save time, money and improves efficiency and accuracy in healthcare facilities.

Originality/Value

The transdisciplinary author group brought broad perspectives to the potential benefits of combining accurate data-rich legacy building models with other digital tools for increased integration and co-ordination at all life stages of a healthcare precinct.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

1 – 10 of 83