Search results

1 – 10 of 224
Article
Publication date: 2 March 2023

Mohammad A. Hassanain and Mohammad B. Hamida

This paper aims to provide architecture, engineering, construction and facilities management (AEC/FM) practitioners with a guiding tool for overcoming the challenges affecting…

Abstract

Purpose

This paper aims to provide architecture, engineering, construction and facilities management (AEC/FM) practitioners with a guiding tool for overcoming the challenges affecting their performance in adaptive reuse project.

Design/methodology/approach

Literature review was conducted to comprehend the challenges affecting the AEC/FM performance during the implementation of adaptive reuse projects. A case study was conducted on an adaptively reused building, located in Saudi Arabia. The case study building was converted from a bookstore into an amusement center. Document review of the as-built drawings, and a structured interview with the project manager were conducted. The study concluded with the development of AEC/FM practical guidelines, pertaining to the different involved domains.

Findings

This study indicated that the potential challenges are interrelated among the three domains. These challenges pertained to the spatial, legislative, technical, administrative and operational aspects. The findings emphasized the vital role of the integration among the AEC/FM domains, at the early project planning phases. Based on the findings, three sets of AEC/FM guidelines were developed.

Research limitations/implications

Theoretically, to the best of the authors’ knowledge, this is the first study that provides a case-specific investigation of the challenges affecting the AEC/FM performance in adaptive reuse projects.

Practical implications

The developed practical guidelines could potentially enhance the AEC/FM performance in future adaptive reuse projects.

Originality/value

This study contributes to the practice of adaptive reuse projects through providing practical guidelines for mitigating the challenges that affect the AEC/FM performance in these projects.

Details

Facilities , vol. 41 no. 7/8
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 30 May 2023

Sharifah Nur Aina Syed Alwee, Umi Kalsum Zolkafli and Hafez Salleh

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in…

Abstract

Purpose

The era of digital construction, including building information modelling (BIM), has placed a high demand for a seamless collaboration of people, technology and processes in meeting a project delivery. The project actors involved in a BIM process must ensure compliance with all regulations and contractual requirements from inception. While many studies have disclosed the various contractual implications arising from BIM implementation, little has been examined on the current state of BIM in contract administration practice, particularly in the Malaysian construction industry. This study aims to explore the current state of BIM implementation with specific reference to a design-and-build construction project.

Design/methodology/approach

The exploratory case study involved the construction of a public complex. Semi-structured interviews were carried out with the project actors, and document analysis was performed on the project’s contractual guidelines to derive the findings.

Findings

Findings from the thematic analysis revealed the following five sequences of activities that guided the contract administration practices, particularly during the pre-contract and post-contract stages of a BIM-based construction project: project inception, tendering phase, detailed design, construction and preparation for the handing over phase. Most of the activities were conducted to deliver the final BIM outputs successfully. Nevertheless, some shortcomings were noted in the project monitoring, the validation process of the BIM deliverables and the BIM players’ competency level in fulfilling the specified BIM contractual requirements.

Practical implications

The study contributes to a practical understanding of how BIM can affect project administration and how a public client can improve contractual risk allocation in future BIM implementation.

Originality/value

This paper discloses the current practices of contract administration to better understand the impacts of BIM management during the pre-contract and post-contract stages of a BIM-based construction project.

Details

Facilities , vol. 41 no. 11/12
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 4 March 2024

Janet Chang, Klaudia Jaskula, Eleni Papadonikolaki, Dimitrios Rovas and Ajith Kumar Parlikad

This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction…

Abstract

Purpose

This research investigates the distinct characteristics of blockchain technology to safeguard against the deterioration of handover information quality in the post-construction phase. The significance of effective management of handover information is highlighted by global building failures, such as the Grenfell Tower fire in London, UK. Despite existing technological interventions, there remains a paucity of understanding regarding the factors contributing to the decline in the quality of handover information during the post-construction phase.

Design/methodology/approach

This study employed a multi-case studies approach across five higher education institutions. It involved conducting semi-structured interviews with 52 asset management professionals, uncovering the underlying reasons for the decline in handover information quality. Building on these insights, the study performed a mapping exercise to align these identified factors with blockchain technology features and information quality dimensions, aiming to evaluate blockchain’s potential in managing quality handover information.

Findings

The study findings suggest that blockchain technology offers advantages but has limitations in addressing all the identified quality issues of managing handover information. Due to the lack of an automated process and file-based information exchange, updating handover information still requires an error-prone manual process, leading to potential information loss. Additionally, no solutions are available for encoding drawings for updates and validation.

Originality/value

This study proposes a framework integrating blockchain to enhance the information management process and improve handover information quality.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 7 September 2021

Christian Nnaemeka Egwim, Hafiz Alaka, Luqman Olalekan Toriola-Coker, Habeeb Balogun, Saheed Ajayi and Raphael Oseghale

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Abstract

Purpose

This paper aims to establish the most underlying factors causing construction projects delay from the most applicable.

Design/methodology/approach

The paper conducted survey of experts using systematic review of vast body of literature which revealed 23 common factors affecting construction delay. Consequently, this study carried out reliability analysis, ranking using the significance index measurement of delay parameters (SIDP), correlation analysis and factor analysis. From the result of factor analysis, this study grouped a specific underlying factor into three of the six applicable factors that correlated strongly with construction project delay.

Findings

The paper finds all factors from the reliability test to be consistent. It suggests project quality control, project schedule/program of work, contractors’ financial difficulties, political influence, site conditions and price fluctuation to be the six most applicable factors for construction project delay, which are in the top 25% according to the SIDP score and at the same time are strongly associated with construction project delay.

Research limitations/implications

This paper is recommending that prospective research should use a qualitative and inductive approach to investigate whether any new, not previously identified, underlying factors that impact construction projects delay can be discovered as it followed an inductive research approach.

Practical implications

The paper includes implications for the policymakers in the construction industry in Nigeria to focus on measuring the key suppliers’ delivery performance as late delivery of materials by supplier can result in rescheduling of work activities and extra time or waiting time for construction workers as well as for the management team at site. Also, construction stakeholders in Nigeria are encouraged to leverage the amount of data produced from backlog of project schedules, as-built drawings and models, computer-aided designs (CAD), costs, invoices and employee details, among many others through the aid of state-of-the-art data driven technologies such as artificial intelligence or machine learning to make key business decisions that will help drive further profitability. Furthermore, this study suggests that these stakeholders use climatological data that can be obtained from weather observations to minimize impact of bad weather during construction.

Originality/value

This paper establishes the three underlying factors (late delivery of materials by supplier, poor decision-making and Inclement or bad weather) causing construction projects delay from the most applicable.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 5
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 June 2022

James Geisbush and Samuel T. Ariaratnam

Reliability centered maintenance (RCM) is a process used to determine activities to be taken to ensure an asset continues to perform asset's function in asset's present operating…

1455

Abstract

Purpose

Reliability centered maintenance (RCM) is a process used to determine activities to be taken to ensure an asset continues to perform asset's function in asset's present operating context by identifying asset's function, failure modes that could preclude performing asset's intended function, prioritizing failure modes and determining effective preventative maintenance tasks that can be cost effectively and efficiently implemented to reduce the likelihood of a failure.

Design/methodology/approach

A comprehensive survey of literature was undertaken to examine the current industry state of practice. Various industries were examined to better understand applications of RCM within the various industry sectors and determine those industries that RCM has not historically been readily adopted. A case study example of RCM applied to radial gates for water control in open channel canals for water conveyance is presented to demonstrate a civil infrastructure application.

Findings

The results found that RCM has been used since RCM's inception in the airline industry during the 1960s to reduce the cost of maintaining aircrafts. Over the past 40 years, an assortment of industries has begun implementing cost effective preventative maintenance tasks identified during RCM analysis. However, there is a noticeable lack of civil assets being analyzed by RCM, such as water conveyance systems and other civil infrastructure systems vital to the health and well-being of today's societies.

Originality/value

The comprehensive literature review of the current state of practice will provide a better understanding of the various applications of RCM to facilitate RCM's application to other industries, thereby reducing failure due to early identification of maintenance tasks. An example RCM demonstrates the application to a radial gate, used in water conveyance for the drinking water and irrigation sectors, which have not historically used RCM for developing maintenance strategies.

Details

Journal of Quality in Maintenance Engineering, vol. 29 no. 2
Type: Research Article
ISSN: 1355-2511

Keywords

Article
Publication date: 19 January 2024

Mohamed Marzouk and Mohamed Zaher

Facility management gained profound importance due to the increasing complexity of different systems and the cost of operation and maintenance. However, due to the increasing…

56

Abstract

Purpose

Facility management gained profound importance due to the increasing complexity of different systems and the cost of operation and maintenance. However, due to the increasing complexity of different systems, facility managers may suffer from a lack of information. The purpose of this paper is to propose a new facility management approach that links segmented assets to the vital data required for managing facilities.

Design/methodology/approach

Automatic point cloud segmentation is one of the most crucial processes required for modelling building facilities. In this research, laser scanning is used for point cloud acquisition. The research utilises region growing algorithm, colour-based region-growing algorithm and Euclidean cluster algorithm.

Findings

A case study is worked out to test the accuracy of the considered point cloud segmentation algorithms utilising metrics precision, recall and F-score. The results indicate that Euclidean cluster extraction and region growing algorithm revealed high accuracy for segmentation.

Originality/value

The research presents a comparative approach for selecting the most appropriate segmentation approach required for accurate modelling. As such, the segmented assets can be linked easily with the data required for facility management.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 15 June 2023

Amna Salman and Wasiq Ahmad

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only…

Abstract

Purpose

The Operations and Maintenance (O&M) cost of a facility is typically 60–85% of the total life cycle cost of a building whereas its design and construction cost accounts for only 5–10%. Therefore, enhancing and optimizing the O&M of a facility is a crucial issue. In addition, with the increasing complexities in a building's operating systems, more technologically advanced solutions are required for proactively maintaining a facility. Thereby, a tool is needed which can optimize and reduce the cost of facility maintenance. One of the solutions is Augmented or Mixed Reality (AR/MR) technologies which can reduce repair time, training time and streamline inspections. Therefore, the purpose of this study is to establish contextual knowledge of AR/MR application in facilities operation and maintenance and present an implementation framework through the analysis and classification of articles published between 2015 and 2022.

Design/methodology/approach

To effectively understand all AR/MR applications in facilities management (FM), a systematic literature review is performed. The Preferred Reporting Items for Systematic Reviews and Meta-Analysis (PRISMA) protocol was followed for searching and describing the search strategies. Keywords were identified through the concept mapping technique. The Scopus database and Google Scholar were employed to find relevant articles, books and conference papers. A thorough bibliometric analysis was conducted using VOS Viewer and subsequently, a thematic analysis was performed for the selected publications.

Findings

The use of AR/MR within facilities O&M could be categorized into five different application areas: (1) visualization; (2) maintenance; (3) indoor localization and positioning; (4) information management and (5) indoor environment. After a thematic analysis of the literature, it was found that maintenance and indoor localization were the most frequently used research application domains. The chronological evolution of AR/MR in FM is also presented along with the origin of publications, which showed that the technology is out of its infancy stage and is ready for implementation. However, literature showed many challenges hindering this goal, that is (1) reluctance of the organizational leadership to bear the cost of hardware and trainings for the employees, (2) Lack of BIM use in FM and (3) system lagging, crashing and unable to register the real environment. A preliminary framework is presented to overcome these challenges.

Originality/value

This study accommodates a variety of application domains within facilities O&M. The publications were systematically selected from the existing literature and then reviewed to exhibit various AR/MR applications to support FM. There have been no literature reviews that focus on AR and/or MR in the FM and this paper fills the gap by not only presenting its applications but also developing an implementation framework.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 9 October 2023

Mohammad A. Hassanain, Mahmoud A. Zourob and Ahmed M. Ibrahim

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of…

Abstract

Purpose

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of facilities managers and consultants’ practices.

Design/methodology/approach

A literature review was undertaken to determine the different tasks that facilities managers typically handle, identify project phases and their underlying activities in which facilities managers would be involved. This was followed by targeting a group of consultants to build a consensus, upon the identified involvement of facilities managers, over the PLP, while measuring the level of involvement from a representative group of facilities managers in Saudi Arabia. A matching between the perceptions and practice has been performed to serve as recommendations for future research on improving the practice in Saudi Arabia.

Findings

The involvement of facilities managers in the PLP is relatively low, according to the consultants’ perceptions. Consultants perceive that facilities managers should be involved in more professional activities, which would ultimately improve projects’ delivery to clients.

Practical implications

The involvement of facilities managers over the PLP ensures effective delivery of projects and reduces the multiplicity of challenges at the operation and maintenance phase. The viewing of facility managers’ involvement adds to the effectiveness of their role within the building industry.

Originality/value

This paper investigates the consultants’ perception of the involvement venues for facility managers to perform activities which are evaluated to be “mandatory,” “advantageous” or “not necessary.” The study reflects the state of facilities management practice, and the consensus of consultants toward the role of the facility managers through the PLP.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 1 June 2023

Firehiwot Kedir, Daniel M. Hall, Sara Brantvall, Jerker Lessing, Alexander Hollberg and Ranjith K. Soman

This paper aims to conduct a qualitative assessment of synergies between information flows of a multifamily product platform used for industrialized housing and materials…

Abstract

Purpose

This paper aims to conduct a qualitative assessment of synergies between information flows of a multifamily product platform used for industrialized housing and materials passports that can promote a circular economy in the construction industry.

Design/methodology/approach

Using a single case study method, the research assesses the availability and accessibility of materials passport-relevant information generated by a leading Swedish industrialized housing construction firm. Data is collected using semistructured interviews, document analysis and an extended research visit.

Findings

The research findings identify the functional layers of the product platform, map the information flow using a process diagram, assess the availability and accessibility of material passport relevant information by lifecycle stage and actor, and summarize the key points using a SWOT (strengths, weaknesses, opportunities and threats) analysis.

Research limitations/implications

The three main implications are: the technical and process platforms used in industrialized construction allow for generating standardized, digital and reusable information; the vertical integration of trades and long-term relationships with suppliers improve transparency and reduce fragmentation in information flows; and the design-build-operate business model strategy incentivizes actors to manage information flows in the use phase.

Practical implications

Industrialized construction firms can use this paper as an approach to understand and map their information flows to identify suitable approaches to generate and manage materials passports.

Originality/value

The specific characteristics of product platforms and industrialized construction provide a unique opportunity for circular information flow across the building lifecycle, which can support material passport adoption to a degree not often found in the traditional construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 30 March 2022

Laura Blackburne, Koorosh Gharehbaghi, Ken Farnes, Olivia Moore and Melisa Russo

The purpose of this paper is to evaluate the green building certification systems. In doing so, a validation process, using confirmatory factor analysis (CFA), was undertaken.

Abstract

Purpose

The purpose of this paper is to evaluate the green building certification systems. In doing so, a validation process, using confirmatory factor analysis (CFA), was undertaken.

Design/methodology/approach

An extensive literature review was conducted to highlight the paramount aspects of green building certification systems. Then, using a grounded theory, key findings of the initial literature review were explored. This was necessary to form a broad theoretical framework. Finally, CFA was performed to evaluate various green building certification systems.

Findings

Initially, it was noted that accreditation process was the central key for effective building certification systems, particularly at the international level. Further, using CFA, it was also determined that to increase the sustainable performance of the green building certification, meeting the increasing expectation of the system user is paramount.

Practical implications

When evaluating the green building certification systems, it is recommended to focus on a specific aspect of the programmes holistically. This needs to be done particularly towards delivering a clear message to the stakeholders globally; doing so may alleviate the many challenges of green building certifications.

Originality/value

Currently, various green building certification systems have been developed for local purposes. This raises the question of the adaptability of these systems across varying climates and geography in differing regions. Using CFA, this research will examine various green building certification systems to evaluate their applicability at a global level.

Details

Journal of Science and Technology Policy Management, vol. 14 no. 4
Type: Research Article
ISSN: 2053-4620

Keywords

1 – 10 of 224