Book part
Publication date: 5 October 2018

Olubukola Tokede, Adam Ayinla and Sam Wamuziri

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different…

Abstract

The robust appraisal of exploration drilling concepts is essential for establishing the economic viability of a prospective recovery field. This study evaluates the different concept selection methods that were considered for drilling operations at the Trym field in Norway. The construction of drilling rigs is a capital-intensive process, and it involves high levels of economic risk. These risks can be broadly categorised as aleatoric (i.e. those related to chance) and epistemic (i.e. those related to knowledge). Evaluating risks in the investment appraisal process tends to be a complicated process. Project risks are evaluated using Monte Carlo simulation (MCS) and are based on the fuzzy analytic hierarchy process (AHP). MCS provides a useful means of evaluating variabilities (i.e. aleatoric risks) in oil drilling operations. However, many of the economic risks in oil drilling processes are unanticipated, and, in some cases, are not readily expressible in quantitative values. The fuzzy AHP is therefore used to appraise the qualitatively defined indirect revenues comprising risks that affect future flexibilities, schedule certainty and health and safety performance. Both the Monte Carlo technique and the fuzzy AHP technique found that a cumulative revenue variation of up to 30% is possible in any of the considered drilling options. The fuzzy AHP technique estimates that the chances of profitability being less than NOK 1 billion over a five-year period is 0.5%, while the Monte Carlo technique estimates suggest a more conservative proportion of 10%. Overall, the fuzzy AHP technique is easy to use and flexible, and it demonstrates increased robustness and improved predictability.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Nicolás Marín Ruiz, María Martínez-Rojas, Carlos Molina Fernández, José Manuel Soto-Hidalgo, Juan Carlos Rubio-Romero and María Amparo Vila Miranda

The construction sector has significantly evolved in recent decades, in parallel with a huge increase in the amount of data generated and exchanged in any construction project…

Abstract

The construction sector has significantly evolved in recent decades, in parallel with a huge increase in the amount of data generated and exchanged in any construction project. These data need to be managed in order to complete a successful project in terms of quality, cost and schedule in the the context of a safe project environment while appropriately organising many construction documents.

However, the origin of these data is very diverse, mainly due to the sector’s characteristics. Moreover, these data are affected by uncertainty, complexity and diversity due to the imprecise nature of the many factors involved in construction projects. As a result, construction project data are associated with large, irregular and scattered datasets.

The objective of this chapter is to introduce an approach based on a fuzzy multi-dimensional model and on line analytical processing (OLAP) operations in order to manage construction data and support the decision-making process based on previous experiences. On one hand, the proposal allows for the integration of data in a common repository which is accessible to users along the whole project’s life cycle. On the other hand, it allows for the establishment of more flexible structures for representing the data of the main tasks in the construction project management domain. The incorporation of this fuzzy framework allows for the management of imprecision in construction data and provides easy and intuitive access to users so that they can make more reliable decisions.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Long D. Nguyen, Long Le-Hoai, Dai Q. Tran, Chau N. Dang and Chau V. Nguyen

Managing complex construction projects is a challenging task because it involves multiple factors and decision-making processes. A systematic evaluation of these complex factors…

Abstract

Managing complex construction projects is a challenging task because it involves multiple factors and decision-making processes. A systematic evaluation of these complex factors is imperative for achieving project success. As most of these factors are qualitative or intangible in nature, decision makers often rely on subjective judgements when comparing and evaluating them. The hybrid techniques that integrate fuzzy set theory and the analytic hierarchy process (AHP) are able to deal with such problems. This chapter discusses various hybrid techniques of the fuzzy AHP and presents an application of these techniques to the evaluation of transportation project complexity, which is essential for prioritising resource allocation and assessing project performance. Project complexity can be quantified and visualised effectively with the application of the fuzzy AHP. This chapter enhances the understanding of construction project complexity and fuzzy hybrid computing in construction engineering and management. Future research should address the calibration of fuzzy membership functions in pairwise comparisons for each individual decision maker and develop computational tools for solving optimisation problems in the constrained fuzzy AHP. In the area of construction project complexity, future research should investigate how scarce resources are allocated to better manage complex projects and how appropriate resource allocation improves their performance.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Long Chen and Wei Pan

With numerous and ambiguous sets of information and often conflicting requirements, construction management is a complex process involving much uncertainty. Decision makers may be…

Abstract

With numerous and ambiguous sets of information and often conflicting requirements, construction management is a complex process involving much uncertainty. Decision makers may be challenged with satisfying multiple criteria using vague information. Fuzzy multi-criteria decision-making (FMCDM) provides an innovative approach for addressing complex problems featuring diverse decision makers’ interests, conflicting objectives and numerous but uncertain bits of information. FMCDM has therefore been widely applied in construction management. With the increase in information complexity, extensions of fuzzy set (FS) theory have been generated and adopted to improve its capacity to address this complexity. Examples include hesitant FSs (HFSs), intuitionistic FSs (IFSs) and type-2 FSs (T2FSs). This chapter introduces commonly used FMCDM methods, examines their applications in construction management and discusses trends in future research and application. The chapter first introduces the MCDM process as well as FS theory and its three main extensions, namely, HFSs, IFSs and T2FSs. The chapter then explores the linkage between FS theory and its extensions and MCDM approaches. In total, 17 FMCDM methods are reviewed and two FMCDM methods (i.e. T2FS-TOPSIS and T2FS-PROMETHEE) are further improved based on the literature. These 19 FMCDM methods with their corresponding applications in construction management are discussed in a systematic manner. This review and development of FS theory and its extensions should help both researchers and practitioners better understand and handle information uncertainty in complex decision problems.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Ernest Effah Ameyaw and Albert P. C. Chan

Allocating risk in public–private partnership (PPP) projects based on public–private parties’ risk management (RM) capabilities is a condition for success of these projects. In…

Abstract

Allocating risk in public–private partnership (PPP) projects based on public–private parties’ risk management (RM) capabilities is a condition for success of these projects. In practice, however, risks are allocated to these parties beyond their respective RM capabilities. Too much risk is often assigned to the private or public party, resulting in poor RM and costly contract renegotiations and terminations. This chapter proposes a methodology based on fuzzy set theory (FST) in which decision makers (DMs) use linguistic variables to assess and calculate RM capability values of public–private parties for risk events and to arrive at risk allocation (RA) decisions. The proposed methodology is based on integrating RA decision criteria, the Delphi method and the fuzzy synthetic evaluation (FSE) technique. The application of FSE allows for the introduction of linguistic variables that express DMs’ evaluations of RM capabilities. This provides a means to deal with the problems of qualitative, multi-criteria analysis, subjectivity and uncertainty that characterise decision-making in the construction domain. The methodology is outlined and demonstrated based on empirical data collected through a three-round Delphi survey. The public–private parties’ RM capability values for land acquisition risk are calculated using the proposed methodology. The methodology is helpful for performing fuzzy-based analysis in PPP projects, even in the event of limited or no data. This chapter makes the contribution of presenting a RA decision-making methodology that is easy to understand and use in PPP contracting and that enables DMs to track calculations of RM capability values.

Book part
Publication date: 5 October 2018

Xin Wang and Chris Gordon

This chapter presents a novel human arm gesture tracking and recognition technique based on fuzzy logic and nonlinear Kalman filtering with applications in crane guidance. A…

Abstract

This chapter presents a novel human arm gesture tracking and recognition technique based on fuzzy logic and nonlinear Kalman filtering with applications in crane guidance. A Kinect visual sensor and a Myo armband sensor are jointly utilised to perform data fusion to provide more accurate and reliable information on Euler angles, angular velocity, linear acceleration and electromyography data in real time. Dynamic equations for arm gesture movement are formulated with Newton–Euler equations based on Denavit–Hartenberg parameters. Nonlinear Kalman filtering techniques, including the extended Kalman filter and the unscented Kalman filter, are applied in order to perform reliable sensor fusion, and their tracking accuracies are compared. A Sugeno-type fuzzy inference system is proposed for arm gesture recognition. Hardware experiments have shown the efficacy of the proposed method for crane guidance applications.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Denise M. Case, Ty Blackburn and Chrysostomos Stylios

This chapter discusses the application of fuzzy cognitive map (FCM) modelling to construction management (CM) challenges and problems. It focuses on the critical issue of managing…

Abstract

This chapter discusses the application of fuzzy cognitive map (FCM) modelling to construction management (CM) challenges and problems. It focuses on the critical issue of managing the complexity and uncertainty inherent in CM by providing a new intelligent layer that enhances classical approaches to construction modelling and management. It investigates how the myriad types of internal and external factors affecting the feasibility and performance of construction projects can be modelled using a fuzzy hybrid method that explores the complex relationships among many contributing factors and assesses and evaluates their impacts on past and future projects. This chapter proposes a hybrid modelling approach in the traditional context of cost, schedule and risk management and describes how augmenting and enhancing existing state-of-the-art tools and processes in CM can assist construction managers. This chapter provides a background on the theory of FCMs, presents foundational and current research, and explains how to apply this approach in the CM domain. This chapter also provides a detailed description of how to develop, modify and employ interactive models to specific CM challenges and problems. It includes a customisable, interactive base model and demonstrates how the model has been applied to specific CM events and issues. Examples are presented that highlight the interplay between project-specific goals and characteristics and the way these impact the interrelated and often opposing triad of cost, schedule and risk. The presented examples and practical applications make this state-of-the-art approach useful to both academic and industry practitioners.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Book part
Publication date: 5 October 2018

Olalekan Shamsideen Oshodi and Ka Chi Lam

Fluctuations in the tender price index have an adverse effect on the construction sector and the economy at large. This is largely due to the positive relationship that exists…

Abstract

Fluctuations in the tender price index have an adverse effect on the construction sector and the economy at large. This is largely due to the positive relationship that exists between the construction industry and economic growth. The consequences of these variations include cost overruns and schedule delays, among others. An accurate forecast of the tender price index is good for controlling the uncertainty associated with its variation. In the present study, the efficacy of using an adaptive neuro-fuzzy inference system (ANFIS) for tender price forecasting is investigated. In addition, the Box–Jenkins model, which is considered a benchmark technique, was used to evaluate the performance of the ANFIS model. The results demonstrate that the ANFIS model is superior to the Box–Jenkins model in terms of the accuracy and reliability of the forecast. The ANFIS could provide an accurate and reliable forecast of the tender price index in the medium term (i.e. over a three-year period). This chapter provides evidence of the advantages of applying nonlinear modelling techniques (such as the ANFIS) to tender price index forecasting. Although the proposed ANFIS model is applied to the tender price index in this study, it can also be applied to a wider range of problems in the field of construction engineering and management.

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2

Keywords

Content available
Book part
Publication date: 5 October 2018

Abstract

Details

Fuzzy Hybrid Computing in Construction Engineering and Management
Type: Book
ISBN: 978-1-78743-868-2