Article
Publication date: 29 April 2014

Gary D. Holt and Jack S. Goulding

The use of mixed-methods research (MMR) within building and construction research (BCR) is studied in detail. A new MMR paradigm, defined as ambiguous mixed-methods research…

1039

Abstract

Purpose

The use of mixed-methods research (MMR) within building and construction research (BCR) is studied in detail. A new MMR paradigm, defined as ambiguous mixed-methods research (AMMR), is conceptualised within a BCR context. The paper aims to discuss these issues.

Design/methodology/approach

Informal and inductive methodology combines experiential and anecdotal knowledge with synthesis of extant literature, to detail a cogent representation of the BCR research paradigm continuum. From this, the AMMR design is presented and its conceptualisation highlighted by reference to a small sample of published BCR studies.

Findings

Paradoxically, the BCR paradigm continuum is dichotomous in its quantitative and qualitative extremes; while between these, coalesced paradigms permeate it. Influenced predominantly by worldview, many BCR researchers select a methodology that aligns with either continuum extreme. But, the authors conceptualise, in practice this often relies on ambiguous AMMR characteristics.

Research limitations/implications

AMMR offers BCR research and beyond, a new approach for making, designing and defending methodological decisions.

Originality/value

The AMMR paradigm was designed by the authors and is therefore entirely novel.

Details

Journal of Engineering, Design and Technology, vol. 12 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 19 March 2018

Neema Kavishe, Ian Jefferson and Nicholas Chileshe

The purpose of this paper is twofold: first, to identify and rank the challenges influencing the delivery of the housing public-private partnership (HPPP) in Tanzania; and second…

1783

Abstract

Purpose

The purpose of this paper is twofold: first, to identify and rank the challenges influencing the delivery of the housing public-private partnership (HPPP) in Tanzania; and second, to suggest solutions in the form of a conceptual public-private partnership (PPP) framework model that will address the identified challenges and boost the chances of success.

Design/methodology/approach

Using a convergent parallel (concurrent) mixed method approach, data were collected from 28 stakeholders involved with HPPP projects in Tanzania using a hand-delivered and e-mail survey and 13 semi-structured interviews with public and private sector respondents. The quantitative data included subjecting the 19 challenges as identified from the literature to parametric tests such as one-sample t-tests and descriptive statistics tests such as measures of central tendencies and frequency analysis through Statistical Package for Social Sciences (SPSS 22.0). Qualitative data employed content analysis. The research was further underpinned by a number of theoretical perspectives such as Gidden’s structuration theory, contingency theory, relational and equity theory.

Findings

The top five ranked challenges influencing the delivery of HPPP were “inadequate PPP skills and knowledge”; “poor contracting and tendering documents”; “inadequate project management”; “inadequate legal framework”; and “misinformation on financial capacity of private partners”. The least six ranked and most significant challenges based on the one-sample (single) t-tests were as follows: “Poor risk allocation”; “inexperienced private partner”; “unequal qualification and contributions of expertise”; “poor enabling environment to attract competent partners”; “inadequate mechanisms for recovery of private investors’ capital”; and “high costs in procuring PPP projects”. The qualitative study further confirmed the challenges and cited the reason for the failure of joint venture projects as the lack of motivation for undertaking similar PPP projects. Despite the increased awareness of PPP projects and associated marginal benefits, the main impediment to the uptake and delivery of PPP housing projects remained the lack of skills and expertise.

Research limitations/implications

The proposed framework model is not yet tested, but since this paper is part of the ongoing research, the next stage involves the testing and validation of the model. Future studies could test the applicability of the proposed framework in other HPPP projects in Tanzania, and in other similar developing countries. Second, the validated framework can contribute towards addressing similar challenges as well as providing guidance. The proposed framework model is not yet tested, but since this paper is part of the ongoing research, the next stage involves the testing and validation of the model. Furthermore, recommendation for future research is to test the alignment of the identified challenges to the proposed remedial solutions across the five phases within the proposed PPP framework with a number of case studies.

Practical implications

The identified challenges were used to form the basis of the framework presented in this paper. Furthermore, these provide useful information, thus leading to increased awareness to enable successful delivery of HPPP in Tanzania. Similarly, both the government and policy makers could use the findings as the basis for re-examining the existing PPP policy and regulations, and reflecting on the existing situation with a view to improving the delivery of future HPPP projects.

Originality/value

The empirical study is among the first that identifies and ranks the challenges of PPP for housing projects delivery within the Tanzanian context. The identification of the challenges enabled their ranking, resulting in the mapping out of the most critical challenges. Furthermore, using the Gidden’s structuration theory, the study illustrates how institution mechanisms (structures) address these delivery challenges, thus influencing the implementation of HPPP in Tanzania, and how individual stakeholders (human agents or agency) are able to make choices (advocated solutions) in dealing with the challenges. More so, these constraints (challenges) as identified and viewed through the contingency and equity theoretical lenses form the foundation for developing the PPP conceptual framework. The proposed framework would thus serve as a mechanism for providing practical solutions as well as reducing the level of severity of the identified challenges.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 2
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 18 May 2015

Abimbola Olukemi Windapo and Jack Steven Goulding

The purpose of this paper is to examine green building legislation requirements and practices in the construction project execution stage within the context of the South African…

1258

Abstract

Purpose

The purpose of this paper is to examine green building legislation requirements and practices in the construction project execution stage within the context of the South African construction industry. The rationale for this examination rests with the perception that the implementation of green practices (per se) has been recognised as being “behind” the legislation enacted to control the design and construction of green buildings.

Design/methodology/approach

The research process consisted of a literature review to identify existing green building legislation and practices applicable to the project execution phase. This was supported by a sequential mixed-method research approach, which involved a survey of contracting companies based in the Western Cape Province of South Africa. Purposive sampling was used to undertake focused interviews with management staff and site operatives.

Findings

Research findings established a number of issues, not least: a gap between green building practices and legislation requirements; a high degree of unawareness of green building legislation/practices by construction company stakeholders; selective implementation of health and safety legislative requirements; that management staff had a more “positive” attitude to green building practices than site-based staff who tended to be less motivated and open to such practices.

Research limitations/implications

Results from this study are considered generalisable with the sample frame only. Research inference and projections should therefore only be made within this set, and not to the wider population of South African contractors (as this study was limited to the Western Cape Province).

Practical implications

Implications from this research are applicable to construction company stakeholders within the population set. Practical considerations include the need to acknowledge a formal commitment to developing a sustainable built environment – especially cognisant of the gap between practices on site and green building legislation requirements. Moreover, this lack of awareness in respect of green building practices and legislation requirements impinges upon several wider areas, not least: construction company stakeholders’ positioning, health and safety practices; managerial and operational staff perceptions, and stakeholders’ willingness and motivation to proactively address these gaps.

Social implications

Government bodies and allied professionals in charge of construction industry development are encouraged to consider the implementation of green building legislation requirements on construction sites. This reflection should encourage engagement through formative legislative provision and transparent awareness campaigns.

Originality/value

This work is original insofar as it directly addresses the alignment of legislation to current practices within the context of the South African construction industry. However, similar exercises have been undertaken on green building legislation in other countries such as USA, UK and Australia.

Details

Smart and Sustainable Built Environment, vol. 4 no. 1
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 18 July 2018

Hamdan Alzahrani, Mohammed Arif, Amit Kaushik, Jack Goulding and David Heesom

The impact of thermal comfort in educational buildings continues to be of major importance in both the design and construction phases. Given this, it is also equally important to…

Abstract

Purpose

The impact of thermal comfort in educational buildings continues to be of major importance in both the design and construction phases. Given this, it is also equally important to understand and appreciate the impact of design decisions on post-occupancy performance, particularly on staff and students. This study aims to present the effect of IEQ on teachers’ performance. This study would provide thermal environment requirements to BIM-led school refurbishment projects.

Design/methodology/approach

This paper presents a detailed investigation into the direct impact of thermal parameters (temperature, relative humidity and ventilation rates) on teacher performance. In doing so, the research methodological approach combines explicit mixed-methods using questionnaire surveys and physical measurements of thermal parameters to identify correlation and inference. This was conducted through a single case study using a technical college based in Saudi Arabia.

Findings

Findings from this work were used to develop a model using an artificial neural network (ANN) to establish causal relationships. Research findings indicate an optimal temperature range between 23 and 25°C, with a 65% relative humidity and 0.4 m/s ventilation rate. This ratio delivered optimum results for both comfort and performance.

Originality/value

This paper presents a unique investigation into the effect of thermal comfort on teacher performance in Saudi Arabia using ANN to conduct data analysis that produced indoor environmental quality optimal temperature and relative humidity range.

Details

International Journal of Building Pathology and Adaptation, vol. 39 no. 1
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 4 April 2016

Morteza Shokri-Ghasabeh and Nicholas Chileshe

The purpose of this study is to investigate and rank the critical factors influencing the bid/no bid criteria and their importance in the Australian construction industry.

1332

Abstract

Purpose

The purpose of this study is to investigate and rank the critical factors influencing the bid/no bid criteria and their importance in the Australian construction industry.

Design/methodology/approach

The research study has been undertaken by conducting an extensive literature review on bid/no bid decision-making criteria. As a result, the researchers identified 26 most common bid/no bid decision-making criteria that are accordingly grouped into five distinct categories, namely, “project”, “market”,“contractor”, “client” and “contract”. The literature review was followed by a national survey that was designed and utilised by the researchers to collect data for this purpose. The survey was sent to potential 450 Australian construction companies in various locations and responses were received from 81 Australian construction companies. Response data were subjected to descriptive and inferential statistics. Kruskal Wallis one-way analysis of variance (ANOVA) was applied to detect significant differences between the mean score grouped according to the organisation size (contract value).

Findings

The descriptive and empirical analysis demonstrated a disparity of ranking of the 26 bid/no bid criteria factors among the groups; however no statistically significant differences among the 26 bid/no criteria factors despite the absolute differences in the rankings and mean scores in the following four factors: (1) “bidding condition”, (2) “strength/weaknesses”, (3) “contract payment terms” and (4) “number of competitors/bidders”. Based on the overall sample, the highly ranked four factors were “client financial capability”, “project risk”, “project future benefits and profitability” and “number of competitors/bidders”. The following were the least ranked: “contractors’ financial situation”, “project duration” and “contractors’ material availability”. “Client financial capability”and “project risk” were jointly ranked as the most important by large, whereas “client financial capability” was also rated highly for smaller Australian construction contractors (ACCs). The medium ACCs had “project risk”as highly ranked.

Research limitations

The majority of the participants were small construction contractors in Australia. The reason is that the researchers were not aware of the contractors’ size prior to inviting them for participation in the research study. Second, the findings may not generalise to other industries or to organisations operating in other countries.

Practical implications

The identified “bid/no bid criteria” increase the awareness of existing decision-making practices and play a critical role in the future decisions of the construction companies, where decision makers need to evaluate the next opportunities encountered. Furthermore, knowledge and possession of these identified “bid/no bid” criteria would enable contractors to select a project with a higher probability of success in the future, which will accordingly result in long-term financial benefits and higher performance. Finally, the awareness of these factors could contribute to changing the contractor’s behaviours when bidding in a competitive environment or market conditions.

Originality/value

The study contributes to the body of knowledge on tendering and bidding practices among contractors in Australia, an area previously under explored. Second, this study provides some insights on the factors influencing the bid/no bid decisions among the ACCs.

Details

Construction Innovation, vol. 16 no. 2
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 19 September 2017

John P. Spillane and Lukumon O. Oyedele

The purpose of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation…

Abstract

Purpose

The purpose of this paper is to identify best practice relating to the effective management of materials in an urban, confined construction site, using structural equation modelling.

Design/methodology/approach

A literature review, case study analysis and questionnaire survey are used, with the results scrutinised using confirmatory factor analysis in the form of structural equation modelling.

Findings

The following are the leading strategies in the management of materials in a confined urban site environment: consult and review the project programme, effective communication and delivery, implement site safety management plans and proactive spatial monitoring and control.

Research limitations/implication

With the relentless expansion of urban centres and the increasing high cost of materials, any potential savings made on-site would translate into significant monetary concessions on completion of a project.

Originality/value

As on-site project management professionals successfully identify and implement the various strategies in the management of plant and materials on a confined urban site, successful resource management in this restrictive environment is attainable.

Details

Construction Innovation, vol. 17 no. 4
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 July 2015

Emiliya V. Suprun and Rodney A. Stewart

The aim of this study is to explore the current situation in the Russian construction industry and the obstacles, drivers and strategies that affect innovation implementation most…

1867

Abstract

Purpose

The aim of this study is to explore the current situation in the Russian construction industry and the obstacles, drivers and strategies that affect innovation implementation most significantly. The Russian construction industry is highly conservative and is often criticised for its lack of innovation. Construction firms invest relatively little in innovation adoption, development of new ideas and formal research and development.

Design/methodology/approach

This study utilised an extensive literature review followed by a questionnaire survey incorporating some post hoc interviews with 52 experts from the Russian architecture, engineering and construction industry to identify the most significant drivers, enablers, barriers and strategies related to innovation diffusion in construction.

Findings

Findings indicated that economic and financial difficulties, as well as inappropriate legislation, are the most significant barriers to innovation. Financial incentives, legislative improvements and the promotion of alternative construction procurement methods were viewed as the most critical strategies to improve the current lacklustre rate of innovation diffusion.

Originality/value

While there is anecdotal evidence that the Russian construction industry is lagging in terms of technological advancement, its closed nature means that there is still little reported evidence on what are the main barriers to innovation diffusion in this country. Hence, there is a lack of focus on innovation diffusion rates in different construction sectors, such as building and civil infrastructure and limited consideration on how effectively the research and development sector contributes to innovation.

Details

Construction Innovation, vol. 15 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 June 2017

Gary D. Holt and Jack S. Goulding

This paper aims to consider an “-ological” (ontological, epistemological and methodological) triad in the context of construction management (CM) research, and to explore the…

Abstract

Purpose

This paper aims to consider an “-ological” (ontological, epistemological and methodological) triad in the context of construction management (CM) research, and to explore the triad in terms of ontological/epistemological viewpoints, paradigmatic approaches to CM research and, ultimately, CM methodological decisions.

Design/methodology/approach

Derivation of critical narrative and graphical models using literature synthesis combined with experiential, methodological views of the authors.

Findings

Conceptions of ontology, epistemology and methodology (the “ological-triad”) demonstrate high variability – resultantly, their use in CM research is equally inconsistent, sometimes questionable and, in the extreme, sometimes overlooked. Accordingly, this study concludes that greater recognition of the “ological-triad” is called for in CM research, especially at the design stage. A framework for doing this is proffered.

Originality/value

Combined study of the “ologies” within CM research uniquely consolidates previous disparate knowledge into a single, cogent, subject-specific discourse that, inter-alia, both informs and illuminates CM research challenges. It also encourages critical debate on the issues highlighted.

Details

Journal of Engineering, Design and Technology, vol. 15 no. 03
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 30 November 2022

Hamdan Alzahrani, Mohammed Arif, Amit Kant Kaushik, Muhammad Qasim Rana and Hani M. Aburas

A building's Indoor Air Quality (IAQ) has a direct impact on the health and productivity on its occupants. Understanding the effects of IAQ in educational buildings is essential…

Abstract

Purpose

A building's Indoor Air Quality (IAQ) has a direct impact on the health and productivity on its occupants. Understanding the effects of IAQ in educational buildings is essential in both the design and construction phases for decision-makers. The purpose of this paper is to outline the impact air quality has on occupants' performance, especially teachers and students in educational settings.

Design/methodology/approach

This study aims to evaluate the effects of IAQ on teachers' performances and to deliver air quality requirements to building information modelling-led school projects. The methodology of the research approach used a quasi-experiment through questionnaire surveys and physical measurements of indoor air parameters to associate correlation and deduction. A technical college building in Saudi Arabia was used for the case study. The study developed an artificial neural network (ANN) model to define and predict relationships between teachers' performance and IAQ.

Findings

This paper contains a detailed investigation into the impact of IAQ via direct parameters (relative humidity, ventilation rates and carbon dioxide) on teacher performance. Research findings indicated an optimal relative humidity with 65%, ranging between 650 to 750 ppm of CO2, and 0.4 m/s ventilation rate. This ratio is considered optimum for both comfort and performance

Originality/value

This paper focuses on teacher performance in Saudi Arabia and used ANN to define and predict the relationship between performance and IAQ. There are few studies that focus on teacher performance in Saudi Arabia and very few that use ANN in data analysis.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 April 2018

Gary D. Holt

The purpose of this paper is to field a critical response to Kog and Yaman (2016) specifically; and more widely, to strengthen debate on contractor selection (CS) research.

Abstract

Purpose

The purpose of this paper is to field a critical response to Kog and Yaman (2016) specifically; and more widely, to strengthen debate on contractor selection (CS) research.

Design/methodology/approach

Critical narrative and opinion based on personal worldview, experiential knowledge and future insight/vision.

Findings

It is argued that enduring CS research has become somewhat stagnated. It has over-emphasised selection process models vis-à-vis the reliability and currency of their processing components, and has inadequately focused on achieving real-life impact.

Research limitations/implications

The principal implication is to engender constructive debate in the field and encourage a change of direction in CS research. The limitation is that this response reflects a personal view and so will be open to “challenge”.

Practical implications

Potential to encourage increased practicability, accessibility and generalisability of CS research products, leading to their increased real-life take-up and improved impact on practice.

Social implications

For society, the optimal implications would be improved project outcomes; healthier stakeholders’ financial interests; and an enhanced constructed environment.

Originality/value

The content is entirely original insofar as it comprises a personal viewpoint.

Details

Engineering, Construction and Architectural Management, vol. 25 no. 3
Type: Research Article
ISSN: 0969-9988

Keywords

1 – 10 of 12