Article
Publication date: 3 March 2023

Ebenezer Adaku, Victor Osei-Poku, Jemima Antwiwaa Ottou and Adwoa Yirenkyi-Fianko

The phenomenon of delayed payment to contractors, particularly in the construction industry, is a vital one and has implications for the health of economies of both developing and…

Abstract

Purpose

The phenomenon of delayed payment to contractors, particularly in the construction industry, is a vital one and has implications for the health of economies of both developing and developed countries. However, the knowledge of this phenomenon seems patchy and scattered. This paper aims to provide a comprehensive overview of the knowledge on the subject matter with directions for future research.

Design/methodology/approach

A systematic literature review coupled with a scientometric analysis was used to identify the main strands of delayed payment to contractor research as a basis for qualitative analysis and directions for future investigations.

Findings

Current trends of delayed payment to contractor research are categorised into five broad themes, namely: causes, effects, mitigation measures, ethical and law and regulatory issues. On the basis of these themes, directions for future research are proffered.

Originality/value

To the best of the authors knowledge, this is the first attempt at providing a comprehensive and an integrated knowledge on delayed payment to contractor research with pointers for further investigation and policy directions.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 25 March 2024

Lama Abu Alieh, M. Reza Hosseini, Igor Martek, Wei Wu and Mehrdad Arashpour

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction…

Abstract

Purpose

A lack of suitably qualified Building Information Modelling (BIM) professionals is understood to be a major barrier towards higher uptakes of BIM in the Australian construction industry. In response, Australian universities have tried to integrate the teaching of BIM into construction-related curricula, but with limited success. The acknowledged impediment is the lingering mismatch between what universities offer and what industry actually needs. However, the exact nature of that mismatch has yet to be identified. This study addresses that knowledge gap. It assesses both the current status of BIM competencies among university graduates and explores how BIM education at Australian universities may be improved to deliver BIM work readiness, as required by the industry.

Design/methodology/approach

This paper employed a qualitative research approach, utilizing 17 semi-structured interviews with experts in the Australian BIM industry. The Person-Organization (PO) fit theory, which emphasizes the congruence between individual and organizational characteristics, was utilized as a theoretical framework to examine the compatibility between “demand” and “ability” perspectives. The resulting data were analysed using this theoretical framework to gain insights into the PO fit perspectives in relation to BIM industry practices.

Findings

Findings reveal that graduates are generally competent regarding the use of BIM software. However, employers require much more than software skills, and expect recruits to have the capability to implement BIM as a process according to information management standards. Specifically, graduates are significantly deficient in matters of BIM protocols, collaboration and coordination, information workflows as well as completion and handover procedures.

Originality/value

This study is the first of its kind that bridges the gap between industry expectations and university education, in the Australian context, moving beyond the common discourse in education literature, which is exclusively focused on assessing students’ perceptions about BIM.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 February 2024

Murali Jagannathan, Vijayeta Malla, Venkata Santosh Kumar Delhi and Venkatesan Renganaidu

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid…

Abstract

Purpose

The dispute resolution process in the construction industry is known for delays in settlement, with some cases even escalating to complex arbitration and litigation. To avoid conflicts turning into disputes, the parties need to be proactive in identifying and resolving conflicts in their nascent stages. It is here that innovative lean construction practices can potentially act as a game-changer to avoid disputes, and this study aims to attempt to understand this phenomenon empirically.

Design/methodology/approach

A questionnaire-based empirical study, followed by semi-structured interviews, is conducted to understand the relevance of key tenets of lean principles in dispute avoidance.

Findings

Although stakeholders agree on the usefulness and practicality of lean principles in dispute avoidance, the extent of agreement is lesser when it comes to its implementation practicality. Moreover, there is a demographic influence observed on lean tenets such as “open communication”, “stakeholder collaboration” and “constraint identification”.

Practical implications

The results point towards an approach that combines contractual mandate, training and awareness creation to iron out the differences in the usefulness and practicality of lean approaches to avoid disputes.

Originality/value

Lean implementation is widely discussed in many construction contexts, such as sustainability, productivity improvement and planning. However, a discussion on lean philosophy’s role in dispute avoidance is muted. Therefore, this study assumes significance.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 9 February 2021

Liyaning Tang, Matt Stevens and Mary Hardie

The purpose of this paper is to investigate and measure stakeholder engagement and interorganisational relationships involved in the project design process.

Abstract

Purpose

The purpose of this paper is to investigate and measure stakeholder engagement and interorganisational relationships involved in the project design process.

Design/methodology/approach

A mixed-methods design, which combined action study, focus group meetings and a survey with project stakeholders who were employees in this project to express their comments on current design processes in different sub-projects.

Findings

The transformation of the design process in the selected project can be categorised into three distinct areas: (1) people, (2) practices and (3) internal infrastructure. These three categories were a straightforward way to review, analyse and discuss this transformation. The findings revealed the major goals of the improvement process as summarised are reliability, efficiency and quality. Recommendations and future study directions were suggested by the end of the paper.

Research limitations/implications

Although the project selected in this research was limited to Australia, the results could be interpreted on the design process in many other construction projects with similar size all over the world.

Practical implications

This research was very practical, with all data collected from the project in Australia. It summarised the difficulties met in the project and provided methods for stakeholders and industry practitioners to improve the effectiveness and efficiency of the design process.

Originality/value

This research provided lessons learnt on the design process from a “Giga” project and provided sustainable methods to facilitate future projects into flexible and effective communication among stakeholders.

Details

Built Environment Project and Asset Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 14 April 2023

Shenghua Yan and Weigong Chen

The core of the successful implementation of the integrated project delivery (IPD) mode is to establish a high-quality relationship of cooperation, trust and sharing among…

Abstract

Purpose

The core of the successful implementation of the integrated project delivery (IPD) mode is to establish a high-quality relationship of cooperation, trust and sharing among participants. This paper proposes recommendations to improve the relationship quality of participants from the owner's perspective. The results provide the theoretical basis and practical guidance for the popularization and application of the IPD mode.

Design/methodology/approach

This paper analyzes the dynamic relationship among participants in IPD mode based on supply chain theory and similarity theory. A tripartite game model of the owner, designer and the contractor is constructed to obtain the evolutionary equilibrium strategies under different parameter constraints. Then, numerical simulations under various scenarios are conducted to explore the dynamic evolution and the influencing factors of the relationship quality among the participant in the IPD mode.

Findings

The results show that (1) the relationship quality under certain conditions gradually improves as the project progresses until stable and high-quality cooperation is formed and (2) the owner's positive supervision cost, the distribution coefficient of incentive and punishment of participants and the scale of incentive pool are important factors influencing the relationship quality.

Originality/value

This study incorporates the following three innovations. First, analyzing the relationship quality among the participants of IPD mode based on supply chain theory. Second, the evolutionary game theory is applied to the relationship quality analysis. Third, conclusion innovation. The authors conclude that the relationship quality may progress, decrease or cycle with the progress of the project and targeted recommendations are presented based on the results.

Details

Kybernetes, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0368-492X

Keywords

Article
Publication date: 23 January 2024

Stefano Cosma and Daniela Pennetta

This work aims to explore the effects of (equity and non-equity) strategic alliances between banks and FinTechs on FinTechs' online visibility.

Abstract

Purpose

This work aims to explore the effects of (equity and non-equity) strategic alliances between banks and FinTechs on FinTechs' online visibility.

Design/methodology/approach

For a sample of 124 Italian FinTechs, the authors measured online visibility through their website ranking (Google PageRank) and website traffic (Google Trends). Consistent to the historical depth of these measures, the authors separately investigated the effect of equity and non-equity (contractual) agreements on online visibility by means of ordinal logistic regressions and diff-in-diff analysis.

Findings

Strategic alliances with banks enhance FinTechs' online visibility. Although both equity and contractual agreements positively influence the popularity of FinTechs' website achieved through the activity of internal and external online content creators (websites ranking), only equity agreements are effective in attracting Internet users (website traffic).

Practical implications

When deciding to interact with banks, FinTechs' managers should consider that equity agreements may be a powerful strategic choice for enlarging the customer base and boosting visibility of FinTechs.

Social implications

Fostering strategic alliances between banks and FinTechs contributes to FinTechs' growth, generating virtuous mechanisms of innovation, financial inclusion and better allocative efficiency of the financial system.

Originality/value

This work expands marketing knowledge and literature regarding online visibility determinants, by investigating the benefits of strategic alliances and cooperation in the market, while providing an empirical strategy replicable by future marketing studies.

Details

International Journal of Bank Marketing, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0265-2323

Keywords

Article
Publication date: 29 September 2023

S. Mahdi Hosseinian and Amirhomayoun Jaberi

Although outcome sharing in construction is a well-established concept in the literature, there is still an ongoing debate on the most effective approach for distributing project…

Abstract

Purpose

Although outcome sharing in construction is a well-established concept in the literature, there is still an ongoing debate on the most effective approach for distributing project outcomes between an owner and downstream contracting parties (DCPs). To address this issue, this paper aims to investigate an optimal framework for distributing project outcomes among various levels of subcontracting in construction projects. The framework includes contractors, subcontractors, sub-subcontractors and other related parties.

Design/methodology/approach

To formulate the optimization problem, the principal–agent model is utilized. The theoretical development is validated through an experiment conducted with employees from road construction companies.

Findings

When distributing outcomes among various levels of subcontracting, the sharing should be determined by their contribution to the outcome, effort costs, level of outcome uncertainty and risk preference.

Originality/value

This paper expands on the existing principal–agent theory by incorporating multiple levels of agents, transforming the conventional view of outcome sharing among downstream subcontracting levels into testable hypotheses and well-defined concepts. The paper has practical implications for industry practitioners seeking to effectively allocate benefits and costs throughout a project's subcontracting chain.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 31 October 2023

Hong Zhou, Binwei Gao, Shilong Tang, Bing Li and Shuyu Wang

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly…

Abstract

Purpose

The number of construction dispute cases has maintained a high growth trend in recent years. The effective exploration and management of construction contract risk can directly promote the overall performance of the project life cycle. The miss of clauses may result in a failure to match with standard contracts. If the contract, modified by the owner, omits key clauses, potential disputes may lead to contractors paying substantial compensation. Therefore, the identification of construction project contract missing clauses has heavily relied on the manual review technique, which is inefficient and highly restricted by personnel experience. The existing intelligent means only work for the contract query and storage. It is urgent to raise the level of intelligence for contract clause management. Therefore, this paper aims to propose an intelligent method to detect construction project contract missing clauses based on Natural Language Processing (NLP) and deep learning technology.

Design/methodology/approach

A complete classification scheme of contract clauses is designed based on NLP. First, construction contract texts are pre-processed and converted from unstructured natural language into structured digital vector form. Following the initial categorization, a multi-label classification of long text construction contract clauses is designed to preliminary identify whether the clause labels are missing. After the multi-label clause missing detection, the authors implement a clause similarity algorithm by creatively integrating the image detection thought, MatchPyramid model, with BERT to identify missing substantial content in the contract clauses.

Findings

1,322 construction project contracts were tested. Results showed that the accuracy of multi-label classification could reach 93%, the accuracy of similarity matching can reach 83%, and the recall rate and F1 mean of both can reach more than 0.7. The experimental results verify the feasibility of intelligently detecting contract risk through the NLP-based method to some extent.

Originality/value

NLP is adept at recognizing textual content and has shown promising results in some contract processing applications. However, the mostly used approaches of its utilization for risk detection in construction contract clauses predominantly are rule-based, which encounter challenges when handling intricate and lengthy engineering contracts. This paper introduces an NLP technique based on deep learning which reduces manual intervention and can autonomously identify and tag types of contractual deficiencies, aligning with the evolving complexities anticipated in future construction contracts. Moreover, this method achieves the recognition of extended contract clause texts. Ultimately, this approach boasts versatility; users simply need to adjust parameters such as segmentation based on language categories to detect omissions in contract clauses of diverse languages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 November 2023

Qiuwen Ma, Sai On Cheung and Shan Li

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in…

Abstract

Purpose

Integrated project delivery (IPD) project that does not use multiparty agreement is identified as IPD-ish. The use of IPD-ish arrangement by incorporating integration practices in conventional contract can be viewed as the part of the adoption process of IPD. Moreover, inappropriate integration practices invite new forms of risks and the absence of multiparty agreement adds to the challenges of risk management in IPD-ish projects. This study discusses such challenges and proposes the use of joint risk management to address the potential pitfalls in IPD-ish arrangement.

Design/methodology/approach

A mixed research method was applied. First, the criticality of IPD-ish general and integration-specific risks was examined through a survey. Second, a real IPD-ish project was used to exemplify the use of joint risk management (JRM) to manage IPD-ish risks.

Findings

Two types of risks, namely integration risks (IRs) and general risks (GRs), are identified in IPD-ish projects. Two major findings for the IRs: (1) the most critical IRs are related to unbalanced incentivization and inefficient multidisciplinary teams; and (2) only team formation related pre-contract JRM strategies affect IRs. As for the GRs, the most critical ones are associated with design issues and can be effectively mitigated by post-contract JRM.

Originality/value

Using IPD-ish arrangement is an inevitable part of implementation of full IPD. This happens as many change-averse owners would like to test the integration principles using a conventional contract that they are familiar with. In fact, success in IPD-ish would pave the path for further adoption of IPD. This study offers insight into categorization of risks in IPD-ish projects. Appropriate use of post-contract and organization related pre-contract JRM would improve the chance of teasing out the values of IPD through IPD-ish arrangements. Care should be taken to introduce some contracting integration initiatives, such as risk/reward sharing incentive.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 23 December 2022

Dan Wang, Jingyi Luo and Yongkun Wang

This paper constructs the uncertainty analysis model of prefabricated building supply chain risk. The model is designed to study the formation path of prefabricated building…

Abstract

Purpose

This paper constructs the uncertainty analysis model of prefabricated building supply chain risk. The model is designed to study the formation path of prefabricated building supply chain risk and is expected to be used by industry stakeholders for supply chain risk management.

Design/methodology/approach

Based on the uncertainty circle model, construct a configuration analysis framework for supply chain risks in prefabricated buildings. The fuzzy set qualitative comparative analysis (fsQCA) is used to study the configuration influence of five uncertain factors, including environment, plan-control, demand-supply, manufacturing and assembly-transportation, on the risk of the prefabricated building supply chain.

Findings

There are three paths to promote the high-risk generation of the prefabricated building supply chain: assembly-transportation-oriented, plan-control-oriented and manufacturing-oriented. There is a specific equivalent substitution relationship among the five causal conditions. Under specific conditions, different combinations of conditions have the same effect on promoting supply chain high-risk generation through equivalent substitution.

Originality/value

The multiple concurrent causal relationships of risk conditions in the assembly construction supply chain are studied under the grouping perspective, which helps to expand the research perspective of assembly construction supply chain risk and provides theoretical guidance for supply chain risk management of construction enterprises.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords