Search results

1 – 8 of 8
Article
Publication date: 6 June 2023

Oluwaseun Akindele, Saheed Ajayi, Adekunle S. Oyegoke, Hafiz A. Alaka and Temitope Omotayo

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of…

Abstract

Purpose

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of application in the construction industry, with no study that clarifies its knowledge strands. Hence, this systematic review analyses GIS core area of application, its system integration patterns, challenges and future directions in the construction industry.

Design/methodology/approach

A systematic review approach was employed, using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) checklist. A total of 60 articles published between 2011 and 2022 were identified, thoroughly reviewed and analysed using thematic analysis.

Findings

The analysis revealed spatial planning and design, construction-task tracking, defect detection and safety monitoring as its four main application-based areas. The findings showed that the adoption of GIS technology is rapidly expanding and being utilised more in building projects to visual-track construction activities. The review discovered an integrated pattern involving data flow from a device and window-form application to GIS, the pathways to data exchange between platforms to platforms, where ArcGIS is the most used software. Furthermore, the study highlighted the lack of interoperability between heterogeneous systems as the crux impediment to adopting GIS in the built environment.

Originality/value

The research provides a deep insight into possible areas where GIS is adopted in the construction industry, identifying areas of extensive and limited application coverage over a decade. Besides, it demystifies possible pathways for future integration opportunities of GIS with other emerging technologies within the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 10 April 2024

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

The lack of a proper register to store, match and display information on the adapted property has led to a waste of resources and prolonged delays in matching the disabled and…

Abstract

Purpose

The lack of a proper register to store, match and display information on the adapted property has led to a waste of resources and prolonged delays in matching the disabled and elderly people with appropriate properties. This paper presents the development of a Housing Adaptations Register with user-matching functionalities for different mobility categories. The developed system accurately captures and documents adapted home information to facilitate the automated matching of disabled/aged applicants needing an adapted home with suitable property using banding, mobility and suitability index.

Design/methodology/approach

A theoretical review was conducted to identify parameters and develop adaptations register construct. A survey questionnaire approach to rate the 111 parameters in the register as either moderate, desirable or essential before system development and application. The system development relied on DSS modelling to support data-driven decision-making based on the decision table method to represent property information for implementing the decision process. The system is validated through a workshop, four brainstorming sessions and three focus group exercises.

Findings

Development of a choice-based system that enables the housing officers or the Housing Adaptations Register coordinators to know the level of adaptation to properties and match properties quickly with the applicants based on their mobility status. The merits of the automated system include the development of a register to capture in real-time adapted home information to facilitate the automated matching of disabled/aged applicants. A “choice-based” system that can map and suggest a property that can easily be adapted and upgraded from one mobility band to the other.

Practical implications

The development of a housing adaptation register helps social housing landlords to have a real-time register to match, map and upgrade properties for the most vulnerable people in our society. It saves time and money for the housing associations and the local authorities through stable tenancy for adapted homes. Potentially, it will promote the independence of aged and disabled people and can reduce their dependence on social and healthcare services.

Originality/value

This system provides the local authorities with objective and practical tools that may be used to assess, score, prioritise and select qualified people for appropriate accommodation based on their needs and mobility status. It will provide a record of properties adapted with their features and ensure that matching and eligibility decisions are consistent and uniform.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 13 February 2024

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

Delay in housing adaptation is a major problem, especially in assessing if homes are suitable for the occupants and in determining if the occupants are qualified for the Disabled…

23

Abstract

Purpose

Delay in housing adaptation is a major problem, especially in assessing if homes are suitable for the occupants and in determining if the occupants are qualified for the Disabled Facilities Grant (DFG). This paper describes the development of two self-administered intelligent integrated assessment tools from the DFG Adapt-ABLE system: (1) The Home Suitability Assessment Platform, which is a preventive mechanism that allows assessment of the suitability of homes based on occupants’ mobility status and (2) an indicative assessment platform that determines if the applicants are qualified for the DFG to prevent lengthy delays.

Design/methodology/approach

The adopted method aligned with a development study approach: a grounded literature review, a severity measurement approach, two stakeholder engagement workshops, four brainstorming sessions and four focus group exercises. The system development relied on Entity–Relationship Diagram (ERD) technique for data structures and database systems design. It uses DFG context sensitivity with alignment with DFG guidance, interlinkages and interoperability between the assessment tools and other platforms of the integrated Adapt-ABLE system.

Findings

The assessment tools are client-level outcomes related to accessibility, usability and activity based on the assessment process. The home suitability platform shows the percentage of the suitability of a home with assessment results that suggest appropriate action plans based on individual mobility status. The indicative assessment combines the function of referral, allocation, assessment and test of resources into an integrated platform. This enables timely assessment, decision-making and case-escalation by Occupational Therapists based on needs criteria and the eligibility threshold.

Originality/value

These assessment tools are useful for understanding occupants’ perception of their physical housing environment in terms of accessibility, suitability and usability based on basic activities of daily living and their mobility status. The indicative self-assessment tool will substantially cut down the application journey. The developed tools have been recommended for use in the CSJ Disability Commission report and the UK government Guidance on DFGs for local authorities in England.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 13 July 2023

Adekunle Sabitu Oyegoke, Ben Williams Fisher, Saheed Ajayi, Temitope Seun Omotayo and Duga Ewuga

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate…

Abstract

Purpose

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate the disruptive effects on the supply chain. Covid-19 and Brexit disruption and their longevity effects in the short, medium and long term on the supply chain are relied upon to develop the framework.

Design/methodology/approach

The study adopted a mixed-method approach with a sequential explanatory design. The main disruptive factors were identified through a literature review, and key factors were selected through a focus group exercise. A questionnaire survey was carried out to sample opinions from the practitioners; 41 questionnaires were received and analysed using the relative importance index (RII) method for ranking the factors and percentage frequency distribution to determine the longevity effects. Five follow-up semi-structured interviews were conducted over the telephone and later transcribed.

Findings

The results of Covid-19 disruption indicate that material cost increase ranked first (RII: 0.863), logistics cost increase and supply chain interaction ranked second and third, respectively. They have long-term, medium-term and short-term longevity effects, respectively. The lowest-rated factors were communication (RII: 0.561), staff shortages (RII: 0.629) and impact on relationships (RII: 0.639). The three most ranked Brexit disruptive factors are supply chain interaction (RII: 0.775), material cost increase (RII: 0.766) and logistic and haulage delay (RII: 0.717). The first two factors have long-term effects, and the logistics and haulage delays have a medium-term impact. The mitigating solutions suggested in the framework are collaborative working, stronger resilience to external forces and better transparency and communication that will lead to good relationships among the supply chain members.

Research limitations/implications

The scope of the study was limited to the UK construction industry; however, the pandemic effect on supply chain can serve as critical learning curve in other developed and developing countries.

Practical implications

The study will help the government and construction firms to understand the focal areas of importance in solving the supply chain disruption problems based on the effects of Brexit and Covid-19. The research would be useful in ensuring the proactive involvement of the government and contracting firms in their preparedness for similar events in the future. The results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the supply chain disruptive factors affecting the small‐ and medium‐sized enterprises (SMEs) in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective framework comprising the highly ranked factors, their longevity effects and mitigating measures. This will help the SMEs manage future/similar external events affecting the supply chain.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 3 November 2021

Paul James Dunn, Adekunle Sabitu Oyegoke, Saheed Ajayi, Roshani Palliyaguru and Ganesh Devkar

The recent surge in light emitting diode (LED) lighting retrofitted into schools in the UK is as a result of the UK Government’s 2050 zero carbon pledge. However, the benefits and…

Abstract

Purpose

The recent surge in light emitting diode (LED) lighting retrofitted into schools in the UK is as a result of the UK Government’s 2050 zero carbon pledge. However, the benefits and consequences of LED retrofit projects for staff and enablers and stakeholder knowledge gaps about LED lighting retrofitting have not been fully explored. The aim of this research is to determine the amount of savings in cost, carbon reduction and kilowatt usage and to confirm if repayment from energy and cost savings derived from LED retrofit school projects funded through the SALIX funding option in the UK would be enough to service the loan. Thus, it examines monetary and non-monetary benefits, internal project stakeholder knowledge gaps and the consequences of LED retrofit for the staff and enablers of a large community college in the UK which is funded through the SALIX funding option.

Design/methodology/approach

The methodology relied on a hybrid research approach of a case secondary school through the review of literature, analysis of secondary data, focus group and questionnaire survey. The focus group consists of six key project stakeholders. The secondary data was sourced from the Project IGP [Individual Grade Proposal] and the Positive Energy Report from Zenergi, and the closed online questionnaire survey was used to sample 150 teaching staff and school enablers.

Findings

The findings show that stakeholders lack project knowledge, trust and expertise/project comprehension. This is in terms of baseline information, LED technology/management, payback modalities, management of risks and ethical issues around environmental impact. The forecasted SALIX savings were not achieved in real-time, partly because it does not take into consideration the increase in energy costs over the payback period. However, the LED retrofit creates efficiencies; drives down energy costs and energy usage; and drives carbon reduction, helping pupils’ learning, improving productivity and performance, and finally leading to a better lighting environment for the school community.

Originality/value

The study will help schools in the UK that intend to access SALIX finance for LED retrofits to understand the challenges and mitigate the risks. It will also help the government to understand the importance of adjusting the payback modalities to the base price when the retrofit was carried out for real-time savings to be made. The research would be useful in ensuring the proactive involvement of all the identified stakeholders in understanding the challenges and what the function entails.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 2 June 2023

Oluwaseun Enoch Akindele, Saheed Ajayi, Luqman Toriola-Coker, Adekunle Sabitu Oyegoke, Hafiz Alaka and Sambo Lyson Zulu

Amidst all solutions posited to address sustainable construction practices in Nigeria, the implementation plans are repudiated by sustainable barriers. This study examines and…

Abstract

Purpose

Amidst all solutions posited to address sustainable construction practices in Nigeria, the implementation plans are repudiated by sustainable barriers. This study examines and confirms the strategy with the most significant impacts on the identified barrier to sustainable construction practice (SCP).

Design/methodology/approach

The study deployed a questionnaire survey to evaluate the perspective of 100 construction actors on the barriers and strategies of sustainable construction practice in Nigeria. Factor Analysis was employed to categorize key barriers and strategies into their underlying clusters for further analysis. Partial least squares-structural equation modelling (PLS-SEM) was used to confirm the construct's significant relationship and magnitude, thereby establishing the strategies with the highest impacts on the barriers to sustainable construction practices.

Findings

The findings revealed three clusters of barriers and four groups of strategies to SCP, including technopolitic barrier, perception and awareness barrier and sociocultural barrier. For the significant strategies, education and training, stakeholder regulation, incentive support and government and legislative support strategies were established. Overall, education and training strategy was identified as the most dominant and effective strategy to mitigate the barriers of SCP in Nigeria.

Originality/value

The paper establishes education and training as the key strategy to achieving sustainable quest in the AEC industry. The practical implication is that policymakers, educators and professional bodies can harness sustainable knowledge transfer through education and training to improve sustainable construction practices in Nigeria.

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

Keywords

Abstract

Details

Built Environment Project and Asset Management, vol. 13 no. 4
Type: Research Article
ISSN: 2044-124X

Article
Publication date: 8 November 2021

Teslim Bamidele Balogun, Olukayode Olusola Awonuga and Rukaya Abowen-Dake

This study aims to investigate digital technology (DT) competencies, training and awareness amongst Black Asian Minority Ethnic (BAME) construction students in the UK.

Abstract

Purpose

This study aims to investigate digital technology (DT) competencies, training and awareness amongst Black Asian Minority Ethnic (BAME) construction students in the UK.

Design/methodology/approach

This study uses a quantitative online survey to investigate both BAME Construction Undergraduates Graduate Students (CUGS) and staff studying on and teaching on Construction programmes. The investigation examined their opinions as to their own awareness of their competencies and training regarding DT.

Findings

Findings indicate that BAME CUGS were mostly “very proficient” in the use of basic DT, such as required to complete an authentic assessment that typifies a real-life scenario. For example, sending and receiving emails, Excel, Word, computer literacy/basic IT skills, browsing searching materials, PowerPoint, specialist IT skills, mobile devices, tablet and social media handles. However, findings revealed that training awareness and competencies in new DT is shallow, and BAME CUGS are probably not ready for the digitalised construction world. Respondents were mainly within the “probably aware” range, and very few were within the “definitely aware” range, on the Likert scale adopted. New DTs that fell within the “definitely aware” range are BIM, offsite construction and manufacturing, 3D printing, cloud computing and collaboration.

Research limitations/implications

It is acknowledged that expanding the sample size to other universities and exploring BAME industry professionals’ narratives could further enrich the discussion. However, these limitations did not impact the robust practical and theoretical implications provided to CUGS, Higher Education (HE)sectors, University staff and industry emerging from the analysis and findings achieved in the study. Still, it is being recommended for future work to consider.

Originality/value

The study provides valuable recommendations helpful to HE institutions, industry and government. Recommendations provided include a need to review and update the current curriculum, robust partnership between academia and industry, increase government funding, upskilling and training staff in the new DT.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

1 – 8 of 8