Search results

1 – 10 of 24
Article
Publication date: 3 August 2021

Babatunde A. Salami, Saheed O. Ajayi and Adekunle S. Oyegoke

The outbreak of the Covid-19 pandemic has tested the resilience of the construction industry, putting the safety of workers and overall businesses at risk. This study aims to…

1231

Abstract

Purpose

The outbreak of the Covid-19 pandemic has tested the resilience of the construction industry, putting the safety of workers and overall businesses at risk. This study aims to explore the different strategies adopted by construction companies to protect the health and well-being of employees, security of the construction sites and projects, and keep the overall business operational amid the Covid-19 pandemic.

Design/methodology/approach

A preliminary study that involves field study and survey research was used to collect data for the study. The results from the preliminary analysis served as inputs for constructing the questionnaire, which was analyzed using descriptive statistics, exploratory factor analysis and reliability analysis.

Findings

The results reveal that the key underlying measures put in place by construction businesses include restricted site access, support bubbling of office and site staff, enhanced hygiene and social distancing protocol, contract risk identification and mitigation, self-isolation measures and heightened construction site safety. Along with a further discussion of the underlying measures, the top-rated strategies that were adopted by construction firms are also discussed in the paper.

Originality/value

As many construction companies remained opened handling essential projects amid the pandemic, the study presents the effective and efficient strategies that were used in plowing through the trying times. This study provides the opportunity for construction companies that escaped the early impacts of Covid-19 due to site closure and policymakers to learn from the strategies adopted by construction companies that were operational amid the pandemic.

Details

Journal of Engineering, Design and Technology , vol. 20 no. 1
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 6 June 2023

Oluwaseun Akindele, Saheed Ajayi, Adekunle S. Oyegoke, Hafiz A. Alaka and Temitope Omotayo

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of…

Abstract

Purpose

Notwithstanding the Geographical Information System (GIS) being a fast-emerging green area of a digital revolution, the available studies focus on different subject areas of application in the construction industry, with no study that clarifies its knowledge strands. Hence, this systematic review analyses GIS core area of application, its system integration patterns, challenges and future directions in the construction industry.

Design/methodology/approach

A systematic review approach was employed, using the Preferred Reporting Items for Systematic Reviews and Meta-Analyses (PRISMA) checklist. A total of 60 articles published between 2011 and 2022 were identified, thoroughly reviewed and analysed using thematic analysis.

Findings

The analysis revealed spatial planning and design, construction-task tracking, defect detection and safety monitoring as its four main application-based areas. The findings showed that the adoption of GIS technology is rapidly expanding and being utilised more in building projects to visual-track construction activities. The review discovered an integrated pattern involving data flow from a device and window-form application to GIS, the pathways to data exchange between platforms to platforms, where ArcGIS is the most used software. Furthermore, the study highlighted the lack of interoperability between heterogeneous systems as the crux impediment to adopting GIS in the built environment.

Originality/value

The research provides a deep insight into possible areas where GIS is adopted in the construction industry, identifying areas of extensive and limited application coverage over a decade. Besides, it demystifies possible pathways for future integration opportunities of GIS with other emerging technologies within the construction industry.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 19 June 2009

Adekunle S. Oyegoke, Michael Dickinson, Malik M.A. Khalfan, Peter McDermott and Steve Rowlinson

The purpose of this paper is to examine different categories of building project procurement routes based on organisational, contractual, financial and technical issues.

13222

Abstract

Purpose

The purpose of this paper is to examine different categories of building project procurement routes based on organisational, contractual, financial and technical issues.

Design/methodology/approach

The paper is based on review of literature and conditions of contracts. The UK construction industry serves as a general frame of reference. The Royal Institution of Chartered Surveyors survey of Contracts in Use from 1985 to 2004 is used to probe the share and value of contracts along different procurement routes and across different conditions of contracts in the UK. The logic is that the value and the share of contracts will indicate the behaviour of different procurement routes in the UK construction market while the in‐depth analysis of conditions of contracts will show the gaps and relationships between the general definition/categorisation and contractual context (conditions of contracts) of each of the procurement routes.

Findings

The preliminary result of the analysis shows that traditional routes remain the main type of procurement route for the construction project industry sector, within which different management and incentivisation systems are applied for greater efficiency. The conditions of contracts in the UK support this assertion by aligning different procurement routes to different conditions of contracts and additionally specifying different forms of agreements, special provisions and incentivisation in order to increase performance, reduce risks and improve compensation methods.

Research limitations/implications

The study can serve as a learning opportunity for construction project stakeholders internationally, and clients in particular, to differentiate between procurement routes, management‐oriented systems, relational contracting and incentivisation.

Originality/value

The research provides an original assessment of construction procurement which can be used as intervening tool in different levels of private and public procurement strategies.

Details

International Journal of Managing Projects in Business, vol. 2 no. 3
Type: Research Article
ISSN: 1753-8378

Keywords

Content available
Article
Publication date: 19 June 2009

Derek H.T. Walker

560

Abstract

Details

International Journal of Managing Projects in Business, vol. 2 no. 3
Type: Research Article
ISSN: 1753-8378

Article
Publication date: 10 April 2024

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

The lack of a proper register to store, match and display information on the adapted property has led to a waste of resources and prolonged delays in matching the disabled and…

Abstract

Purpose

The lack of a proper register to store, match and display information on the adapted property has led to a waste of resources and prolonged delays in matching the disabled and elderly people with appropriate properties. This paper presents the development of a Housing Adaptations Register with user-matching functionalities for different mobility categories. The developed system accurately captures and documents adapted home information to facilitate the automated matching of disabled/aged applicants needing an adapted home with suitable property using banding, mobility and suitability index.

Design/methodology/approach

A theoretical review was conducted to identify parameters and develop adaptations register construct. A survey questionnaire approach to rate the 111 parameters in the register as either moderate, desirable or essential before system development and application. The system development relied on DSS modelling to support data-driven decision-making based on the decision table method to represent property information for implementing the decision process. The system is validated through a workshop, four brainstorming sessions and three focus group exercises.

Findings

Development of a choice-based system that enables the housing officers or the Housing Adaptations Register coordinators to know the level of adaptation to properties and match properties quickly with the applicants based on their mobility status. The merits of the automated system include the development of a register to capture in real-time adapted home information to facilitate the automated matching of disabled/aged applicants. A “choice-based” system that can map and suggest a property that can easily be adapted and upgraded from one mobility band to the other.

Practical implications

The development of a housing adaptation register helps social housing landlords to have a real-time register to match, map and upgrade properties for the most vulnerable people in our society. It saves time and money for the housing associations and the local authorities through stable tenancy for adapted homes. Potentially, it will promote the independence of aged and disabled people and can reduce their dependence on social and healthcare services.

Originality/value

This system provides the local authorities with objective and practical tools that may be used to assess, score, prioritise and select qualified people for appropriate accommodation based on their needs and mobility status. It will provide a record of properties adapted with their features and ensure that matching and eligibility decisions are consistent and uniform.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 16 March 2022

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

The problem of long delay and waiting time in Disabled Facilities Grants (DFG) housing adaptation has been ongoing for years. This study aimed at constructing an innovative smart…

166

Abstract

Purpose

The problem of long delay and waiting time in Disabled Facilities Grants (DFG) housing adaptation has been ongoing for years. This study aimed at constructing an innovative smart solution to streamline the housing adaptation process to prevent lengthy delays for disabled and elderly people.

Design/methodology/approach

The Adapt-ABLE approach is suggested based on a constructive research approach, where extensive theoretical development of the Adapt-ABLE concept is developed. It consists of four integrated platforms that undergo theoretical and analogical development and validations through applicable theories, a workshop, four brainstorming sessions and a focus group.

Findings

The proposed Adapt-ABLE approach utilises process optimisation techniques through an IT system for streamlining the process. The merits of the semi-automated system include the development of a preventive measure that allows measurement of suitability index of homes for the occupants, indicative assessment that shorten the application duration, procurement and contracting platform that utilises principles based on framework agreement and call-off contract, and a platform that standardised performance management for continuous improvement.

Originality/value

The Adapt-ABLE solution will cut the application journey of non-qualified applicants and suggest where help can be sought. The qualified applicants' application journey will also be shortened through an online indicative assessment regime and early online resources (means) testing. Overall, the proposed system reduces the waiting time, and timely delivery improves the applicant's quality of life by living independently. It will potentially save the NHS billions of pounds used to replace hips and residential care costs due to lengthy delays in the housing adaptations process.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 13 February 2024

Adekunle Sabitu Oyegoke, Saheed Ajayi, Muhammad Azeem Abbas and Stephen Ogunlana

Delay in housing adaptation is a major problem, especially in assessing if homes are suitable for the occupants and in determining if the occupants are qualified for the Disabled…

23

Abstract

Purpose

Delay in housing adaptation is a major problem, especially in assessing if homes are suitable for the occupants and in determining if the occupants are qualified for the Disabled Facilities Grant (DFG). This paper describes the development of two self-administered intelligent integrated assessment tools from the DFG Adapt-ABLE system: (1) The Home Suitability Assessment Platform, which is a preventive mechanism that allows assessment of the suitability of homes based on occupants’ mobility status and (2) an indicative assessment platform that determines if the applicants are qualified for the DFG to prevent lengthy delays.

Design/methodology/approach

The adopted method aligned with a development study approach: a grounded literature review, a severity measurement approach, two stakeholder engagement workshops, four brainstorming sessions and four focus group exercises. The system development relied on Entity–Relationship Diagram (ERD) technique for data structures and database systems design. It uses DFG context sensitivity with alignment with DFG guidance, interlinkages and interoperability between the assessment tools and other platforms of the integrated Adapt-ABLE system.

Findings

The assessment tools are client-level outcomes related to accessibility, usability and activity based on the assessment process. The home suitability platform shows the percentage of the suitability of a home with assessment results that suggest appropriate action plans based on individual mobility status. The indicative assessment combines the function of referral, allocation, assessment and test of resources into an integrated platform. This enables timely assessment, decision-making and case-escalation by Occupational Therapists based on needs criteria and the eligibility threshold.

Originality/value

These assessment tools are useful for understanding occupants’ perception of their physical housing environment in terms of accessibility, suitability and usability based on basic activities of daily living and their mobility status. The indicative self-assessment tool will substantially cut down the application journey. The developed tools have been recommended for use in the CSJ Disability Commission report and the UK government Guidance on DFGs for local authorities in England.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 1 May 2001

ADEKUNLE SABITU OYEGOKE

This study provides a framework for comparing construction management contracts in the UK and the US construction practices. It starts by reviewing previous studies on UK and US…

1680

Abstract

This study provides a framework for comparing construction management contracts in the UK and the US construction practices. It starts by reviewing previous studies on UK and US contracting practices and explores the main delivery methods, inform of comparison with construction management contracting systems. It examines construction management contracting types, processes and procedures and interaction between the construction manager and other stakeholders. This study was based on a literature review and the result shows the similarities and differences between the American and British CM systems within each practice and between both practices; the distribution of responsibilities and risks both in pre‐construction and during the construction stages; and allocation of responsibility in both practices.

Details

Engineering, Construction and Architectural Management, vol. 8 no. 5/6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 13 July 2023

Adekunle Sabitu Oyegoke, Ben Williams Fisher, Saheed Ajayi, Temitope Seun Omotayo and Duga Ewuga

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate…

Abstract

Purpose

Supply chain disruptions have a significant impact on overall project delivery. This study aims to identify the supply chain disruptive factors and develop a framework to mitigate the disruptive effects on the supply chain. Covid-19 and Brexit disruption and their longevity effects in the short, medium and long term on the supply chain are relied upon to develop the framework.

Design/methodology/approach

The study adopted a mixed-method approach with a sequential explanatory design. The main disruptive factors were identified through a literature review, and key factors were selected through a focus group exercise. A questionnaire survey was carried out to sample opinions from the practitioners; 41 questionnaires were received and analysed using the relative importance index (RII) method for ranking the factors and percentage frequency distribution to determine the longevity effects. Five follow-up semi-structured interviews were conducted over the telephone and later transcribed.

Findings

The results of Covid-19 disruption indicate that material cost increase ranked first (RII: 0.863), logistics cost increase and supply chain interaction ranked second and third, respectively. They have long-term, medium-term and short-term longevity effects, respectively. The lowest-rated factors were communication (RII: 0.561), staff shortages (RII: 0.629) and impact on relationships (RII: 0.639). The three most ranked Brexit disruptive factors are supply chain interaction (RII: 0.775), material cost increase (RII: 0.766) and logistic and haulage delay (RII: 0.717). The first two factors have long-term effects, and the logistics and haulage delays have a medium-term impact. The mitigating solutions suggested in the framework are collaborative working, stronger resilience to external forces and better transparency and communication that will lead to good relationships among the supply chain members.

Research limitations/implications

The scope of the study was limited to the UK construction industry; however, the pandemic effect on supply chain can serve as critical learning curve in other developed and developing countries.

Practical implications

The study will help the government and construction firms to understand the focal areas of importance in solving the supply chain disruption problems based on the effects of Brexit and Covid-19. The research would be useful in ensuring the proactive involvement of the government and contracting firms in their preparedness for similar events in the future. The results could be interpreted for critical learning in other developed/developing countries.

Originality/value

Identifying and ranking the supply chain disruptive factors affecting the small‐ and medium‐sized enterprises (SMEs) in the UK construction industry has been the focal point of this study. The study also proposes a simple but effective framework comprising the highly ranked factors, their longevity effects and mitigating measures. This will help the SMEs manage future/similar external events affecting the supply chain.

Details

Journal of Financial Management of Property and Construction , vol. 29 no. 1
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 17 January 2022

Temidayo Akenroye, Jonathan D. Owens, Adekunle Sabitu Oyegoke, Jamal Elbaz, H.M. Belal and Fedwa Jebli

This study aims to examine the causes of small and medium-sized enterprises (SMEs) disinclination towards subcontracting in public sector markets. Previous studies have revealed…

Abstract

Purpose

This study aims to examine the causes of small and medium-sized enterprises (SMEs) disinclination towards subcontracting in public sector markets. Previous studies have revealed that UK SMEs are reluctant to do business with the public sector through the subcontracting route, but the reasons for this lack of enthusiasm have not been widely researched.

Design/methodology/approach

Drawing on semi-structured interviews with SMEs competing for public contracts in North West England, a qualitative study was performed, from which several themes emerged.

Findings

The findings were synthesised into a framework underpinned by attribution theory, to portray situationally and dispositionally caused factors that were used to interpret SMEs’ behaviour.

Social implications

The findings can guide policy development and government interventions in developed and developing countries, aimed at using public procurement as a policy tool to develop the small business sector.

Originality/value

This paper contributes in a unique way to an emerging discourse on how subcontracting can facilitate the access of SMEs to government procurement spending. It adds to knowledge regarding the explanatory power of attribution theory – from its base in social psychology.

Details

Journal of Public Procurement, vol. 22 no. 2
Type: Research Article
ISSN: 1535-0118

Keywords

1 – 10 of 24