Search results

1 – 9 of 9
Open Access
Book part
Publication date: 25 July 2022

Rachel Palmén and Maria Caprile

This chapter discusses the relevance of a community of practice (CoP) for a reflexive gender equality policy and reflects on the different approaches taken within TARGET. It is…

Abstract

This chapter discusses the relevance of a community of practice (CoP) for a reflexive gender equality policy and reflects on the different approaches taken within TARGET. It is based on the literature on CoPs and structural change as well as on experiences in transferring this approach to the context of implementing gender equality plans (GEPs) within different types of research organisations. While the notion of the CoP was coined in the 1990s, literature on gender and such communities remained scarce until a recent wealth of research looked at the role played by inter-institutional CoPs in advancing structural change in research organisations. In this chapter, we examine whether and how an institutional CoP approach has been a useful vehicle for gender equality plan development and how the different configurations of internal and external stakeholders within the CoPs have impacted GEP implementation.

Details

Overcoming the Challenge of Structural Change in Research Organisations – A Reflexive Approach to Gender Equality
Type: Book
ISBN: 978-1-80262-122-8

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The…

Abstract

The idea of implementing supply chain management (SCM) principles for the construction industry was embraced by construction stakeholders to enhance the sector's performance. The analysis from the literature revealed that the implementation of SCM in the construction industry enhances the industry's value in terms of cost-saving, time savings, material management, risk management and others. The construction supply chain (CSC) can be managed using the pull or push system. This chapter also discusses the origin and proliferation of SCM into the construction industry. The chapter revealed that the concept of SCM has passed through five different eras: the creation era, the use of ERP, globalisation stage, specialisation stage and electronic stage. The findings from the literature revealed that we are presently in the fourth industrial revolution (4IR) era. At this stage, the SCM witnesses the adoption of technologies and principles driven by the 4IR. This chapter also revealed that the practice of SCM in the construction industry is centred around integration, collaboration, communication and the structure of the supply chain (SC). The forms and challenges hindering the adoption of these practices were also discussed extensively in this chapter.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that…

Abstract

The model and existing practice of the construction supply chain (CSC) in the United Kingdom (UK) and Australia was presented in this chapter. The policies and reports that support the practice of the CSC were examined in both countries. It was discovered from the review of literature that the UK has a more detailed report targeted at improving the CSC than Australia. However, both countries have a common factor affecting their CSC which originates from fragmentation experienced within their supply chain. Construction stakeholders in the UK and Australia believe that collaboration and integration are vital components for improving performance. The majority of the contractors in both countries embrace collaborative working for the sole purpose of risk sharing, access to innovation and response to market efficiency. However, most of the models developed for managing the CSC in the UK are built around building information modelling (BIM). Also, the reviewed studies show that supply chain management practice will be effective following the following principle: shared objectives, trust, reduction in a blame culture, joint working, enhanced communication and information-sharing. Finally, the UK has a more established framework and more CSC models compared to Australia.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter presented the model for the effective practice of construction supply chain management (CSCM) in the fourth industrial revolution (4IR) era. The model was developed…

Abstract

This chapter presented the model for the effective practice of construction supply chain management (CSCM) in the fourth industrial revolution (4IR) era. The model was developed after discovering that the failure of adopting the 4IR component has hindered the synchronisation of construction supply chain (CSC) activities. While some stakeholders are willing to manage their CSC under the 4IR era, most have no clue how to go about it. Most stakeholders are familiar with an existing practice built around collaboration, integration, supply chain structure and trust. This chapter bridges the gap by introducing organisational culture and 4IR components for modelling the CSCM in the 4IR era. The model was backed and grounded with a robust theoretical framework. The theories include social identity theory, change theory and resource-based view theory. It was discovered that the organisational culture adopted by construction stakeholders determines their willingness to embrace the 4IR component for the management of CSC. The 4IR components were divided into smart management, virtualisation and cyber-physical systems. The chapter recommended that the practice of SCM in the Nigerian construction industry should be modelled around the six constructs that were used in developing the model for this study.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 12 February 2024

Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien

This first chapter provides a general overview of the book. The chapter describes workforce management and the lack of adequate attention to this concept within construction…

Abstract

This first chapter provides a general overview of the book. The chapter describes workforce management and the lack of adequate attention to this concept within construction organisations. In the fourth industrial revolution era, where emerging technologies have continued to change how business functions, the need for an effective approach towards managing the construction workforce becomes crucial. Having a construction workforce management practice model was deemed vital at this point, where technological advancement is rapidly changing the construction environment, and skill shortage is evident in the construction industry of most countries around the world. As such, this chapter establishes that the development of a construction workforce management model that will help improve the management of construction workers serves a critical value of the book.

Details

Construction Workforce Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-83797-019-3

Keywords

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter focused on presenting the result of the Delphi study from the questionnaire distributed to the experts. The Delphi technique was used for modelling the construction…

Abstract

This chapter focused on presenting the result of the Delphi study from the questionnaire distributed to the experts. The Delphi technique was used for modelling the construction supply chain management (CSCM) practice in the fourth industrial revolution (4IR) era. The technique was also used to predict the supply chain management's (SCM) possible trends in the construction industry. A total of 15 experts were selected for this study based on their working experience. The Delphi study also validated the gaps (organisational culture and 4IR component) identified from the existing CSCM model. The findings from the Delphi study revealed that organisational culture has a significant impact on the practice of CSCM in the 4IR era. Regarding adopting the 4IR component for the CSCM in Nigeria, the Delphi study revealed that smart management and virtualisation are the most adopted. Unfortunately, the cyber-physical system, the heartbeat of the 4IR, is yet to be fully implemented for CSCM practice in the Nigerian construction industry.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Book part
Publication date: 7 January 2015

Abstract

Details

Adoption of Anglo-American Models of Corporate Governance and Financial Reporting in China
Type: Book
ISBN: 978-1-78350-898-3

Book part
Publication date: 23 September 2022

Temidayo Oluwasola Osunsanmi, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala and Ayodeji Emmanuel Oke

This chapter aimed to uncover the gaps in the existing construction supply chain management (CSCM) models. Organisational culture and the fourth industrial revolution (4IR…

Abstract

This chapter aimed to uncover the gaps in the existing construction supply chain management (CSCM) models. Organisational culture and the fourth industrial revolution (4IR) components are the two gaps that were identified through reviewing existing CSCM models. The 4IR is driven by three components which are smart management, virtualisation and cyber-physical system. It was proposed in this chapter that the practice of CSCM should be in tandem with the components of 4IR. This chapter recommended that for the effective practice of the construction supply chain (CSC) in the 4IR era, construction stakeholders should adopt an innovative and collaborative organisational culture. The organisational culture adopted by a construction firm performs a crucial role in encouraging construction stakeholders in adopting 4IR components for CSCM. Each of the 4IR components is driven by technologies like autonomous robots, building information modelling (BIM), radio frequency identification (RFID), the internet of things (IoT) and others. Among all the technologies, it was discovered that RFID and BIM had gained prominence in most CSC literature. The chapter recommended that blockchain, digital twins and the cyber-physical system are the next trending technology for CSCM.

Details

Construction Supply Chain Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-80382-160-3

Keywords

Open Access
Book part
Publication date: 25 July 2022

Anastasia Zabaniotou, Aigli Tsirogianni, Monica Cardarilli and Massimo Guarascio

Gender competence as part of engineering education can better prepare men and women to work on sustainable solutions that benefit entire societies. This chapter describes the…

Abstract

Gender competence as part of engineering education can better prepare men and women to work on sustainable solutions that benefit entire societies. This chapter describes the framework and lessons learned of a community of practice (CoP) for gender equality facilitated by the Mediterranean Engineering Schools Network. Faculty and students from Mediterranean European, North African and Middle Eastern countries came together in this CoP, which was supported by the TARGET project, to develop a practical plan using a reflexive approach. The transfer of knowledge between generations is achieved by using participatory learning processes, facilitating mindful awareness, widening experiences, deepening understandings and building a gender-sensitive mindset. Students embarked on the journey to become change agents. The process led to the consolidation of gender equality knowledge, competence building and the development of change agents for gender equality. This CoP can inspire other institutions to undertake a participatory path towards gender equality – at local, regional, or global level.

Details

Overcoming the Challenge of Structural Change in Research Organisations – A Reflexive Approach to Gender Equality
Type: Book
ISBN: 978-1-80262-122-8

Keywords

1 – 9 of 9