Article
Publication date: 23 May 2018

Robert Osei-Kyei and Albert P.C. Chan

Since 1960, many public–private partnership (PPP) projects have been implemented in Hong Kong. Some projects have been considered as very successful, whereas others are seen as…

Abstract

Purpose

Since 1960, many public–private partnership (PPP) projects have been implemented in Hong Kong. Some projects have been considered as very successful, whereas others are seen as less successful. Unfortunately, these success outcomes have remained abstract because they are not in quantifiable terms. This paper aims to develop a model that can quantify the success outcome of PPP projects in Hong Kong.

Design/methodology/approach

Both quantitative and qualitative research approaches were adopted for the study. First, a questionnaire survey was conducted with PPP practitioners in Hong Kong, and thereafter, the fuzzy synthetic evaluation technique was used to develop a project success index for PPP projects in Hong Kong. The Hong Kong Cross-Harbour Tunnel project was used as a case study to demonstrate the applicability of the pragmatic model.

Findings

The success index model developed consists of four unrelated success criteria groupings: cost effectiveness, quality of services and technical specification, environmental impact and long-term partnership. Further, the computed success index for the Cross-Harbour Tunnel project is 4.06, which indicates that the tunnel project has been highly successful.

Originality/value

The outputs of this study will enable PPP practitioners in Hong Kong to reliably evaluate the success levels of their projects. In addition, local practitioners can now compare the success levels of two or more PPP projects on the same basis.

Details

Construction Innovation, vol. 18 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Book part
Publication date: 12 February 2024

Lerato Aghimien, Clinton Ohis Aigbavboa and Douglas Aghimien

The workforce management model conceptualised for the effective management of the construction workforce was subjected to expert scrutiny to determine the suitability and…

Abstract

The workforce management model conceptualised for the effective management of the construction workforce was subjected to expert scrutiny to determine the suitability and applicability of the identified practices and their attributed variables to the construction industry. In achieving this, a Delphi approach was adopted using experts from construction organisations in South Africa. These experts comprised workforce management personnel and construction professionals in senior management positions. The data were analysed using appropriate statistical tools such as interquartile deviation, Kendell’s coefficient of concordance, and chi square to determine consensus among these experts. After a two-round Delphi, the seven constructs proposed in the conceptualised workforce management model were adjudged to be important and worthy of adoption by construction organisations seeking to improve workforce management in the current fourth industrial revolution era.

Details

Construction Workforce Management in the Fourth Industrial Revolution Era
Type: Book
ISBN: 978-1-83797-019-3

Keywords

Article
Publication date: 8 June 2021

E.M.A.C. Ekanayake, Geoffrey Shen, Mohan Kumaraswamy and Emmanuel Kingsford Owusu

Demands for Industrialized Construction (IC) have intensified with growing construction industry imperatives to (A) boost performance; (B) reduce reliance on “in-situ and on-site”…

Abstract

Purpose

Demands for Industrialized Construction (IC) have intensified with growing construction industry imperatives to (A) boost performance; (B) reduce reliance on “in-situ and on-site” operations; and (C) strengthen supply chain resilience (SCR) not just for survival but also to fulfill obligations to clients in the coronavirus disease 2019–induced (COVID-19–induced) “new normal”. In addressing these imperatives, this paper targets more effective leveraging of latent efficiencies of off-site-manufacture, based on findings from a Hong Kong (HK)–based study on assessing and improving SCR in IC in a high-density city.

Design/methodology/approach

Starting with the identification of critical supply chain vulnerabilities (CSCVs), this study developed a multilevel–multicriteria mathematical model to evaluate the vulnerability levels of IC supply chains (SCs) in HK based on an in-depth questionnaire survey followed by experts' inputs and analyzing them using fuzzy synthetic evaluation (FSE).

Findings

The overall vulnerability index indicates that IC in HK is substantially vulnerable to disruptions, while production-based vulnerabilities have the highest impact. Top management attention is needed to address these CSCVs in IC in HK.

Originality/value

To the authors' knowledge, this is the first structured evaluation model that measures the vulnerability level of IC, providing useful insights to industry stakeholders for well-informed decision-making in achieving resilient, sustainable and performance-enhanced SCs.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 6
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 14 June 2019

Rotimi Boluwatife Abidoye, Albert P.C. Chan, Funmilayo Adenike Abidoye and Olalekan Shamsideen Oshodi

Booms and bubbles are inevitable in the real estate industry. Loss of profits, bankruptcy and economic slowdown are indicators of the adverse effects of fluctuations in property…

1372

Abstract

Purpose

Booms and bubbles are inevitable in the real estate industry. Loss of profits, bankruptcy and economic slowdown are indicators of the adverse effects of fluctuations in property prices. Models providing a reliable forecast of property prices are vital for mitigating the effects of these variations. Hence, this study aims to investigate the use of artificial intelligence (AI) for the prediction of property price index (PPI).

Design/methodology/approach

Information on the variables that influence property prices was collected from reliable sources in Hong Kong. The data were fitted to an autoregressive integrated moving average (ARIMA), artificial neural network (ANN) and support vector machine (SVM) models. Subsequently, the developed models were used to generate out-of-sample predictions of property prices.

Findings

Based on the prediction evaluation metrics, it was revealed that the ANN model outperformed the SVM and ARIMA models. It was also found that interest rate, unemployment rate and household size are the three most significant variables that could influence the prices of properties in the study area.

Practical implications

The findings of this study provide useful information to stakeholders for policy formation and strategies for real estate investments and sustained growth of the property market.

Originality/value

The application of the SVM model in the prediction of PPI in the study area is lacking. This study evaluates its performance in relation to ANN and ARIMA.

Details

International Journal of Housing Markets and Analysis, vol. 12 no. 6
Type: Research Article
ISSN: 1753-8270

Keywords

Article
Publication date: 2 October 2017

Robert Osei-Kyei, Albert P.C. Chan and Ernest Effah Ameyaw

The purpose of this paper is to identify the factor groupings of a set of 19 critical success factors (CSFs) associated with managing public-private partnership (PPP) projects at…

1658

Abstract

Purpose

The purpose of this paper is to identify the factor groupings of a set of 19 critical success factors (CSFs) associated with managing public-private partnership (PPP) projects at the operational stage and examine the most significant factor grouping using fuzzy synthetic evaluation (FSE) technique.

Design/methodology/approach

The paper adopted a comprehensive review of the pertinent literature and an empirical questionnaire survey geared towards targeted international PPP experts. Survey responses were analysed using factor analysis and FSE modelling.

Findings

The results from factor analysis show five CSF groupings (CSFGs) for managing operational PPPs. These are proficient service delivery and adequate legal structures, simplified payment mechanism and consistent project monitoring, effective contract variations management, suitable stakeholder management mechanism and environmental health and safety control. The FSE modelling shows that “simplified payment mechanism and consistent project monitoring”, is the most critical CSFG. The operational management CSFs under this grouping are acceptable level of user fee charges, efficient and well-structured payment mechanism, consistent project performance monitoring and long-term demand for public facility.

Research limitations/implications

The major limitation lies in the low sample size that was used for analysis; however the years of research and/or industrial experience of respondents and the wide coverage of different cultural backgrounds (18 countries from five regions globally) contribute to the authenticity of the survey responses. Future research should adopt interviews and case study analysis to unravel CSFs in managing operational PPPs.

Originality/value

The findings of this study are considerably beneficial to both public authorities and private operators. They inform practitioners of the strategic procedures and measures to employ in optimising the operational performance of PPP projects. Further, the methodology employed allows project management experts to reliably select the operational management CSFs for their projects.

Details

Benchmarking: An International Journal, vol. 24 no. 7
Type: Research Article
ISSN: 1463-5771

Keywords

Article
Publication date: 30 November 2020

Ammar Moohialdin, Fiona Lamari, Marc Miska and Bambang Trigunarsyah

Hot and humid climates (HHCs) are potential environmental hazards that directly affect construction workers' health and safety (HS) and negatively impact workers' productivity…

Abstract

Purpose

Hot and humid climates (HHCs) are potential environmental hazards that directly affect construction workers' health and safety (HS) and negatively impact workers' productivity. Extensive research efforts have addressed the effects of HHCs. However, these efforts have been inconsistent in their approach for selecting factors influencing workers in such conditions. There are also increasing concerns about the drop-off in research interest to follow through intrusive and non-real-time measurements. This review aims to identify the major research gaps in measurements applied in previous research with careful attention paid to the factors that influence the intrusiveness and selection of the applied data collection methods.

Design/methodology/approach

This research integrates a manual subjective discussion with a thematic analysis of Leximancer software and an elaborating chronological, geographical and methodological review that yielded 701 articles and 76 peer-reviewed most related articles.

Findings

The literature included the physiological parameters as influencing factors and useful indicators for HHC effects and identified site activity intensity as the most influencing work-related factor. In total, three main gaps were identified: (1) the role of substantial individual and work-related factors; (2) managerial interventions and the application of the right time against the right symptoms, sample size and measurement intervals and (3) applied methods of data collection; particularly, the intrusiveness of the utilised sensors.

Practical implications

The focus of researchers and practitioners should be in applying nonintrusive, innovative and real-time methods that can provide crew-level measurements. In particular, methods that can represent the actual effects of allocated tasks are aligned with real-time weather measurements, so proactive HHC-related preventions can be enforced on time.

Originality/value

This review contributes to the field of construction workers' safety in HHCs and enables researchers and practitioners to identify the most influential individual and work-related factors in HHCs. This review also proposes a framework for future research with suggestions to cover the highlighted research gaps and contributes to a critical research area in the construction industry.

Details

Engineering, Construction and Architectural Management, vol. 28 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2023

Mayowa I. Adegoriola, Joseph H.K. Lai, Esther H.K. Yung and Edwin H.W. Chan

The paper aims to identify the critical constraints that impede heritage building (HB) facility managers from discharging their duties effectively and develop an index model to…

Abstract

Purpose

The paper aims to identify the critical constraints that impede heritage building (HB) facility managers from discharging their duties effectively and develop an index model to guide HB maintenance management (HBMM) practitioners to the critical constraints.

Design/methodology/approach

A literature review was conducted to identify HBMM constraints. Facilty management practitioners assessed the constraints' significance through an online survey. The factor analysis was used to shortlist and group the constraints, and the constraint clusters were analyzed by the fuzzy synthetic evaluation technique. A significant index cluster to determine HBMM constraints criticality was generated using the linear additive model.

Findings

Embracing a total of 16 HBMM constraints, the three clusters identified are: (1) managerial and inadequacy constraints, (2) pressure and bureaucracy constraints and (3) HB peculiarities constraints. Based on the generated significant index, the HB peculiarities cluster was identified as the most significant.

Research limitations/implications

The study was conducted in a particular jurisdiction, limiting the generalizability of the result. Future research should address this limitation by covering more jurisdictions.

Practical implications

The significant index model (SIM) developed enables HBMM practitioners to objectively assess the criticality of HB constraints and facilitates them to effectively strategize and allocate resources for HBMM.

Originality/value

The SIM, which transforms subjective judgment into the objective assessment of the HBMM constraints' criticality, can assist practitioners, policymakers and other HBMM stakeholders in implementing strategies for the sustainability of HBs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 7 March 2016

Ernest Effah Ameyaw and Albert P.C. Chan

Public–private partnerships (PPPs) are viewed as a reform tool for resolving inefficiency and absence of dynamism in water supply delivery in developing countries. However, the…

2332

Abstract

Purpose

Public–private partnerships (PPPs) are viewed as a reform tool for resolving inefficiency and absence of dynamism in water supply delivery in developing countries. However, the requirements for their successful implementation have received very little attention. This paper aims to describe a set of critical success factors (CSFs) that, when given special and continual attention, would ensure a successful project implementation and to provide a predictive tool to aid implementers to evaluate the likelihood of a successful PPP water supply project.

Design/methodology/approach

Fourteen perceived CSFs were initially derived from project cases and extant literature, and verified through a two-round Delphi survey. Factor analysis established five critical success factor groups (CSFGs) that were then used to develop a fuzzy synthetic evaluation tool for assessing the chance of a successful project.

Findings

The five key CSFGs are commitment of partners, strength of consortium, asset quality and social support, political environment, and national PPP unit. The model output showed that, overall, these factors have a “very high” positive impact on a successful implementation of a water supply project. Hence, there is an excellent correlation between achievement of the CSFGs and project success. Success indices of individual principal factors are also “very high”.

Originality/value

The study presents a tool to public clients and private audience, and it is hoped that the study will trigger policy development towards PPP practice in developing countries, because these findings have wider implications for legal and regulatory systems, public capacity, financing, public procurement and politics.

Article
Publication date: 3 August 2021

Mershack Opoku Tetteh, Albert P.C. Chan, Amos Darko, Sitsofe Kwame Yevu, Emmanuel B. Boateng and Janet Mayowa Nwaogu

International construction joint ventures (ICJVs) are an effective strategy for construction companies worldwide for delivering large and complex projects. Despite numerous ICJVs…

Abstract

Purpose

International construction joint ventures (ICJVs) are an effective strategy for construction companies worldwide for delivering large and complex projects. Despite numerous ICJVs studies, there is a lack of comprehensive empirical examination of what drives ICJVs implementation. This study aims to investigate the key drivers for implementing ICJVs through an international survey.

Design/methodology/approach

Grounded on a comprehensive literature review and structured questionnaire survey, 123 ICJV experts' responses from 24 different countries/jurisdictions were analyzed using inferential and descriptive statistics. Mann–Whitney U test was used to determine any divergence of ranking of the drivers by the experts. Factor analysis (FA) was used to identify the clusters underlying the key drivers. Rank agreement analysis was later used to investigate the consensus between experts from developing and developed countries/jurisdictions on their ranking of the clusters.

Findings

Out of 34 factors, 26 factors greatly drive the implementation of ICJVs. Mann–Whitney U test results prove the absence of significant disparity among the experts in the ranking of the drivers. Six clusters were obtained through factor analysis (FA), namely, market-penetration and innovation-driven drivers, legal and market-driven drivers, fiscal incentives and market expansion drivers, personal branding drivers, sustainable advantage/power drivers and industrial and organizational promotion drivers. Rank agreement analysis exhibited varied levels of concurrence between professionals from developed and developing countries/jurisdictions.

Practical implications

The appreciation of the factors motivating ICJVs is beneficial to the successful implementation of ICJV strategies. A clear understanding of the drivers can help practitioners and policymakers to customize their ICJVs to reap the expected benefits.

Originality/value

The study has generated valuable insights into the factors that are greatly driving the implementation of ICJVs worldwide. While the findings of this study provide a profound contribution to theory and practice, it contributes to sustainable growth in different perspectives.

Details

Engineering, Construction and Architectural Management, vol. 29 no. 9
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 August 2021

Martin Evans, Peter Farrell, Emad Elbeltagi and Helen Dion

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International…

1119

Abstract

Purpose

The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations.

Design/methodology/approach

A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors.

Findings

The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present.

Originality/value

The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 3
Type: Research Article
ISSN: 1726-0531

Keywords