Article
Publication date: 29 February 2024

Wenque Liu, Albert P.C. Chan, Man Wai Chan, Amos Darko and Goodenough D. Oppong

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and…

Abstract

Purpose

The successful implementation of hospital projects (HPs) tends to confront sundry challenges in the planning and construction (P&C) phases due to their complexity and particularity. Employing key performance indicators (KPIs) facilitates the monitoring of HPs to advance their successful delivery. This study aims to comprehensively investigate the KPIs for hospital planning and construction (HPC).

Design/methodology/approach

The KPIs for HPC were identified through a systematic review. Then a comprehensive assessment of these KPIs was performed utilizing a meta-analysis method. In this process, basic statistical analysis, subgroup analysis, sensitive analysis and publication bias analysis were performed.

Findings

Results indicate that all 27 KPIs identified from the literature are significant for executing HPs in P&C phases. Also, some unconventional performance indicators are crucial for implementing HPs, such as “Project monitoring effectiveness” and “Industry innovation and synergy,” as their high significance is reflected in this study. Despite the fact that the findings of meta-analysis are more trustworthy than those of individual studies, a high heterogeneity still exists in the findings. It highlights the inherent uncertainty in the construction industry. Hence, this study applied subgroup analysis to explore the underlying factors causing the high level of heterogeneity and used sensitive analysis to assess the robustness of the findings.

Originality/value

There is no consensus among the prior studies on KPIs for HPC specifically and their degree of significance. Additionally, few reviews in this field have focused on the reliability of the results. This study comprehensively assesses the KPIs for HPC and explores the variability and robustness of the results, which provides a multi-dimensional perspective for practitioners and the research community to investigate the performance of HPs during the P&C stages.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 3 April 2023

Mayowa I. Adegoriola, Joseph H.K. Lai, Esther H.K. Yung and Edwin H.W. Chan

The paper aims to identify the critical constraints that impede heritage building (HB) facility managers from discharging their duties effectively and develop an index model to…

Abstract

Purpose

The paper aims to identify the critical constraints that impede heritage building (HB) facility managers from discharging their duties effectively and develop an index model to guide HB maintenance management (HBMM) practitioners to the critical constraints.

Design/methodology/approach

A literature review was conducted to identify HBMM constraints. Facilty management practitioners assessed the constraints' significance through an online survey. The factor analysis was used to shortlist and group the constraints, and the constraint clusters were analyzed by the fuzzy synthetic evaluation technique. A significant index cluster to determine HBMM constraints criticality was generated using the linear additive model.

Findings

Embracing a total of 16 HBMM constraints, the three clusters identified are: (1) managerial and inadequacy constraints, (2) pressure and bureaucracy constraints and (3) HB peculiarities constraints. Based on the generated significant index, the HB peculiarities cluster was identified as the most significant.

Research limitations/implications

The study was conducted in a particular jurisdiction, limiting the generalizability of the result. Future research should address this limitation by covering more jurisdictions.

Practical implications

The significant index model (SIM) developed enables HBMM practitioners to objectively assess the criticality of HB constraints and facilitates them to effectively strategize and allocate resources for HBMM.

Originality/value

The SIM, which transforms subjective judgment into the objective assessment of the HBMM constraints' criticality, can assist practitioners, policymakers and other HBMM stakeholders in implementing strategies for the sustainability of HBs.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 June 2023

Mershack Opoku Tetteh, Albert P.C. Chan, Amos Darko, Beliz Özorhon and Emmanuel Adinyira

International construction joint ventures (ICJVs) will fully realize their potential for success and effectively monitor performance when an adequate and suitable performance…

Abstract

Purpose

International construction joint ventures (ICJVs) will fully realize their potential for success and effectively monitor performance when an adequate and suitable performance benchmark is established. However, existing studies fall short of adequately providing a mutually acceptable benchmark for assessing the performance of ICJVs. This study aims to develop an adequate and suitable performance measurement framework for ICJVs.

Design/methodology/approach

A twofold structured questionnaire survey, supplemented by semi-structured interviews, was used to collect data from the practitioners of ICJVs hosted in the developing country of Ghana. The data were analyzed by using descriptive statistics, confirmatory factor analysis (CFA) and a hybrid-fuzzy logic approach.

Findings

A list of 30 performance indicators (PIs), defined by project performance, perceived satisfaction, company/partner performance, socio-environmental performance and performance of ICJV management, was validated and proved to be significant. Only 22 out of the 30 PIs, focusing on project efficiency, societal improvement and organizational goals are realized by the ICJV practitioners. Further, suitable determinants and viable quantitative ranges for measuring each PI are established to prevent different interpretations of the meanings of PIs and objectively express the level of success in quantitative terms. The results call for further investigation of the convergence between the practice of and research into some PIs (e.g. socio-environmental performance) and a range of different performance levels (PLs) in a more scientific manner.

Practical implications

This study not only advances the knowledge base and practice of performance measurement in ICJVs but could also assist stakeholders and decision-makers to assess, compare and monitor the performance of different ICJV projects on common grounds objectively.

Originality/value

This study not only comprehensively assessed PIs – what to measure – but also systematically determined suitable determinants – how to measure – for each PI.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 9 March 2023

Frederick Owusu Danso, Kofi Agyekum, Patrick Manu, Emmanuel Adinyira, Divine K. Ahadzie and Edward Badu

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences…

Abstract

Purpose

Although many health and safety (H&S) studies have widely examined safety risk perception in the construction industry, few studies have explored how this perception influences site workers' risk-taking behaviours during construction. This study aims to examine how construction site workers perceive and judge safety risks in risk-taking behaviours of site workers for intervention safety policy framework that may encourage safe work.

Design/methodology/approach

The study employed Pictorial-based Q-Methodology, which documented 63 picture scenarios of risk-taking behaviours from building sites and submitted them for validation from H&S inspectors. In total, 33 pictures emerged as having great potential to cause harm. After using these 33 pictures to elicit data from randomised site workers, the study used Frequency Tabulation, Relative Importance Index (RII) and Kruskal–Wallis Test to analyse the collected data. To fully explain the analysed data for deeper understanding, the study conducted Focus Group Discussions (FGDs) with these site workers to share the thoughts of site workers on these pictures.

Findings

Two distinctive pictures emerged from these analyses: one showing risk-taking behaviour likely to contract internal and skin disease and the other likely to fall from height. One of the implications is that construction site workers are unfamiliar with the dangerous contaminants in the materials the site workers use to work, which can potentially harm the site workers' skin and internal organs. Hence, site workers continue engaging in risk-taking behaviours. The other is that site workers are aware of and can mention catastrophic physical injuries attached to site workers' jobs. However, site workers continue engaging in risk-taking behaviours because of site workers' safety plights and rely on the favour and mercies of a supreme being as coping strategies to escape from these physical injuries.

Originality/value

This study is original in that the study uses picture scenarios of risk-taking behaviours to amass an empirical-based understanding of how site workers perceive and respond to H&S risks during construction. This piece of evidence is missing in the numerous research studies in this area. Again, the findings contribute to the state-of-the-art literature regarding risk-taking behaviours on construction sites.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 2 December 2022

Daniel W. M. Chan, Dher Abdul Hadi Sadeq, Aqeel Mohammed Fadhil, Matteo Cristofaro and Hadi Sarvari

Sustainable economic growth in both developed and developing countries requires the restructuring and expansion of road transportation infrastructures (RTIs). However, RTIs are…

Abstract

Purpose

Sustainable economic growth in both developed and developing countries requires the restructuring and expansion of road transportation infrastructures (RTIs). However, RTIs are always subject to high costs and delays, especially in developing countries with fewer resources than developed ones. Cost overruns and inaccurate forecasts usually lead to project failures. In this regard, some governments in developing countries have adopted public–private partnerships (PPPs) to deliver RTI projects with very positive outcomes. However, academic research has not yet studied the most recurring barriers and associated solutions to adopting PPPs in RTIs particularly for developing countries. This paper aims to fill up this knowledge gap in the existing literature.

Design/methodology/approach

A Delphi survey method involving 103 experts in RTIs based in Iran was implemented. Results indicated that the most perceived barriers to applying PPPs in RTIs in developing countries are linked to political, legal and economic factors. Ten other experts also participated in semistructured interviews, which were thematically analyzed to provide practical effective solutions for overcoming those identified barriers.

Findings

The findings indicated that all the presented barriers achieved above-average scores and could be considered severe obstacles of applying PPPs in RTIs for developing countries. In terms of barriers and solutions reported, these seem to converge on three profound elements: political stability, legal framework and conjoint management.

Originality/value

To the best of the authors’ knowledge, this is the first-ever research study regarding the barriers to adopting PPPs in delivering RTI projects for developing countries. Practical recommendations for overcoming these perceived barriers and achieving better implementation of PPPs in RTIs for developing countries were advocated. This work has contributed to the extant PPP theory as the management of coproduction in delivering RTI projects.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 25 August 2023

Yunfeng Liu, Xueqing Wang, Jingxiao Zhang and Sijia Guo

Early termination of public–private partnerships (PPPs) in China is caused by various risk factors, resulting in significant losses. This study aimed to clarify the key factors…

Abstract

Purpose

Early termination of public–private partnerships (PPPs) in China is caused by various risk factors, resulting in significant losses. This study aimed to clarify the key factors and identify the causal relationships among these factors.

Design/methodology/approach

Social network analysis (SNA) was used to analyze 37 risk factors that were summarized from 97 early terminated PPP cases and to identify the relationships among these key risk factors. Interpretive structural modeling (ISM) was conducted to explore the causal relationships. Data were collected from case documents, questionnaires and interviews.

Findings

A total of 17 key risk factors were identified and distributed in a hierarchical structure with six tiers. Among these key risk factors, the root causes affecting the early termination of PPP projects were government oversight in decision-making, local government transition, policy and law changes and force majeure. The direct cause was insufficient returns. Furthermore, local government and private sector defaults were essential mediating factors. Local government transition and the low willingness of the private sector were highlighted as potential key risks.

Research limitations/implications

The cases and experts were all from China, and outcomes in other countries or cultures may differ from those of this study. Therefore, further studies are required.

Practical implications

This research provides knowledge regarding the key risk factors leading to the early termination of PPP projects and guidance on avoiding these factors and blocking the factors' transmission in the project lifecycle.

Originality/value

This study contributes to the knowledge of risk management by emphasizing the importance of local government transition, the low willingness of the private sector and project cooperation and operation, whose significance is ignored in the existing literature. The proposed ISM clarifies the role of risk factors in causing early termination and explains their transmission patterns.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 19 October 2022

Prachi Vinod Ingle and Gangadhar Mahesh

The success of construction projects can be indicated by measuring their performance. For effective project performance (PP), the successful execution of a construction projects…

Abstract

Purpose

The success of construction projects can be indicated by measuring their performance. For effective project performance (PP), the successful execution of a construction projects is very important. A systematic review of the literature on performance areas and performance assessment models was undertaken. The purpose of this paper is to develop a mathematical formulation for construction PP areas to suit the Indian context by modifying the current project quarterback rating (PQR) model.

Design/methodology/approach

Based on the literature, the PQR model has not been validated for suitability in the Indian context. To validate the PQR model and modify the same for the Indian context, a survey instrument was used to collect data on performance areas and a multivariate data analysis technique was carried out to develop a modified model. Delphi technique was used to assign the weights for each performance metric in performance areas.

Findings

This study concluded the importance of three additional performance areas, namely, productivity, stakeholder satisfaction and environment for assessing PP for Indian construction projects. It also identified the interrelationship between the performance areas and the PP.

Practical implications

The developed modified PQR model (MPQR) will guide the concerned stakeholders to take corrective actions for improving the performance of construction projects.

Originality/value

The MPQR proposed in this paper covers ten areas and is a comprehensive single score that can be used to benchmark and compare performance over different projects to achieve continuous improvement.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Open Access
Article
Publication date: 31 October 2022

Johnson Adetooto, Abimbola Windapo, Francesco Pomponi, Fabio Companie, Kehinde Alade and Amanda Mtya

Sandbag building technologies (SBTs) have been offered as a cost-effective and sustainable alternative building technology (ABT) capable of accelerating house construction in…

1151

Abstract

Purpose

Sandbag building technologies (SBTs) have been offered as a cost-effective and sustainable alternative building technology (ABT) capable of accelerating house construction in South Africa, but its acceptance remains low. However, knowledge about how to effectively improve SBT social acceptance is limited. This study aims to develop and prioritise SBT social acceptability strategies towards providing a comprehensive framework for the successful deployment and widespread adoption of sandbag technology.

Design/methodology/approach

This study used a quantitative research strategy that included a literature review and a structured questionnaire survey of 228 ABT professionals and stakeholders in the South African housing industry. The study statistically analysed 13 strategies for the social acceptance of SBT.

Findings

The analysis showed that the top three strategies include the availability of sandbag demonstration projects in all provinces, the approval of a sandbag building code and the availability of standard design methods for earthbags. A factor analysis clustered the 13 strategies into Stakeholders integration and policy formation, Effective education and knowledge sharing and Grassroots advocacy and incentives.

Practical implications

The current study’s findings provide a broad framework for the effective implementation and wide acceptance of sandbag technology in housing projects. It offered certain best practices that policymakers and practitioners might use to promote ABT and SBT societal acceptability.

Originality/value

To the best of the authors’ knowledge, the study represents the first and only attempt to investigate the viewpoints of experts and housing market stakeholders in South Africa regarding sandbag technology social acceptance strategies and contributes to the social acceptance body of knowledge in ABT and SBT.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 15 February 2024

Chau Ngoc Dang, Warit Wipulanusat, Peem Nuaklong and Boonsap Witchayangkoon

In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green…

Abstract

Purpose

In developing countries, construction organizations are seeking to effectively implement green innovation strategies. Thus, this study aims to assess the importance of green innovation practices and develop a measurement model for quantifying the green innovation degrees of construction firms.

Design/methodology/approach

A mixed-methods research approach is adopted. First, an extensive literature review is performed to identify potential green innovation items, which are then used to design a preliminary questionnaire. Next, expert interviews are conducted to pilot-test this questionnaire. Subsequently, by using a convenience non-probability sampling method, 88 valid responses are collected from construction firms in Vietnam. Then, one-sample and independent-samples t tests are employed to assess the importance of green innovation practices. Fuzzy synthetic evaluation (FSE) is also applied to quantitatively compare such practices. Finally, green innovation level (GIL) is proposed to measure the green innovation indexes and validated by a case study of seven construction firms.

Findings

This study identifies 13 green innovation variables, of which several key practices are highlighted for small/medium and large construction firms. The results of FSE analysis indicate that green process innovation is the most vital green category in construction firms, followed by green product and management innovations, respectively. As a quantitative measure, GIL could allow construction firms to frequently evaluate their green innovation indexes, thereby promoting green innovation practices comprehensively. Hence, construction firms would significantly enhance green competitive advantages and increasingly contribute to green and sustainable construction developments.

Originality/value

This research is one of the first attempts to integrate various green innovation practices into a comprehensive formulation. The established indexes offer detailed green innovation evaluations, which could be considered as valuable references for construction practitioners. Furthermore, a reliable and practical tool (i.e. GIL) is proposed to measure the GILs of construction firms in developing countries.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 January 2024

Titus Ebenezer Kwofie, Michael Nii Addy, Daniel Yaw Addai Duah, Clinton Ohis Aigbavboa, Emmanuel Banahene Owusu and George Felix Olympio

As public–private partnerships (PPPs) have become preferred and veritable approach to deliver affordable housing, the seemingly lack of understanding of the significant factors…

Abstract

Purpose

As public–private partnerships (PPPs) have become preferred and veritable approach to deliver affordable housing, the seemingly lack of understanding of the significant factors that impact on success has become a notable setback. This study aims to delineate significant factors that can support decisions in affordable PPP public housing delivery.

Design/methodology/approach

Largely, a questionnaire survey was adopted to elicit insights from practitioners, policymakers and experts to develop an evaluative decision support model using an analytical hierarchy process and multi-attribute utility technique approach. Further, an expert illustration was conducted to evaluate and validate the results on the housing typologies.

Findings

The results revealed that energy efficiency and low-cost green building materials scored the highest weighting of all the criteria. Furthermore, multi-storey self-contained flats were found to be the most preferred housing typology and were significantly influenced by these factors. From the model evaluation, the scores on the factors of sustainability, affordability, cultural values and accountability were consistent across all typologies of housing whereas that of benchmarking, governance and transparency were varied.

Originality/value

The decision support factors captured varied dimensions of key factors that impact on affordable PPP housing that have not been considered in an integrated manner. These findings offer objective and systematic support to decision-making in affordable PPP housing delivery.