Article
Publication date: 24 April 2023

Minh Van Nguyen

This study aims to determine barriers to innovation and to develop a quantitative model for the barrier to innovation in Vietnamese construction organizations of different sizes.

Abstract

Purpose

This study aims to determine barriers to innovation and to develop a quantitative model for the barrier to innovation in Vietnamese construction organizations of different sizes.

Design/methodology/approach

A literature review and discussions with experienced practitioners were implemented to determine barriers to innovation in construction organizations. The rank-based non-parametric test analyzed collected data from a questionnaire survey to examine if there were significant differences between the three groups of organizations, including small, medium and large construction organizations. The fuzzy synthetic evaluation (FSE) technique was employed to develop barrier indexes (BIs) for organizations of different sizes in Vietnam.

Findings

The findings showed 17 barriers to innovation which were categorized into four groups, including organizational, human resources, economic and market barriers. Statistical analysis revealed significant differences regarding barriers to innovation between small, medium and large construction organizations in Vietnam. The post hoc test highlighted barriers to innovation differently separated into two groups: SMEs and large construction organizations. The FSE analysis integrated the identified barriers into the comprehensive BIs for SMEs and large construction organizations. The FSE analysis illustrated that the organizational barrier is the most critical barrier for SMEs. On the other hand, the market barrier received the most significant attention in large construction organizations.

Originality/value

This research is one of the first integrated barriers to innovation into a comprehensive formulation. The indexes provide the decision-makers with a practical and reliable tool to evaluate barriers to innovation in construction organizations of different sizes.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 21 December 2021

Liané van Wyk, Kahilu Kajimo-Shakantu and Akintayo Opawole

The South African construction industry appears to be lagging behind other industries in the country in terms of implementation and adoption of innovative technologies. Moreover…

906

Abstract

Purpose

The South African construction industry appears to be lagging behind other industries in the country in terms of implementation and adoption of innovative technologies. Moreover, sufficient empirical data on the adoption of innovative technologies, especially, in developing countries are not readily available. The aim of this study is therefore to assess the adoption and implementation of innovative technologies in the South African construction industry with a view to improving the industry's performance.

Design/methodology/approach

A survey was undertaken using a questionnaire, administered to construction professionals primarily in project management, quantity surveying and architectural firms.

Findings

The key findings show that there are some innovative technologies such as building information modelling, 3-dimensional mapping, drones, 3-dimensional printing and virtual reality that have been deployed. However, limited adoption of innovative technologies within the industry and low levels of knowledge of its benefits among the respondents were reported. This low implementation of innovative technologies was due to critical barriers such as high cost, limited knowledge, time requirement, fear of change, lack of interest, nature of construction processes and lack of team dynamics. Key drivers of innovation were found to include globalization and competition.

Practical implications

The current level of implementation of innovative technologies indicated that they are not yet optimized in the South African construction industry and suggests implications for change, adaptation and growth. The study recommends that firms should consider investing in research and development in order to exploit the potential of innovation for organizations and the industry at large.

Originality/value

The drivers and barriers indicated will help to prioritize the direction of adoption and growth which could help to improve the industry.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 28 June 2023

Nipuni Sumanarathna, Bismark Duodu, Shoeb Ahmed Memon and Steve Rowlinson

This study aims to explore the innovation deployment of construction contracting firms through exploratory–exploitative learning and organisational ambidexterity.

Abstract

Purpose

This study aims to explore the innovation deployment of construction contracting firms through exploratory–exploitative learning and organisational ambidexterity.

Design/methodology/approach

Firstly, a literature-based conceptual framework was developed to explain innovation implementation through exploratory–exploitative learning and organisational ambidexterity. A prominent Hong Kong construction contracting firm was then selected as the case study to explore its innovation deployment at different organisational levels (i.e. firm and project levels). Qualitative data were attained by conducting 12 semi-structured interviews with industry experts and document analysis. The thematic analysis using NVivo 12 software was adopted to analyse data.

Findings

Findings reveal that the case study firm successfully fosters innovation when ambidexterity is achieved through the balance between exploratory (i.e. radical innovation) and exploitative learnings (i.e. incremental innovation).

Research limitations/implications

Establishing uniform ambidexterity (i.e. 50:50) at the firm or project level is not mandatory to deploy innovation successfully. The ratio can vary based on the characteristics and requirements of construction firms.

Practical implications

This paper shall motivate construction practitioners to adopt radical–incremental innovation ambidexterity in firms and ultimately enhance the productivity and efficiency of the construction industry.

Originality/value

Previous construction innovation research has frequently explored firm or project-level innovation separately. This study identified a multi-level focus on innovation. Through the lens of exploratory–exploitative theory, different forms of innovation ambidexterity for different levels are suggested rather than one specific ambidexterity.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 12 April 2024

Kyudong Kim, Helena R. Tiedmann and Kasey M. Faust

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related…

Abstract

Purpose

The COVID-19 pandemic caused significant societal changes and altered how much of the construction industry operates. This study investigates the impacts of pandemic-related changes, how these changes may apply to different companies, and which changes should continue post-pandemic.

Design/methodology/approach

We aim to identify pandemic-driven changes that have affected the construction workplace and the advantages and challenges associated with them. We then make recommendations for what could and should endure through the pandemic and beyond, and under what circumstances. To achieve this objective, we conducted both qualitative and quantitative analyses of 40 semi-structured interviews with US-based construction professionals.

Findings

Identified through these interviews were 21 pandemic-driven changes across six categories: management and planning, technology, workforce, health and safety, supply chain, and contracts. This study noted both positive and negative impacts of the changes on cost, schedule, productivity, collaboration, employee retention, flexibility, quality, and risk mitigation. Participants indicated that some changes should remain after the pandemic and others (e.g. select safety measures, schedule adjustments) should be temporary.

Originality/value

By incorporating these lessons learned into recommendations, the findings of this study will help businesses identify and implement the most appropriate improvements for their organizations. The findings also provide policymakers with valuable insights on how to promote innovation in the construction industry and potentially enact more effective policies during crises to drive long-term improvements.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 11 April 2023

Tarek Salama and Hisham Said

The purpose of this paper is to determine if companies in the modular and offsite construction (MOC) industry are agile or not and its level of application for agility principles…

Abstract

Purpose

The purpose of this paper is to determine if companies in the modular and offsite construction (MOC) industry are agile or not and its level of application for agility principles, which allows for quick responses to the increasingly dynamic nature of industry environments.

Design/methodology/approach

This paper proposes an agility assessment framework for MOC that uses 48 assessment attributes organized into four categories: metrics, drivers, enablers and capabilities. A questionnaire approach was used to disseminate the framework globally in 19 countries and synthesize its relevance to the MOC industry. The questionnaire had 55 complete responses, majority of respondents work in managerial positions for MOC manufacturing facilities and onsite general contractors.

Findings

It was found that the lowest metric score for adapting to change was for cost since controlling cost would be difficult for any changes required after the design freeze stage. The top agility driver was found to be the need to respond to the wide variety of customer expectations, while the lowest driver was the existence of competing priorities. The top agility enabler was vendor partnership, which can be related to current postpandemic supply chain disruptions. Regarding technological capabilities, Europe and the USA acquired better scores compared to Asia, Latin America and Africa.

Originality/value

This study contributes to the MOC body of knowledge by creating an agility assessment tool for MOC firms to analyze their agile approach and environment, identifying the preliminary importance of agility assessment attributes and determining significant agile differences between the main MOC industry groups.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 7 April 2023

Rebeca Lambers, Fiona Lamari, Martin Skitmore and Darmicka Rajendra

Construction defects are one of the primary causes of deficient quality performance and constantly yield project cost and schedule overruns mostly because of rework. This study…

Abstract

Purpose

Construction defects are one of the primary causes of deficient quality performance and constantly yield project cost and schedule overruns mostly because of rework. This study aims to propose a new method for identifying a bespoke checklist of the most recurrent defects in residential construction work and their correlated causes as a basis for developing a framework for practical improvements in managing defect risks.

Design/methodology/approach

A literature review was first used to ground the defects within the existing theory and develop a new framework for ranking the key defects involved. This was demonstrated and tested by an analysis of Queensland Building Construction Commission (QBCC) archival data for 42,000 reported defects in new Queensland residential buildings. A questionnaire survey of 427 construction practitioners from 37 trades was then conducted to determine their causes.

Findings

The developed framework consists of preconditions for defective acts, defective supervision and organizational influences and is found to be suitable for analyzing the QBCC archives to rank the 20 most frequent defects. In the demonstration study, a questionnaire survey identified the highest frequency latent causes of defective acts to be workers taking shortcuts to complete tasks, workers’ lack of skill or knowledge level, challenges and limitations of technical constructability, and incorrect material supply; the failure to correct a known problem and poor supervision for defective supervision; and inadequate employee training, low managerial priority for quality and high time pressure and constraints for organizational influences.

Originality/value

The method is a new approach to identifying the key defects in residential construction work and their correlated causes for developing bespoke checklists as an aid to in managing defect risks.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 6 March 2023

Desalegn Girma Mengistu, Daniel Alemayehu Ashene and Handebo Ayele Halabo

The purpose of this study is to investigate the challenges and potential improvement mechanisms for the development of technology and innovation in the Ethiopian construction…

Abstract

Purpose

The purpose of this study is to investigate the challenges and potential improvement mechanisms for the development of technology and innovation in the Ethiopian construction industry.

Design/methodology/approach

In this study both quantitative and qualitative research approaches were adopted. While a structured questionnaire was used for the quantitative data collection, semi-structured interview was used for qualitative data collection. In analyzing the quantitative data, mean score was used to rank the variables and factor analysis was conducted to identify the underlying dimensions of the research constructs. The qualitative data was analyzed thematically focusing on specific objectives of the study; the challenges and improvement mechanisms of technology and innovation development.

Findings

The findings indicate that the major challenges are nature of the industry and lack of awareness, weak capacity of companies and the regulatory instruments, inadequate tender duration and poor monitoring and controlling practice. The suggested improvement mechanisms are effective coordination of the process and awareness creation, promoting technology and innovation in the procurement process and technology and innovation consideration in construction project registration.

Originality/value

Effectiveness of construction industry improvement programmes is affected by inappropriateness of the adopted implementation mechanisms. Understanding the operating environment; the enablers and potential barriers, is important for the success of any envisioned improvement programme. The improvement framework proposed by this study indicates the potential intervention areas and improvement mechanisms to effectively induce and enhance technology and innovation development in the construction industry. Major pillars of the improvement framework are improving regulatory framework, raising awareness and stakeholder engagement and continual monitoring and controlling of the practice.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531