Article
Publication date: 20 April 2022

Michael McCarney, Chris Ian Goodier and Alistair Gibb

This paper aims to identify and discuss how process and people factors influence the successful implementation of organisational interface management in offsite bathroom…

Abstract

Purpose

This paper aims to identify and discuss how process and people factors influence the successful implementation of organisational interface management in offsite bathroom construction.

Design/methodology/approach

A literature review identified 16 process and people factors. A mixed method approach was used to analyse data from eight offsite bathroom case study projects. A ranking approach determined the main process and people factors, consequently analysed using (Minitab) Frequency analysis, the Wilcoxon Signed Rank test and thematic analysis to establish the contributing sub-factors and their inter-relationships, to each other and to the literature. These factors and sub-factors formed the final conceptual model, bringing together interface management and offsite bathroom construction.

Findings

The nine factors instrumental to the conceptual model include six process factors: procurement, design management, supply chain management, health and safety, tolerance and quality and three people factors: communication, client/design team and project manager, reflecting the construction industry focus on hard processes over soft. The role of the project manager and communication, however, are the main factors which contribute to overall project success. Direct management of the offsite works by the contractor’s project manager is also highly significant.

Research limitations/implications

Limitations include the (UK) geographical focus of the research and the focus on bathroom pods in buildings.

Social implications

The research recognises three people (social) factors: communication, client/design team and project manager, with the first and third being the main factors which contribute to overall project success.

Originality/value

Originality stems from the focus on organisational interface management and how this relates to offsite bathroom construction (a practice gaining considerable momentum in industry) and the resultant model. Being grounded on more than one body of academic literature as well as 8 case studies and 82 industry interviews, there is value to both researchers and construction industry practitioners alike.

Details

Construction Innovation , vol. 23 no. 3
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 5 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Tianxin Li and Mengqi Yuan

Off-site construction (OSC) has been regarded as a clean and efficient production approach to help the construction industry towards sustainability. Different levels of OSC…

Abstract

Purpose

Off-site construction (OSC) has been regarded as a clean and efficient production approach to help the construction industry towards sustainability. Different levels of OSC technologies vary greatly in their implementations and adoptions. Compared to low OSC level technologies have been applied widely, the adoption of high OSC level technologies (HOSCLTs) in practice remains limited. The adoption mechanism for HOSCLTs by firms has not been clear, hindering their promotion. This study aims to explore the mechanism combining subjective and objective adoption for HOSCLTs.

Design/methodology/approach

This study developed an integrated model illustrating mechanism for HOSCLTs adoption based on the technology acceptance model (TAM), which has strong capacity to explain potential adopters' subjective intentions to adoption, and the task-technology fit (TTF) theory, which well describes the linkages between the task, technology and performance in technology adoption. The proposed model was then empirically evaluated through a survey of 232 practitioners in the Chinese OSC industry using partial least squares structural equation modeling.

Findings

The results indicate that both task characteristics (TAC) and technology characteristics (TEC) positively affect TTF of HOSCLTs. TAC, TTF, firm conditions and stakeholder influence have significant positive effects on perceived usefulness (PU), which further positively influence attitude towards adoption. TEC and firm conditions are significantly related to perceived ease of use (PEU). TTF, PEU and attitude towards adoption are good predictors of behavior intention to HOSCLTs adoption. PEU only significantly influences adoption intention and is not observed to influence attitudes and PU, unlike prior research on common OSC adoption.

Originality/value

This study contributes to the body of knowledge by exploring HOSCLTs adoption in the industry based on distinguishing the levels of OSC technologies and supplementing an integrated model for explaining the mechanism with the combination of subjective and objective adoption. The study also provides useful insights into understanding and promoting HOSCLTs adoption for policy makers and stakeholders actively involved in the OSC field.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 20 June 2023

Rehan Masood, Krishanu Roy, Vicente A. Gonzalez, James B.P. Lim and Abdur Rehman Nasir

Prefabricated construction has proven to be superior in terms of affordability and sustainability over the years. As a result of sustainable production, prefabricated…

191

Abstract

Purpose

Prefabricated construction has proven to be superior in terms of affordability and sustainability over the years. As a result of sustainable production, prefabricated housebuilding has evolved into a distinct industry reliant on supplier companies acting as supply chains (SCs) for housing projects. These companies' performance is critical to the successful implementation of prefabricated housebuilding technologies. However, in comparison to those choosing manufacturing as a strategy in other industries, the life span of these companies, providing innovative housing solutions, is relatively short. This is due to critical factors influencing the performance, but the inter-relationship of the performance dimensions is more significant. This study establishes the inter-relationship of the companies involved in house building with steel prefabricated housebuilding technologies.

Design/methodology/approach

The most recent factors were extracted from the literature. The relationships were developed using the interpretive structural modeling (ISM) method with the input from industry experts, and the driving factors were determined using the Matrice d'Impacts Croisés Multiplication Appliqués à un Classement (MICMAC) technique.

Findings

Critical performance factors were classified according to performance dimensions, ranked and classified based on driving and dependence power. The inter-relationships among the performance dimensions of time, quality, cost, delivery, features and innovation were determined. Key performance strategies were proposed for prefabricated housebuilding companies involved in manufacturing and/or assembly of steel products.

Originality/value

This study established the interrelationship of performance dimensions for prefabricated house building (PHB) companies to develop strategies against critical challenges to remain competitive in the housing market. Previous research had not looked into interrelationship among the performance dimensions. The proposed performance strategies are applicable to supplier organizations using steel prefabricated technologies in similar markets around the world.

Article
Publication date: 6 October 2023

Ali Katebi, Amirhossein Mohammadhosseini, Mohammad Najmeddin and Peyman Homami

The purpose of this study is to investigate the factors affecting the cost of concrete component prefabrication using the moderating role of organizational readiness…

Abstract

Purpose

The purpose of this study is to investigate the factors affecting the cost of concrete component prefabrication using the moderating role of organizational readiness, compatibility and competitive pressure.

Design/methodology/approach

The information collected in this study was obtained from 188 questionnaires filled out online by civil engineers active in the Iranian construction industry. Data analysis was performed by partial least squares structural equation modeling.

Findings

The results reveal that perceived risk has the greatest impact on cost of using precast concrete components (PCC). Furthermore, the organizational readiness, competitive pressure and compatibility variables have moderating role in the relationship between perceived risk and perceived usefulness. The results can help policymakers and managers to apply the appropriate perspective and strategy to promote this method by illustrating the factors affecting the cost of using PCC in the building construction.

Originality/value

Using the variables of perceived risk, perceived usefulness, and perceived ease of use to predict factors affecting the cost of using PCC is considered as an innovation in this research. In addition to identifying the most important factors affecting the cost of PCC prefabrication in the construction industry, this research tries to identify the impact of environmental factors on the model by examining the moderating role of organizational readiness, competitive pressure and compatibility.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Open Access
Article
Publication date: 11 August 2022

Krishna Chauhan, Antti Peltokorpi, Rita Lavikka and Olli Seppänen

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on…

2066

Abstract

Purpose

Prefabricated products are continually entering the building construction market; yet, the decision to use prefabricated products in a construction project is based mostly on personal preferences and the evaluation of direct costs. Researchers and practitioners have debated appropriate measurement systems for evaluating the impacts of prefabricated products and for comparing them with conventional on-site construction practices. The more advanced, cost–benefit approach to evaluating prefabricated products often inspires controversy because it may generate inaccurate results when converting non-monetary effects into costs. As prefabrication may affect multiple organisations and product subsystems, the method used to decide on production methods should consider multiple direct and indirect impacts, including nonmonetary ones. Thus, this study aims to develop a multi-criteria method to evaluate both the monetary and non-monetary impacts of prefabrication solutions to facilitate decision-making on whether to use prefabricated products.

Design/methodology/approach

Drawing upon a literature review, this research suggests a multi-criteria method that combines the choosing-by-advantage approach with a cost–benefit analysis. The method was presented for validation in focus group discussions and tested in a case involving a prefabricated bathroom.

Findings

The analysis indicates that the method helps a project’s stakeholders communicate about the relative merits of prefabrication and conventional construction while facilitating the final decision of whether to use prefabrication.

Originality/value

This research contributes a method of evaluating the monetary and non-monetary impacts of prefabricated products. The research underlines the need to evaluate the diverse benefits and sacrifices that stakeholder face when considering production methods in construction.

Article
Publication date: 21 November 2023

Tianyao Ping, Wei Pan and Zhiqian Zhang

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been…

Abstract

Purpose

Modular construction is an innovative method that enhances the performance of building construction projects. However, the performance of steel modular construction has not been systematically understood, and the existing measurement methods exhibit limitations in effectively addressing the features of steel modular building construction. Therefore, this study aims to develop a new performance measurement framework for systematically examining the performance of steel modular construction in building projects.

Design/methodology/approach

This study was conducted through a mixed-method research design that combines a comprehensive review of the state-of-the-art practices of construction performance measurement and a case study with a 17-story steel modular apartment building project in Hong Kong. The case project was measured with data collected from the project teams and other reliable channels, and the measurement practices and findings were referenced to establish a systematic performance measurement framework for steel modular construction.

Findings

Considering steel modular construction as a complex socio-technical system, a systematic performance measurement framework was developed, which considers the features of steel modular construction, focuses on the construction stage, incorporates the views of various stakeholders, integrates generic and specific key performance indicators and provides a benchmarking process. Multifaceted benefits of adopting steel modular construction were demonstrated with case study, including improved economic efficiency (e.g. nearly 10% cost savings), improved environmental friendliness (e.g. approximately 90% waste reduction) and enhanced social welfare (e.g. over 60% delivery trips reduction).

Originality/value

This paper extends the existing performance measurement methods with a new framework proposed and offers experience for future steel modular construction. The measured performance of the case project also contributes in-depth understanding on steel modular construction with benefits demonstrated. The study is expected to accelerate an effective uptake of steel modular construction in building projects.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 12 July 2022

Sushilawati Ismail, Carol K.H. Hon, Philip Crowther, Martin Skitmore and Fiona Lamari

Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been…

Abstract

Purpose

Malaysia’s industrialised building system (IBS) has been increasingly adopted for sustainable development by the country’s construction industry. However, although it has been used for commercial building projects, its application to sustainable infrastructure development has been limited to date. This study aims to examine the drivers and challenges involved.

Design/methodology/approach

A preliminary conceptual framework was initially developed based on a systematic literature review. Semi-structured interviews involving 20 participants were undertaken to gain insightful thoughts from the construction practitioners to discover the perception towards IBS application in the construction industry, the applicability of IBS, particularly in infrastructure projects, the strategies of IBS delivery and the sustainable potential of its application. A two-round Delphi study was conducted with 15 experienced and knowledgeable panellists to further identify, verify and prioritise factors developed from the literature review and interview findings. Then, the results were synthesised and triangulated to demonstrate a holistic insight.

Findings

The results show the main drivers to be better productivity, quality, environmental, safety and health, constructability design and cost, policy and requirements, with the main challenges being project planning and cost-related issues, inexperience and industry capacity.

Originality/value

The study’s main contribution is in systematically determining the practical implications involved in applying the IBS to sustainable infrastructure developments in Malaysia and other similar developing countries.

Details

Construction Innovation , vol. 23 no. 5
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 16 April 2024

Wei Chen, Zhuzhang Yang, Hang Yan and Ying Zhao

The construction industry is widely recognized as one of the most hazardous sectors in the world. Despite extensive research on safety management, a critical issue remains that…

Abstract

Purpose

The construction industry is widely recognized as one of the most hazardous sectors in the world. Despite extensive research on safety management, a critical issue remains that insufficient attention is devoted to safety practices in rural areas. Notably, accidents frequently occur during the construction of rural self-built houses (RSH) in China. Safety management tends to be overlooked due to the perceived simplicity of the construction process. Furthermore, it is essential to acknowledge that China currently lacks comprehensive laws and regulations governing safety management in RSH construction. This paper aims to analyze the behavior of key stakeholders (including households, workmen, rural village committee and the government) and propose recommendations to mitigate safety risks associated with RSH construction.

Design/methodology/approach

This paper applies evolutionary game theory to analyze the symbiotic evolution among households, workmen and rural village committee, in situations with or without government participation. Additionally, numerical simulation is utilized to examine the outcomes of various strategies implemented by the government.

Findings

Without government participation, households, workmen, and rural village committee tend to prioritize maximizing apparent benefits, often overlooking the potential safety risks. Numerical simulations reveal that while government involvement can guide these parties towards safer decisions, achieving the desired outcomes necessitates the adoption of reasonable and effective strategies. Thus, the government needs to offer targeted subsidies to these stakeholders.

Originality/value

Considering that during the construction phase, stakeholders are the main administrators accountable for safety management. However, there exists insufficient research examining the impact of stakeholder behavior on RSH construction safety. This study aims to analyze the behavior of stakeholders about how to reduce the safety risks in building RSH. Thus, the authors intend to contribute to knowledge in this area by establishing evolutionary game model. Firstly, this study carried out a theoretical by using tripartite evolutionary game to reveal the reasons for the high safety risk during building RSH. Practically, this research points out the important role of households, workmen and rural village committee in improving safety management in rural areas. Besides, some suggestions are proposed to the government about how to reduce construction safety risks in rural areas.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 24 January 2024

Mazen M. Omer, Tirivavi Moyo, Ahmad Rizal Alias and Rahimi A. Rahman

This study aims to develop workplace well-being indexes for construction sites of different project types (infrastructure, high-rise and low-rise). Accordingly, the study…

Abstract

Purpose

This study aims to develop workplace well-being indexes for construction sites of different project types (infrastructure, high-rise and low-rise). Accordingly, the study objectives are to identify the critical factors that affect workplace well-being at construction sites, compare the critical factors between different project types, categorize the critical factors into subgroups and compute indexes for the critical factors and subgroups.

Design/methodology/approach

Data from a systematic literature review and semi-structured interviews with construction industry professionals were used to extract 19 potential factors that affect workplace well-being. Then, a structured questionnaire survey was distributed, and 169 valid responses were collected. Finally, the data were analyzed using normalized mean analysis, agreement analysis, factor analysis and fuzzy synthetic evaluation.

Findings

The study findings revealed that there are 11, 11, 8 and 12 critical factors across overall infrastructure, high-rise and low-rise construction projects. Out of those, six critical factors are overlapping across project types, including “general safety and health monitoring,” “salary package,” “timeline of salary payment,” “working hours,” “communication between workers” and “planning of the project.” Accordingly, the critical factors can be categorized into two subgroups within each project type. Finally, the development of indexes shows that infrastructure construction projects have the greatest index compared to other project types.

Originality/value

This study contributes to filling the current knowledge gap by developing workplace well-being indexes at construction sites across different project types. The indexes would assist decision-makers in understanding the current state of workplace well-being. This increases the commitment and recognition of well-being across different construction project types.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 16 August 2022

Jin Cai, Zhongfu Li, Yudan Dou, Yue Teng and Mengqi Yuan

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship…

Abstract

Purpose

Contractor selection is critical in green buildings (GBs) since the preferred contractor has the responsibility to achieve construction sustainability as well as relationship sustainability. The developer satisfaction reflecting requirements can boost the cooperative relationship among stakeholders and act as an evaluation scale for the success of GB projects, which needs to be emphasized in the selection process but little involved in the existing research. This study explores improving GB contractor (GBC) selection by integrating developer satisfaction into selection procedures.

Design/methodology/approach

A systematic framework of GBC selection including twenty-five criteria from literature review and experts survey is firstly constructed. Both tactical and strategic criteria are further classified into Kano categories (must-be, one-dimensional, and attractive categories) using the fuzzy Kano model (FKM), and weighted by the developer satisfaction index. The model proposed by this study combining FKM and TOPSIS divides the selection process into the filtration phase and selection phase by Kano categories. The proposed model is finally verified through performance comparison among multiple methods in a case.

Findings

Selection criteria are measured linearly and nonlinearly, showing criteria having nonlinear satisfaction change accounts for two-thirds of all. Criteria at tactical level tend to be must-be or one-dimensional categories for the developer, and most strategic criteria are classed as the attractive category, indicating that adding strategic criteria is necessary for long-term cooperation. The proposed model, using developer satisfaction to improve the selection process, ensures the selected GBC to be the most satisfactory with requirements of the developer and makes the performance of GBCs easily distinguishable.

Originality/value

This study contributes to the existing body of knowledge for promoting relationship sustainability by supplementing an integrated model with emphasis on developer satisfaction in GBC selection, so as to establish a good initial foundation due to the match between performances of GBCs and needs of developers. It not only helps maximize developer satisfaction in GBC selection by applying satisfaction to pre-construction management, but also instructs GBCs to prioritize performance improvements. The framework is also conducive for developers to classify selection criteria and select other participants (like green suppliers) from the satisfaction perspective in GBs.

Details

Engineering, Construction and Architectural Management, vol. 30 no. 10