Publication date: 14 September 2015

Nebil Achour, Efthimia Pantzartzis, Federica Pascale and Andrew D. F. Price

This study aims to explore the challenges associated with the integration of resilience and sustainability, and propose a workable solution that ensures resilient and sustainable…

9173

Abstract

Purpose

This study aims to explore the challenges associated with the integration of resilience and sustainability, and propose a workable solution that ensures resilient and sustainable buildings. Recent research outcomes suggest that the number of natural hazards, both environmental and geophysical, will increase due to the effect of global warming. Various approaches have been investigated to reduce environmental degradation and to improve the physical resilience to natural hazards. However, most of these approaches are fragmented and when combined with cultural barriers, they often result into less-efficient assessment tools.

Design/methodology/approach

The primary source of information used to develop this paper has been research publications, policy papers, reports and tool guidelines. A set of questions were developed to guide the review which was complemented with information distilled from the HFA 2005-2015 to develop an integration process to evaluate 10 international sustainability appraisal tools.

Findings

The major finding of this research is that, from a technical point of view, resilience and sustainability could be integrated. However, it requires a long and thorough process with a multidisciplinary stakeholder team including technical, strategic, social and political parties. A combination of incentives and policies would support this process and help people work towards the integration. The Japanese model demonstrates a successful case in engaging stakeholders in the process which led to the development of a comprehensive appraisal tool, CASBEE®, where resilience and sustainability are integrated.

Practical implications

Although data have been sought through literature review (i.e. secondary data), the research is expected to have significant impact, as it provides a clear theoretical foundation and methods for those wishing to integrate resilience within current sustainability appraisal tools or develop new tools.

Social implications

This paper provides original concepts that are required to reduce fragmentation in the way resilience and sustainability are addressed. It sets up a new research agenda which has the potential to have a strong impact due the fact that sustainability and resilience are getting higher on the political priority scale.

Originality/value

This paper provides findings of an original idea to reduce fragmentation in the way resilience and sustainability are addressed. It sets up a new research agenda which has the potential to have a strong impact due the fact that sustainability and resilience are getting higher on the political priority scale.

Details

International Journal of Disaster Resilience in the Built Environment, vol. 6 no. 3
Type: Research Article
ISSN: 1759-5908

Keywords

Open Access
Book part
Publication date: 1 May 2019

Anne Klitgaard and Stefan Christoffer Gottlieb

The study aims to investigate the concept of strategy-as-practice in construction management literature has been investigated. The focus is on the link between strategizing…

Abstract

Purpose

The study aims to investigate the concept of strategy-as-practice in construction management literature has been investigated. The focus is on the link between strategizing practices and project management.

Design/Methodology/Approach

An exploratory literature review is carried out based on fifteen journal articles on strategizing practices in the construction industry.

Findings

The analysis shows how strategy-as-practice questions and contradicts project management practices as depicted in the dominant deterministic perspective. Strategy-as-practice has a focus on reacting and adapting to a chaotic and changing environment, while project management is concerned with creating and maintaining a stable working environment. The findings point to the necessity of considering the organizational and institutional context of project management practices, and hence the values the strategy-as-practice lens, when considering new avenues for improving the industry.

Research Limitations/Implications

As the study is based on an exploratory literature review of only 15 articles, generalizations should be made with caution. The identified literature is restricted by search words and choice of database.

Practical Implications

The differences between strategizing and project management practices are very clear, and a focus on both may offer insights into how the construction industry could improve its productivity by developing more robust management practices.

Originality/Value

The paper illustrates the benefit of applying a strategizing perspective, which hitherto has been under-investigated in construction management research.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 2 September 2021

Sharmin Khan, Mohammad Saquib and Anwar Hussain

Quality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The…

5919

Abstract

Purpose

Quality in the construction industry is an important issue yet ignored during the initial stages of the life cycle of a project, that is, the design and construction stage. The contribution of stakeholders, especially the architects is generally suspended though it has huge significance in terms of cost and time related to quality. This research endeavors to examine the issues related to the design and construction stages of the project from architects' purview, to understand the relative importance of these issues in the Indian construction industry.

Design/methodology/approach

The study of qualitative data conducted formed a basis for online quantitative data collection that was further analyzed with the help of cross-tabulation and multiple correspondence analysis methods.

Findings

The study concludes that the budget of a project is a corresponding factor related to quality concern for architects. The study also established that the quality issues corresponding to high budgets are closely related to the construction stage and are identified as preparation of checklist, and bidding process of hiring the contractor on the lowest bid.

Research limitations/implications

The study is limited to analyzing the perspective of architects; however, other stakeholders of the construction industry may represent a different opinion.

Practical implications

This research emphasizes the importance of the client's role, and need for integration and coordination among stakeholders in the construction industry for effective quality control and management.

Originality/value

The research presents an exhaustive literature review on quality issues and its importance with respect to cost implications, standard practices, sustainability and the life cycle of the project.

Details

Frontiers in Engineering and Built Environment, vol. 1 no. 2
Type: Research Article
ISSN: 2634-2499

Keywords

Open Access
Article
Publication date: 31 May 2022

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

2059

Abstract

Purpose

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

Design/methodology/approach

A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.

Findings

The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.

Originality/value

This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 8 July 2022

Joanna Dyczkowska, Joanna Krasodomska and Fiona Robertson

Stakeholder capitalism (SC) advocates that organisations should focus on creating long-term value for all key stakeholders rather than maximising short-term profits for…

2118

Abstract

Purpose

Stakeholder capitalism (SC) advocates that organisations should focus on creating long-term value for all key stakeholders rather than maximising short-term profits for shareholders. This paper aims to explore whether and how business organisations have applied stakeholder capitalism principles (SCPs) during the COVID-19 pandemic and how these efforts were communicated in integrated reports.

Design/methodology/approach

This study is based on the content analysis of the text extracted from the integrated reports of 22 companies categorised as excellent in the 2020 EY Excellence in Integrated Reporting Award 2020. The research material consisted of paragraphs that reflected how the company observed the SCPs in practice.

Findings

The stakeholder responsibility principle was the most represented by the examined companies, followed by the principles of continuous creation, stakeholder engagement and stakeholder cooperation. The COVID-19 pandemic has propelled the necessity of implementing innovative solutions to counteract the virus's spread. It has also spurred the need for two-way digitalised communication between the executives and stakeholders. The new situation also required collaborative approaches in the forms of partnerships, joint initiatives and programmes to ensure employee safety and help communities recover from the social and economic impacts of the pandemic.

Originality/value

This study links SC with integrated reporting (IR) and contributes to the literature by providing new insights into how SCPs have been applied during the COVID-19 pandemic. This discussion suggests that whereas these principles determine how the companies must act to satisfy stakeholders expectations, integrating reporting may help develop a report that is stakeholder-oriented and which responds to their information needs.

Details

Meditari Accountancy Research, vol. 30 no. 7
Type: Research Article
ISSN: 2049-372X

Keywords

Open Access
Article
Publication date: 31 May 2022

Kari-Pekka Tampio and Harri Haapasalo

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in…

1041

Abstract

Purpose

The purpose of this paper is to identify the areas and logic of integration of different stakeholders using different methods and to analyse their applicability and challenges in practical projects. The main aim is to describe how these different methods impact value creation.

Design/methodology/approach

Action design research was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the second author acted as an “outside researcher”. Two workshops were organised to evaluate the direct and indirect challenges and benefits of the applied four methods and to explain how different methods enable value creation.

Findings

All the studied methods provide good results in terms of usability and commitment to the aims of the project, thus delivering the direct benefits expected. Process, people and tools logic works well in this case project when applying the methods properly. Significant evidence was provided on secondary deliverables of the methods, and all analysed methods had a significant impact in the area of leading people, clarifying what “focus on people” means and how it is enabled.

Practical implications

Focus on people can be achieved through different operative methods if applied in the right way. It is necessary to select the most suitable methods based on all the direct and indirect deliverables.

Originality/value

This case project offered a platform to analyse integration methods in a real-life project using the collaborative contract method. The authors were able to participate in the analysis by taking action from the very beginning of the project in terms of training, learning, continuous development and coaching of these methods and evaluating the applicability.

Details

Construction Innovation , vol. 24 no. 7
Type: Research Article
ISSN: 1471-4175

Keywords

Open Access
Article
Publication date: 16 April 2018

Taryn Jane Bond-Barnard, Lizelle Fletcher and Herman Steyn

The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the…

38910

Abstract

Purpose

The purpose of this paper is to emphasise the importance of high levels of trust and collaboration for increasing the likelihood of project management (PM) success. However, the link between these three constructs remains unclear.

Design/methodology/approach

In this study, the authors use structural equation modelling (SEM) based on the findings from an international survey of 151 project practitioners to demonstrate the significance of project team trust and collaboration for increasing the likelihood of PM success.

Findings

The results indicate that PM success becomes more likely as the degree of collaboration improves which, in turn, is influenced by an increase in the level of trust between team members. The two factors of PM success are project performance and knowledge integration and innovation. The six factors of the degree of collaboration that were studied are physical proximity, commitment, conflict, coordination, relationships and incentives. The three factors of the level of trust investigated are expectations, knowledge exchange and imported trust.

Practical implications

The results of the study are expected to provide insight for project practitioners to increase the likelihood of PM success by taking cognisance of the factors that influence collaboration and trust. The results of the study may also provide insight into teaching and learning in tertiary education, in terms of professionalism and integrity issues.

Originality/value

This paper presents a new perspective for investigating PM success. SEM techniques are used to determine the likelihood of PM success by promoting trust and collaboration in the project team. This unique approach highlights the “human factors” that influence perceived PM success which should benefit both researchers and practitioners.

Details

International Journal of Managing Projects in Business, vol. 11 no. 2
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 21 July 2023

Kari-Pekka Tampio, Harri Haapasalo and Jere Lehtinen

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This…

1018

Abstract

Purpose

The research problem in this study is how a client (as a project owner) should organise early stakeholder involvement and integration in the front-end phase of a project. This study aims to create normative managerial statements as propositions from the client's perspective and to combine them into a set of activities enabling efficient organisation in the front-end phase of a hospital construction project.

Design/methodology/approach

Action design research (ADR) was carried out in a large hospital construction project where the first author acted as an “involved researcher” and the other authors acted as “outside researchers”.

Findings

The authors created seven normative managerial propositions that were verified by the case project stakeholders and developed a managerial framework describing the client's essential stakeholder involvement and integration activities in the front-end phase of a hospital construction project based on these propositions. The authors have also depicted the subphases of the front-end phase: value definition phase in the client permanent organisation, value proposition phase in the client Programme Management Office (PMO) and finally development phase in the alliance organisation ending on the final investment decision.

Practical implications

The collaborative contract delivery model enables the early involvement and integration of stakeholders. It has been somewhat surprising to note the extent to which collaborative contracts change the client role in the project front-end. The results offer practical activities for how clients can manage front-end activities in collaborative contracts.

Originality/value

The case project offered a platform to analyse how the collaborative contract delivery model changes the emphasis of activities in the front-end of a project. One of the key benefits of collaborative contracts is that development, design and delivery occur partially in parallel, thereby enabling contributions from production to be included in the design and development. The benefit of having a real-life case under study provides the possibility to triangulate and analyse rich data, however limited by the qualitative case method.

Details

International Journal of Managing Projects in Business, vol. 16 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 19 June 2019

Arif Budy Pratama and Satria Aji Imawan

The purpose of this paper is to develop and validate a scale for measuring perceived bureaucratic readiness for smart city initiatives.

6149

Abstract

Purpose

The purpose of this paper is to develop and validate a scale for measuring perceived bureaucratic readiness for smart city initiatives.

Design/methodology/approach

The present study employs a mixed method approach to achieve its research objectives. An exploratory study, consisting of literature review and qualitative interviews with key informants, was conducted to develop an initial instrument for measuring bureaucratic readiness. An online survey of 40 civil servants involved in smart city programmes in the Yogyakarta City government was then administered to test the instrument’s validity and reliability.

Findings

Perceived bureaucratic readiness can be measured through four dimensions: commitment of the upper echelons, legal support, information technology resources and governance.

Research limitations/implications

The proposed scale provides an alternative instrument for measuring perceived bureaucratic readiness for smart city initiatives. However, as data were only derived from one city government, they are relatively small in scope. Future research can be conducted for generalisation by replicating this study in other cities, thereby measuring its effectiveness in other contexts and settings.

Practical implications

This study not only provides a better understanding of bureaucratic readiness for smart city initiatives, but also proposes an assessment tool as a practical means of assessing bureaucratic readiness. The quantification of readiness is beneficial to putting smart city programmes into practice, as it allows smart city managers to assess the internal bureaucracy’s level of readiness. It also allows managers to mitigate and further policy agendas and thereby improve the bureaucracy’s support for smart city programmes.

Originality/value

Literature sometimes underestimates the role of bureaucracy in smart city implementation while overly stressing stakeholders, vendors and technology. This paper attempts to contribute to smart city research by reaching beyond the technological perspective and focusing on local government bureaucracy. None of the extant literature provides a scale for measuring bureaucratic readiness. The study thus proposes a systematic way to develop a means of measuring perceived bureaucratic readiness for smart city programmes.

Details

Public Administration and Policy, vol. 22 no. 1
Type: Research Article
ISSN: 1727-2645

Keywords

Open Access
Article
Publication date: 3 February 2023

Kesavan Manoharan, Pujitha Dissanayake, Chintha Pathirana, Dharsana Deegahawature and Renuka Silva

Labour efficiency is the key component for the long-term sustainability of construction firms. Recent studies show that modernising organisational/managerial processes is…

Abstract

Purpose

Labour efficiency is the key component for the long-term sustainability of construction firms. Recent studies show that modernising organisational/managerial processes is necessary to raise labour efficiency in many emerging nations. Construction supervision is a crucial element in organisational/managerial practices, which provide blood circulation to the project operations by directing labour. Accordingly, this study aims to quantify the impacts of crucial organisational/managerial elements on the efficiency of labour in building construction projects based on the viewpoint of construction supervisors.

Findings

A total of 28 factors were determined as critical, where lack of labour motivation, poor labour training facilities, poor performance evaluation practices, no labour rewarding mechanism and poor communication/cooperation between parties were judged to be the top five key issues in the list. The validity and reliability of the study findings were ensured through statistical tests and the experts' discussion outcomes. In view of the evolving challenges facing the industry, the results indicate that the organisational policies of construction enterprises in place addressing financial procedures, communication strategies, resource management and performance management practices must be enhanced.

Research limitations/implications

The study findings will make a substantial contribution to reducing the disparity between organisation/management policies and labour practices towards changing how the sector operates to increase labour efficiency in construction projects.

Originality/value

This study contributes to addressing the knowledge gap in the industry associated with the organisational protocols, especially to understand/predict how such elements are significant, how much they influence the efficiency of construction practices and what steps can be made to limit their effects on labour efficiency in construction. These could be crucial in modernising organisational policies and procedures for construction management.

Details

International Journal of Industrial Engineering and Operations Management, vol. 5 no. 1
Type: Research Article
ISSN: 2690-6090

Keywords