Article
Publication date: 7 February 2022

Bankole Osita Awuzie, Zwelinzima P. Mcwari, Progress Shingai Chigangacha, Clinton Ohis Aigbavboa, Theo C. Haupt and Lovelin Obi

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project…

Abstract

Purpose

An increase in outsourcing of consultancy services has been observed during procurement and delivery of public-sector infrastructure projects. However, the incidence of project failure has continued unabated despite this shift by public-sector entities. Also, there appears to be limited literature focussed on seeking to provide the rationale governing the decision to outsource or insource consultancy services by public-sector organisations. The purpose of this study was to appraise the performance of public-sector projects in which consultancy services have been outsourced or insourced. These are the gaps which this study was undertaken to fill.

Design/methodology/approach

A grounded theory methodology (GTM) research design was adopted based on the nature of evidence sought and gathered from a Provincial Department of Public Works and Infrastructure (PDPWI) in South Africa. Data was obtained from a mixture of semi-structured interviews and project-specific documents spanning a five-year period and was analysed according to the procedures associated with GTM. Accordingly, open coding, axial coding and pattern matching were carried out at several intervals to develop categories and themes.

Findings

The findings of the study showed the absence of a structured approach within the PDPWI for facilitating decisions pertaining to outsourcing or insourcing consultancy services within construction projects. Furthermore, the study established that both approaches yielded similar results across all performance facets of cost, time and quality. In addition, a detailed insight into the steps required for the successful application of GTM in built environment research has been provided in the study.

Originality/value

Limited studies have been undertaken to compare the impact of either outsourced or insourced services on the organisational and project performance. This was the gap to which the study reported in this paper was undertaken to contribute.

Details

Journal of Engineering, Design and Technology , vol. 22 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 11 May 2023

Norsafiah Norazman, Siti Nurul Asma’ Mohd Nashruddin and Adi Irfan Che-Ani

Urban population growth has increased housing density, which has expanded the construction of low-cost low-rise residential in urban areas. Good building performance and effective…

Abstract

Purpose

Urban population growth has increased housing density, which has expanded the construction of low-cost low-rise residential in urban areas. Good building performance and effective low-cost low-rise residential quality lead to higher user satisfaction and improve building sustainability. This study aims to focus on the factors influencing the sustainability of low-cost low-rise residential in the West Malaysia urban area to assess resident satisfaction.

Design/methodology/approach

A mixed-mode approach with both qualitative and quantitative were used in this study. Semi-structured interviews were conducted with 12 stakeholders to identify the common factors influencing sustainability in low-cost low-rise residential. Subsequently, questionnaire surveys were formed and distributed among building users to determine the satisfaction level with low-cost low-rise residential building performance.

Findings

The finding demonstrates that accessibility is the key factor to achieving sustainability of low-cost low-rise residential. The finding also related to the factor that influences both stakeholders and building user satisfaction levels. This study also identifies key areas that require attention to improve user satisfaction with building sustainability and building performance of low-cost low-rise residential.

Originality/value

This study aims to determine stakeholder and building user satisfaction levels in relation to the sustainable building factor. A few indicators have been set up to identify the factors that most influence the sustainability and environment of low-cost low-rise residential buildings. Each subchapter has a few recommendations to improve the performance of low-cost low-rise residential. Each of the factors mentioned is related to social, economic and environmental sustainability. In addition, the study discovered a strong connection between low-cost low-rise residential performance and user satisfaction.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 29 September 2023

Beatriz Campos Fialho, Ricardo Codinhoto and Márcio Minto Fabricio

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and…

Abstract

Purpose

Facilities management (FM) plays a key role in the performance of businesses to ensure the comfort of users and the sustainable use of natural resources over operation and maintenance. Nevertheless, reactive maintenance (RM) services are characterised by delays, waste and difficulties in prioritising services and identifying the root causes of failures; this is mostly caused by inefficient asset information and communication management. While linking building information modelling and the Internet of Things through a digital twin has demonstrated potential for improving FM practices, there is a lack of evidence regarding the process requirements involved in their implementation. This paper aims to address this challenge, as it is the first to statistically characterise RM services and processes to identify the most critical RM problems and scenarios for digital twin implementation. The statistical data analytics approach also constitutes a novel practical approach for a holistic analysis of RM occurrences.

Design/methodology/approach

The research strategy was based on multiple case studies, which adopted university campuses as objects for investigation. A detailed literature review of work to date and documental analysis assisted in generating data on the FM sector and RM services, where qualitative and statistical analyses were applied to approximately 300,000 individual work requests.

Findings

The work provides substantial evidence of a series of patterns across both cases that were not evidenced prior to this study: a concentration of requests within main campuses; a balanced distribution of requests per building, mechanical and electrical service categories; a predominance of low priority level services; a low rate of compliance in attending priority services; a cumulative impact on the overall picture of five problem subcategories (i.e. Building-Door, Mechanical-Plumbing, Electrical-Lighting, Mechanical-Heat/Cool/Ventilation and Electrical-Power); a predominance of problems in student accommodation facilities, circulations and offices; and a concentration of requests related to unlisted buildings. These new patterns form the basis for business cases where maintenance services and FM sectors can benefit from digital twins. It also provides a new methodological approach for assessing the impact of RM on businesses.

Practical implications

The findings provide new insights for owners and FM staff in determining the criticality of RM services, justifying investments and planning the digital transformation of services for a smarter provision.

Originality/value

This study represents a unique approach to FM and provides detailed evidence to identify novel RM patterns of critical service provision and activities within organisations for efficient digitalised data management over a building’s lifecycle.

Details

Facilities, vol. 42 no. 3/4
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 17 May 2023

Hong Kok Wang, Cheong Peng Au-Yong, Gabriel Hoh Teck Ling and Kian Aun Law

Under Malaysian Law, the maintenance and management of common property have traditionally been viewed as insoluble challenges in the self-organisational efforts for high-rise…

Abstract

Purpose

Under Malaysian Law, the maintenance and management of common property have traditionally been viewed as insoluble challenges in the self-organisational efforts for high-rise low-cost housing developments. As the population increases, more shared resources become heavily exploited with few willing to contribute towards the sustainability of resources. Many researchers argued a better way would be to convert these shared resources into a private or state-managed entity. Hence, with that assumption, this paper aims to examine how better physical characteristics can result in greater collective action.

Design/methodology/approach

This research paper adopted a quantitative method approach to determine how the standard of physical characteristics influenced the quality of collective action in high-rise low-cost housing. The method included a questionnaire survey of 519 parcel holders chosen via stratified purposeful random sampling from four high-rise low-cost housing areas.

Findings

The paper found a positive correlation between the quality of physical characteristics and the collective action gained. The findings highlighted that the standard of workmanship of high-rise low-cost units (including the common properties), the crime rate in the neighbourhood and the condition of lift systems – when improved – were significant positive predictors of collective action.

Practical implications

Housing developers should pay attention to the quality of both low-cost units and related common properties, as this endeavour will assist greatly in future collective action management.

Originality/value

The study was justified in terms of its originality as few research studies adopted the social-ecological system framework that focused on the correlation between the quality of physical characteristics and the collective action of parcel holders.

Details

Facilities , vol. 41 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Article
Publication date: 9 October 2023

Mohammad A. Hassanain, Mahmoud A. Zourob and Ahmed M. Ibrahim

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of…

Abstract

Purpose

This study aims to analyze the facilities managers’ involvement over the project life cycle phases (PLP), based on theoretical knowledge, consensus from empirical assessment of facilities managers and consultants’ practices.

Design/methodology/approach

A literature review was undertaken to determine the different tasks that facilities managers typically handle, identify project phases and their underlying activities in which facilities managers would be involved. This was followed by targeting a group of consultants to build a consensus, upon the identified involvement of facilities managers, over the PLP, while measuring the level of involvement from a representative group of facilities managers in Saudi Arabia. A matching between the perceptions and practice has been performed to serve as recommendations for future research on improving the practice in Saudi Arabia.

Findings

The involvement of facilities managers in the PLP is relatively low, according to the consultants’ perceptions. Consultants perceive that facilities managers should be involved in more professional activities, which would ultimately improve projects’ delivery to clients.

Practical implications

The involvement of facilities managers over the PLP ensures effective delivery of projects and reduces the multiplicity of challenges at the operation and maintenance phase. The viewing of facility managers’ involvement adds to the effectiveness of their role within the building industry.

Originality/value

This paper investigates the consultants’ perception of the involvement venues for facility managers to perform activities which are evaluated to be “mandatory,” “advantageous” or “not necessary.” The study reflects the state of facilities management practice, and the consensus of consultants toward the role of the facility managers through the PLP.

Details

Journal of Facilities Management , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 24 November 2023

Yongjian Ke, Zhe Cheng, Jingxiao Zhang and Yong Liu

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's…

Abstract

Purpose

Despite the widespread study and application of public-private partnerships (PPPs) since the 1980s, the field lacks a universally accepted definition that captures the concept's complexity. This study aims to offer a definition and foster a more substantive and comprehensive discourse on PPPs to improve communication and understanding between academics and practitioners from diverse disciplines and legislative backgrounds.

Design/methodology/approach

Grounded in the family-resemblance concept proposed by German philosopher Ludwig Wittgenstein, this study conducts a comprehensive literature review to identify core and non-core elements frequently cited in PPP descriptions. The authors used these findings to develop the PPP sunflower model as a structured framework for defining PPPs.

Findings

The analysis elucidates six core elements consistently present in PPP descriptions: clarity of roles and responsibilities, appropriate risk allocation and sharing, injection of expertise and resources, cooperation and teamwork, a bundle of services, and long-term contracts. Coupled with identified non-core elements, these core components comprise the PPP sunflower model, a structured framework for defining PPPs that accommodates their multi-faceted nature.

Originality/value

The PPP sunflower model distinguishes itself as a unique contribution to the PPP literature. It offers a rigorous theoretical framework that can elucidate the complexity of PPPs for various stakeholders. The model serves as a practical tool for evaluating the authenticity and viability of PPP projects. The study's novelty lies in its adoption of the family-resemblance concept, thereby providing a comprehensive, multi-dimensional framework that enhances the understanding of PPPs across different disciplines and legislative contexts.

Details

Built Environment Project and Asset Management, vol. 14 no. 1
Type: Research Article
ISSN: 2044-124X

Keywords

Article
Publication date: 10 November 2023

Bamidele Temitope Arijeloye

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of…

Abstract

Purpose

This paper aims to help understand how adopting risk allocation criteria impacts the delivery of public–private partnership (PPP) mass housing in Nigeria with the view of promoting the adoption of PPP housing scheme in Nigeria.

Design/methodology/approach

The research design adopts the census sampling approach by using well-structured questionnaires distributed to stakeholders involved in PPP-procured mass housing projects, i.e. consultants, in-house professionals, contractors and the organized private sector, registered with PPP departments in the Federal Capital Territory Development Authority, Abuja, Nigeria. Sixty-three risk factors, nine risk allocation criteria and nine project delivery indices were submitted for the respondents to rank on a Likert scale of 7. Two hypotheses were formulated to test whether the risk allocation criteria impacted PPP mass housing delivery or otherwise. The study adopts partial least square-structural equation modeling to model the effect of risk on risk allocation criteria on project delivery indices and risk severity.

Findings

The finding shows that project risk allocation criteria have less effect on project delivery indices than on risk severity. The study concludes that risk allocation principles do not directly affect the delivery of PPP-procured mass housing projects. This is evident by the path coefficient of 0.724 values, which is not statistically significant at a 5% alpha protection value. The study concludes that allocating critical risk factors influences the performance of PPP-procured mass housing projects, as the path coefficient of 0.360 is also not significantly far from 0 and at a 5% alpha protection value.

Originality/value

The study is one of the recent studies conducted in PPP-procured mass housing projects in Nigeria owing to the novelty of procurement option in the sector. It highlights the risk factors that can jeopardize the PPP-procured mass housing project objectives. The study is of immense value to PPP actors in the sector by providing the necessary information required to formulate risk response methods to minimize the impact of the risk factors in PPP mass housing projects.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 7 September 2023

Haiyi Zong, Guangbin Wang and Dongping Cao

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus…

Abstract

Purpose

As the foundation of social and economic development, infrastructure development projects are characterized by large initial investment, high technical requirements and thus generally delivered through complex contractor–subcontractor collaboration chains. This study aims to characterize the complexity of collaborative networks between contractors and subcontractors for infrastructure development through comparing the structural characteristics and the formation mechanisms of contractor–subcontractor collaborative networks for the following two different types of infrastructure: public works (PWCN) owned and operated by government agencies, and public utilities (PUCN) owned and operated by nongovernment agencies.

Design/methodology/approach

Based on the method of stochastic actor-oriented models and the longitudinal dataset of National Quality Award Projects in China during 2001–2020, this study compares how the structural characteristics of project-based collaborative networks between contractors and subcontractors for the two types of projects are different and how related micro-mechanisms, including both structure-based endogenous network effects and attribute-based exogenous homophily effects (institutional, organizational and geographical homophily), collectively underpin the formation of the networks.

Findings

The empirical results provide evidence that while the two networks are both characterized by relatively low levels of network density, PWCN is more globally connected around a minority of superconnected contractors as compared with PUCN. The results further reveal that compared with PUCN, the formation of PWCN is more significantly related to the structure-based anti in-isolates effect, suggesting that PWCN is more open for new entrant subcontractors. With regard to the attribute-based homophily effects, the results provide evidence that while both significantly and positively related to the effects of organizational (same company group) and geographical homophily (same location), the formation of PWCN and PUCN is oppositely driven by the institutional homophily effect (same ownership type).

Originality/value

As an exploratory effort of using network perspective to investigate the formation mechanisms of contractor–subcontractor relationships in the infrastructure development domain, this study contributes to a network and self-organizing system view of how contractors select subcontractors in different types of infrastructure projects. The study also provides insights into how contractor–subcontractor collaborative relationships can be better manipulated to promote the development of complex infrastructure in different contexts.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 29 September 2023

Mushtaq Ahmad Shah, Sanjeev Kumar, Mohd Asif Shah and Adil Rasool

The sustainable development goal (SDG 17) is to strengthen the means of implementation and revitalise the global partnership for sustainable development. Partnership is a key…

Abstract

Purpose

The sustainable development goal (SDG 17) is to strengthen the means of implementation and revitalise the global partnership for sustainable development. Partnership is a key strategy for acquiring skills, information and private finance for developing critical infrastructure projects. Existing studies have mostly concentrated on identifying critical success factors (CSFs) for successfully delivering public–private partnerships (PPPs) projects, but the interrelationships among CSFs expected from stakeholders have garnered less attention. The purpose of this study is to examine the interconnections among CSFs of PPP projects while keeping the public in mind, as well as the influencing routes that contribute to success in the PPP implementation process.

Design/methodology/approach

The study uses a mixed-method approach that involves both quantitative and qualitative methods of data collection. The data for the study were collected through a well-structured questionnaire from the respondents who are directly or indirectly associated with the PPP project implementation process. The CSF’s framework was built using a literature study and expert interviews; nine hypotheses were developed and evaluated using structural equation modelling. Random and purposive sampling techniques were used for the respondents who were directly or indirectly associated with the PPP project implementation process.

Findings

The findings of this study reveal that the relationship between public and private partners is more adherent than collaborative, with unequal responsibilities, powers and resources distributed among the parties involved. The relevance of state rules, the PPP directive and policies in PPP implementation is supported by the positive connection between favourable environments (Fav_Env) and government attributes (Gov_Atr; the path coefficient is 0.405). Moreover, government attributes have a favourable influence on private company attributes (Pvt_Atr; the path coefficient is 0.198), showing that the state plays a substantial role in the private sector’s decision-making process in PPP. The long-term sustainability and success of a PPP project are dependent on the established interrelationships between CSFs.

Practical implications

The established interrelationships between CSFs will contribute to the long-term viability and success of a PPP project. Since PPP is still in its infancy in India, the study of CSFs in PPPs and their interrelationships will help policymakers and other stakeholders better understand the major individual factors impacting the success or failure of PPP initiatives.

Originality/value

Because PPP is still in its infancy in India, the study of CSFs in PPPs and their interrelationships will help policymakers and other stakeholders to better understand the major individual factors impacting the success or failure of PPP initiatives. A key implication of the study borders on providing a better understanding of the relationships between CSFs and public engagement. This is also critical for the long-term viability of PPPs and the enhancement of public service quality.

Details

Journal of Financial Management of Property and Construction , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1366-4387

Keywords

Article
Publication date: 1 June 2023

Nur Azliani Haniza Che Pak, Suhaiza Ismail and Norhayati Mohd Alwi

The purpose of this paper is to help better understand the translation process of the management control system (MCS) of privatised solid waste management (SWM) towards creating a…

Abstract

Purpose

The purpose of this paper is to help better understand the translation process of the management control system (MCS) of privatised solid waste management (SWM) towards creating a stable network.

Design/methodology/approach

Drawing on the actor network theory (ANT), the case of a privatised SWM was studied. Data were collected from all entities involved in the privatisation process of SWM, which include Department A, Corporation X and the private sector concessionaire. Six documents were reviewed, 20 interviews were conducted and two observations were carried out.

Findings

The findings reveal that the control mechanism of SWM is complex, involving the interaction between human and non-human actors. Non-human actors include the key performance indicators (KPIs) and the concessionaire agreement (CA), which are the main control mechanisms towards creating a stable SWM network. Essentially, stability is achieved when the KPIs and CA can influence the activities of both intra- and inter-organisational relationships.

Originality/value

This paper provides a better understanding of the translation process of the MCS that adds to the stability of the network of a privatised SWM from the lens of the ANT.

Details

Journal of Accounting & Organizational Change, vol. 20 no. 2
Type: Research Article
ISSN: 1832-5912

Keywords