Open Access
Book part
Publication date: 1 May 2019

Maria Saridaki and Kim Haugbølle

The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at…

Abstract

Purpose

The architecture, engineering and construction industry faces several challenges when performing life-cycle cost calculations. On the basis of activity theory, this study aims at improving our understanding of the current cost calculation in design practices as an activity system with a number of built-in contradictions.

Design/Methodology/Approach

Drawing on one of the authors’ practical experience from a design office, the research design comprises a paradigmatic case study of a Danish architecture firm, in which data are gathered through documents, observations, interviews and physical artefacts. Moreover, this paper applies a literature review on barriers for adopting life-cycle costing.

Findings

The paper identifies a number of primary, secondary, tertiary and quaternary contradictions between practices of design, cost calculations and data management. Thus, hypotheses are formulated on how and to what extent these different contradictions shape cost calculations in design practices to obstruct or support the application of life cycle costing principles in design.

Research Limitations/Implications

This study is part of an ongoing research project. Thus, additional analysis is required before the authors may conclude on final results.

Practical Implications

This paper identifies a number of factors that obstruct or support the implementation of life cycle costing in current design practices.

Originality/Value

This paper provides new insights into the various contradictions that shape data management in architectural offices as a prerequisite for improving life cycle design practices.

Details

10th Nordic Conference on Construction Economics and Organization
Type: Book
ISBN: 978-1-83867-051-1

Keywords

Open Access
Article
Publication date: 2 March 2022

Mergen Kor, Ibrahim Yitmen and Sepehr Alizadehsalehi

The purpose of this paper is to investigate the potential integration of deep learning (DL) and digital twins (DT), referred to as (DDT), to facilitate Construction 4.0 through an…

6882

Abstract

Purpose

The purpose of this paper is to investigate the potential integration of deep learning (DL) and digital twins (DT), referred to as (DDT), to facilitate Construction 4.0 through an exploratory analysis.

Design/methodology/approach

A mixed approach involving qualitative and quantitative analysis was applied to collect data from global industry experts via interviews, focus groups and a questionnaire survey, with an emphasis on the practicality and interoperability of DDT with decision-support capabilities for process optimization.

Findings

Based on the analysis of results, a conceptual model of the framework has been developed. The research findings validate that DL integrated DT model facilitating Construction 4.0 will incorporate cognitive abilities to detect complex and unpredictable actions and reasoning about dynamic process optimization strategies to support decision-making.

Practical implications

The DL integrated DT model will establish an interoperable functionality and develop typologies of models described for autonomous real-time interpretation and decision-making support of complex building systems development based on cognitive capabilities of DT.

Originality/value

The research explores how the technologies work collaboratively to integrate data from different environments in real-time through the interplay of the optimization and simulation during planning and construction. The framework model is a step for the next level of DT involving process automation and control towards Construction 4.0 to be implemented for different phases of the project lifecycle (design–planning–construction).

Details

Smart and Sustainable Built Environment, vol. 12 no. 3
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 11 October 2018

Kim Haugbølle and Lau M. Raffnsøe

Sustainable building design suffers from a lack of reliable life cycle data. The purpose of this paper is to compare life cycle costs of sustainable building projects, examine the…

4307

Abstract

Purpose

Sustainable building design suffers from a lack of reliable life cycle data. The purpose of this paper is to compare life cycle costs of sustainable building projects, examine the magnitude of various cost drivers and discuss the implications of an emerging shift in cost drivers.

Design/methodology/approach

This paper is based on data from 21 office buildings certified in Denmark according to the sustainable certification scheme DGNB.

Findings

The paper supports previous findings that construction costs and running costs each roughly make up half of the life cycle costs over a 50-year period. More surprising is the finding that the life cycle costs for cleaning are approximately twice as high as the supply costs for energy and water.

Research limitations/implications

The data set is based on actual construction costs of office buildings constructed in 2013-2017. Although all running costs are calculated rather than measured, they are based on a more detailed, specific and industry-supported set of calculation assumptions than is usual for life cycle costing studies because of extensive collaborative work in a number of concomitant national research and development projects.

Practical implications

Authorities, clients and building professionals heavily emphasise energy-saving measures in new Danish buildings. The paper suggests redirecting this effort towards other more prominent cost drivers like cleaning and technical installations.

Originality/value

This paper provides a notable contribution to the academic understanding of the significance of different cost drivers as well as the practical implementation of life cycle costing.

Details

Facilities, vol. 37 no. 9/10
Type: Research Article
ISSN: 0263-2772

Keywords

Open Access
Article
Publication date: 31 May 2022

Laura Saukko, Kirsi Aaltonen and Harri Haapasalo

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

2040

Abstract

Purpose

The purpose of this paper is to define the integration capability dimensions and create a model for self-assessing the integration capability in inter-organizational projects.

Design/methodology/approach

A theoretical construct of, referred in this study as integration capability framework is elaborated following a systematic literature review. Thereafter, an integration capability self-assessment model, based on maturity thinking, is derived from the theoretical framework. The self-assessment model is further developed and tested for validity within five inter-organizational project networks in cooperation with industry practitioners, representing construction, industrial engineering, and mining sectors.

Findings

The results show that inter-organizational projects can use the developed model in self-assessing the maturity levels of various integration mechanisms, thus the state of integration capability at any point in time during inter-organizational projects.

Originality/value

This study is an attempt to identify how the integration capability dimensions can be self-assessed in inter-organizational projects, through the maturity levels of various integration mechanisms. The results offer insights for both academics and project management practitioners.

Details

International Journal of Managing Projects in Business, vol. 15 no. 8
Type: Research Article
ISSN: 1753-8378

Keywords

Open Access
Article
Publication date: 17 November 2023

Matthew Ikuabe, Clinton Aigbavboa and Ernest Kissi

In most developing countries, the delivery of construction project is still characterised by inefficiencies resulting from the use of outdated methods and techniques, which…

Abstract

Purpose

In most developing countries, the delivery of construction project is still characterised by inefficiencies resulting from the use of outdated methods and techniques, which retards project performance. Hence, the call for the implementation of innovative technologies such as humanoids in the execution of construction projects as it has been proven to be very effective in other sectors while improving productivity and quality of work. Consequently, this study looks at how humanoids can be used in the construction industry and what benefits they can bring.

Design/methodology/approach

The study employed a quantitative approach underpinned in post-positivist philosophical view using questionnaire as the instrument for data collection. The target respondents were construction professionals, and purposive sampling was used, while a response rate of 62.5% was gotten. The methods of data analysis were mean item score, standard deviation and one-sample t-test.

Findings

The findings revealed that humanoids can be used in progress tracking, auto-documentation and inspection and surveillance of tasks in construction activities. Also, the most important benefits of using humanoids in construction work were found to be shorter delivery times, fewer injuries and more accurate work.

Practical implications

The outcome of the study gives professionals and relevant stakeholders in construction and other interested parties' information about the areas where humanoids can be used and their benefits in construction.

Originality/value

The novelty of this study is that it is a pioneering study in South Africa on humanoids' usage in the construction industry. Also, it expands the existing borderline of the conservation of construction digitalisation for enhanced project execution.

Details

International Journal of Building Pathology and Adaptation, vol. 41 no. 6
Type: Research Article
ISSN: 2398-4708

Keywords

Open Access
Article
Publication date: 30 September 2022

James Olaonipekun Toyin and Modupe Cecilia Mewomo

The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies…

2271

Abstract

Purpose

The utilisation of building information modelling (BIM) technology is rapidly increasing among construction professionals across the world. Notwithstanding, recent studies revealed a low level of BIM implementation in the context of the Nigerian construction sector. Moreover, previous studies have established that BIM application comes with its share of various barriers. Therefore, this study aims to carry out an on-site survey on barriers to the application of BIM on construction sites in the Nigerian construction industry.

Design/methodology/approach

An extensive review of literature on BIM barriers was conducted, from where 33 factors were identified as significant BIM barriers peculiar to the developing countries. A questionnaire was developed and distributed to the targeted respondents, who are practicing professionals in the Nigerian construction industry, based on the identified barriers. The data collected were analysed by using both descriptive and inferential statistics.

Findings

The principal component analysis revealed that 27 barriers were peculiar to the Nigerian construction industry. The “lack of familiarity with BIM capacity, habitual resistance to change from the traditional style of design and build, and poor awareness of BIM benefit” were identified as the three most critical barriers hindering BIM application on construction sites in the Nigerian construction industry.

Practical implications

This study reveals key information on the peculiar barriers to BIM application in the Nigerian construction industry. The avoidance of these barriers will not only assist various construction stakeholders in the successful implementation of BIM application on a construction project but also promote information management systems and productivity within the construction industry to a great extent. These will further improve post-construction activities.

Originality/value

This study provides a substantial understanding of BIM state of the art in the context of barriers hindering BIM application on construction sites in the Nigerian construction industry.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 2
Type: Research Article
ISSN: 1726-0531

Keywords

Open Access
Article
Publication date: 12 March 2019

Mounir Bensalah, Abdelmajid Elouadi and Hassan Mharzi

The authors will give an overview of the railway market, with a focus on Morocco, before seeing the challenges to face, before listing some benefits of rail links in terms of…

9066

Abstract

Purpose

The authors will give an overview of the railway market, with a focus on Morocco, before seeing the challenges to face, before listing some benefits of rail links in terms of development, ecology, security, space management, etc. The authors will then give an overview of the development of BIM, its benefits, risks and issues. The purpose of this paper is to verify that the BIM can provide the railway with the tools to face some of its challenges and improve its productivity.

Design/methodology/approach

This paper is part of our research project on the integration of BIM in railway, which is the result of a partnership between Colas Rail Maroc and the ENSAK of the Ibn Tofail University of Kenitra. The objective of this paper is mainly to confirm that the integration of BIM with the railway, through a theoretical and practical study, can have positive impacts. To do this, our methodology consists in studying briefly the development of the railway, the need to improve the budgets and schedules of the projects, to increase the productivity, before showing the advantages of the BIM in the sector of the Architecture, Engineering and Construction (AEC). The study of feedback from railway projects (chosen for their date of completion – beyond 2014, their size, their geographical situation in several countries and for the availability of literature in a new field) will confirm the initial hypotheses. Among the projects studied will be a project that has been the subject of an article written by the authors of this paper. In the discussion of the results, the authors will focus on the benefits, risks and limitations of integrating BIM into the railway. In conclusion, the authors are laying the groundwork for future research in the field.

Findings

The cases study discussed in this paper and previous research confirms the hypotheses of the literature. The integration of BIM into railway projects can have several advantages: collaboration, time saving, cost optimization, prevention of conflicts between networks, construction before construction, optimization of facility management, improvement of the quality of works, prefabrication. They also allowed us to illustrate the risks (status and appropriation of the BIM model, lack of standardization of versions or software and lack of understanding of the basics of schedules and specifications) and limitations (lack of feedback, lack of adaptability and convergence of tools). These experiences have also shown that the use of BIM is not just a technological transition, but a revolution in the project management process, which requires several key success factors (participation of all, commitment, change management and adoption of the collaborative approach). Visualization, collaboration and conflict elimination are the three main chapters where the benefits of BIM can be organized. In fact, there is a lot of intersection between these chapters, but they have been chosen as the main ideas around which all the benefits can be better understood. Visualization primarily addresses the benefits to an individual and improving one’s personal understanding as a result of using BIM. The collaboration refers to the cooperative action of several team members, which is encouraged and facilitated by BIM. Conflict elimination mainly concerns project-related benefits, such as conflict reduction, waste, risks, costs and time. For railway infrastructure projects, the main purpose of using BIM is to improve the design integration process, internal project team communication and collision detection to eliminate risk of rehabilitation.

Research limitations/implications

The application of the BIM process in railway infrastructure requires constant improvement. This concerns the development of libraries and the models available to all users in order to encourage the development of this methodology and, consequently, its use of information throughout the life cycle of an infrastructure work.

Practical implications

The case study of real projects incorporating BIM confirms the results of the literature review. The benefits of integrating BIM into rail projects are multiple and proven: cost control, decision support, avoids extra work due to design errors, improves detection of interface problems, improves planning of vision, help with prefabrication and facility management, etc. Finally, the BIM process is able to overcome delays in procedures slowing the development of the construction industry in many countries, especially in Morocco, because of the slowness of design (or downright bad design).

Social implications

The integration of BIM into rail is becoming a global trend. This integration requires government decisions and a maturation of technology and tools. The authorities of some developed countries studied (Sweden, UK, France, Germany) in the railways, at different stages of implementation, are adopting BIM in the process of setting up new railway projects. This political impulse is still behind in southern countries, such as Morocco. The trend and the data collected indicate an adoption between 2020 and 2030 of BIM in all/some AEC projects in developed countries. This will have an impact on other countries that will soon be doing the same, especially in the railway sector to adopt the BIM.

Originality/value

As part of the realization of this paper, we proceeded to the implementation of an electrical substation as part of the project to build 40 electric traction substations built by Colas Rail on behalf of ONCF.

Details

Smart and Sustainable Built Environment, vol. 8 no. 2
Type: Research Article
ISSN: 2046-6099

Keywords

Open Access
Article
Publication date: 1 March 2022

Elisabetta Colucci, Francesca Matrone, Francesca Noardo, Vanessa Assumma, Giulia Datola, Federica Appiotti, Marta Bottero, Filiberto Chiabrando, Patrizia Lombardi, Massimo Migliorini, Enrico Rinaldi, Antonia Spanò and Andrea Lingua

The study, within the Increasing Resilience of Cultural Heritage (ResCult) project, aims to support civil protection to prevent, lessen and mitigate disasters impacts on cultural…

2020

Abstract

Purpose

The study, within the Increasing Resilience of Cultural Heritage (ResCult) project, aims to support civil protection to prevent, lessen and mitigate disasters impacts on cultural heritage using a unique standardised-3D geographical information system (GIS), including both heritage and risk and hazard information.

Design/methodology/approach

A top-down approach, starting from existing standards (an INSPIRE extension integrated with other parts from the standardised and shared structure), was completed with a bottom-up integration according to current requirements for disaster prevention procedures and risk analyses. The results were validated and tested in case studies (differentiated concerning the hazard and type of protected heritage) and refined during user forums.

Findings

Besides the ensuing reusable database structure, the filling with case studies data underlined the tough challenges and allowed proposing a sample of workflows and possible guidelines. The interfaces are provided to use the obtained knowledge base.

Originality/value

The increasing number of natural disasters could severely damage the cultural heritage, causing permanent damage to movable and immovable assets and tangible and intangible heritage. The study provides an original tool properly relating the (spatial) information regarding cultural heritage and the risk factors in a unique archive as a standard-based European tool to cope with these frequent losses, preventing risk.

Details

Journal of Cultural Heritage Management and Sustainable Development, vol. 14 no. 2
Type: Research Article
ISSN: 2044-1266