Article
Publication date: 7 March 2024

Mohammed Ali Abd Ali Alsemari and Manu Ramegowda

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements…

Abstract

Purpose

The oil and gas industry form the main resource of economy in Iraq and constructing any project in such sectors requires a huge amount of expenses due to the unique requirements that oil and gas facilities required in such projects. Therefore, adopting an appropriate technological approach such as building information modeling (BIM) which is unfortunately not adopted yet in Iraq is essential to successfully deliver these projects. Thus, this paper aimed to introduce BIM to Iraq through Basra Oil Company (BOC) which is one of the biggest public oil and gas companies in Iraq.

Design/methodology/approach

The related literature of journals articles, conference proceedings and published reports have been reviewed. As a result, firstly: a hypothesis has been derived that is “If Basra Oil Company (BOC) adopts and applies BIM approach instead of the 2D approach currently used to manage its projects, the company can overcome several constraints in managing its projects that associated with such 2D traditional approach”; secondly: homogenous, consistence and reliable web-based questionnaire has been designed as its Cronbach’s alpha equal to 0.897 and 0.711 for BIM benefits and barriers, respectively. This questionnaire distributed to the BOC related professionals to test such hypothesis by investigating their readiness and accepting of BIM approach and to rank BIM barriers based on five-point Likert scale.

Findings

Based on the analysis using IBM SPSS Statistics 26 of 115 responses, almost 50% of the respondents had experience 11–15 years, while 22.6% had experience more than 15 years in oil and gas industry construction projects. Those participants were from diverse engineering majors that are: 4.3% Architectural Engineers, 31.3% Civil Engineers, 20% Mechanical Engineers, 22.6% Electrical Engineers and 21.7% from other engineering majors. The respondents’ departments demography was 16.5% of design department, 12.2% of construction department, 20.9% of Project Management Department, 12.2% of Maintenance department, 4.3% of HSE Department, 13% of Production Department and 20.9% of “Other Department.” The study resulted in 1: accepting BIM approach to be an alternative of current 2D-traditional approach used by the company to manage and construct its projects, since mean of collected data is (4.4332), Kruskal–Wallis H test significance values were 0.398 and 0.372; and ANOVA test significance values were 0.433 and 0.599 among Engineering Majors groups and Company’s Department groups, respectively. 2: Disclosed and sequenced BIM barriers in the company based on their criticality. 3: verifying reliably how BIM attributes are important to oil and gas construction projects in Iraq, 4: the company top management and company policies are the most critical potential factors to hinder or adopt and implement BIM in the company, 5: while cost is not seen a critical barrier to implement BIM in the oil and gas sector.

Research limitations/implications

The limitation of this study is the excluding of decision makers of BOC, thus more profound future studies need to be conducted where top management and decision makers are involved, particularly the present study demonstrated that support of company top management is the most critical factor which can help the company to adopt (BIM).

Originality/value

The study concludes that BIM approach is valuable for managing projects in oil and gas sector in Iraq and identify the originality in output by using the research method. This noble study provides a leverage for enhanced research to adopt and implement building information modeling (BIM) in Iraq as the study originally demonstrates benefits and identifies the critical barriers in BIM implementation to push the boundaries toward adopt Digitalization and reduce CO2 emission in Iraqi oil and gas sector. The study can be used as evidence and platform to encourage professionals and practitioners to present more sophisticated tools of BIM in the oil and gas industry, especially for facility and operation management. These findings achieved via oil and gas experts, and it is first time to achieve such findings from a case study in Iraqi oil and gas sector.

Details

Smart and Sustainable Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2046-6099

Keywords

Article
Publication date: 23 January 2023

Bruno Falcón Silveira and Dayana Bastos Costa

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for…

Abstract

Purpose

Several studies have addressed the use of four-dimensional (4D) building information modeling (BIM) for construction management. However, the automation of the processes for generating 4D models and their integrated use with Location-Based Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles.

Design/methodology/approach

The research strategy adopted was Design Science Research. The automated method for using the 4D models was developed and refined in two residential building projects in Brazil, along with 31 meetings and involving 11 direct users. The assessment of the proposed method focuses on four constructs: the impact of process automation, the impact on the identification and assessment of site progress and the planning process, ease of adoption and utility of the proposed method.

Findings

The results of this paper indicated increased adherence between planned and executed through an automated method for using the 4D models. The established routines enabled automating the link between the planning levels and the three-dimensional (3D) model, providing a more agile and updated data source and achieving 92.8% of user satisfaction regarding the deadline and frequency of delivery of the 4D model reports. Moreover, this study identified the relationships between the processes of the method proposed and Digital Models.

Originality/value

The primary scientific value achieved in this study is creating a method for automating processes and simplifying steps for the generation and use of 4D BIM models in the production planning and control cycles during the construction phase.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 31 January 2023

Shuvo Dip Datta, Md. Habibur Rahman Sobuz, Mohammad Nafe Assafi, Norsuzailina Mohamed Sutan, Md. Nazrul Islam, Maria Binte Mannan, Abu Sayed Mohammad Akid and Noor Md. Sadiqul Hasan

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Abstract

Purpose

This paper aims to identify the critical project management success factors and analyze those factors to achieve a sustainable construction industry in Bangladesh.

Design/methodology/approach

This study identified 41 major problematic factors from the related literature. In this research, a detailed questionnaire survey was conducted among the experts and stakeholders of the construction industry of Bangladesh. The survey was carried out on a Likert scale and ranked the critical factors using the relative importance index (RII). The 41 problematic factors were divided into five group factors and ranked by the RII index to prioritize the factors. Finally, stakeholders' opinions were analyzed with the critical assessed factors, which was a very effective technique to eliminate the risks and uncertain occurrences in the construction industry of Bangladesh.

Findings

The factors analysis revealed that cost overrun, traffic jam, low wedges, slow payment for completed works and financial issues of the owner were leading critical factors in construction projects. Moreover, the critical factors are divided into five-factor groups, namely, financial management, monitoring and feedback, competency management, communication and coordination management, and risk management, which exhibit 0.767, 0.720, 0.711, 0.710 and 0.658 RII values. After all, the stakeholders' opinion suggested that implementing modern tools and techniques can help to avoid the critical situation in the construction industry of Bangladesh.

Practical implications

The construction industry of Bangladesh is moving away from stable construction work day by day. Previously, the potential CSFs were discussed unstructured way. Hence, detecting early warning signals in a structured way has become necessary for the building firm's survival.

Originality/value

Though some scattered critical issues are discussed in different literature, the critical issues of the Bangladeshi construction industry were not investigated extensively. Therefore, this study finds out the potential critical issues of the construction industry of Bangladesh to accumulate such harmful construction issues in a single platform so that the construction industry can have an overview of them with the help of innovative technologies.

Details

International Journal of Building Pathology and Adaptation, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 2398-4708

Keywords

Article
Publication date: 20 March 2023

Esra Dobrucali, Emel Sadikoglu, Sevilay Demirkesen, Chengyi Zhang, Algan Tezel and Isik Ates Kiral

Construction is a risky industry. Therefore, organizations are seeking ways towards improving their safety performance. Among these, the integration of technology into health and…

Abstract

Purpose

Construction is a risky industry. Therefore, organizations are seeking ways towards improving their safety performance. Among these, the integration of technology into health and safety leads to enhanced safety performance. Considering the benefits observed in using technology in safety, this study aims to explore digital technologies' use and potential benefits in construction health and safety.

Design/methodology/approach

An extensive bibliometrics analysis was conducted to reveal which technologies are at the forefront of others and how these technologies are used in safety operations. The study used two different databases, Web of Science (WoS) and Scopus, to scan the literature in a systemic way.

Findings

The systemic analysis of several studies showed that the digital technologies use in construction are still a niche theme and need more assessment. The study provided that sensors and wireless technology are of utmost importance in terms of construction safety. Moreover, the study revealed that artificial intelligence, machine learning, building information modeling (BIM), sensors and wireless technologies are trending technologies compared to unmanned aerial vehicles, serious games and the Internet of things. On the other hand, the study provided that the technologies are even more effective with integrated use like in the case of BIM and sensors or unmanned aerial vehicles. It was observed that the use of these technologies varies with respect to studies conducted in different countries. The study further revealed that the studies conducted on this topic are mostly published in some selected journals and international collaboration efforts in terms of researching the topic have been observed.

Originality/value

This study provides an extensive analysis of WoS and Scopus databases and an in-depth review of the use of digital technologies in construction safety. The review consists of the most recent studies showing the benefits of using such technologies and showing the usage on a systemic level from which both scientists and practitioners can benefit to devise new strategies in technology usage.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 17 April 2024

Hazwani Shafei, Rahimi A. Rahman, Yong Siang Lee and Che Khairil Izam Che Ibrahim

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of…

Abstract

Purpose

Amid rapid technological progress, the construction industry is embracing Construction 4.0, redefining work practices through emerging technologies. However, the implications of Construction 4.0 technologies to enhancing well-being are still poorly understood. Particularly, the challenge lies in selecting technologies that critically contribute to well-being enhancement. Therefore, this study aims to evaluate the implications of Construction 4.0 technologies to enhancing well-being.

Design/methodology/approach

A list of Construction 4.0 technologies was identified from a national strategic plan on Construction 4.0, using Malaysia as a case study. Fourteen construction industry experts were selected to evaluate the implications of Construction 4.0 technologies on well-being using fuzzy Technique for Order Preference by Similarity to Ideal Solution (TOPSIS). The expert judgment was measured using linguistic variables that were transformed into fuzzy values. Then, the collected data was analyzed using the following analyses: fuzzy TOPSIS, Pareto, normalization, sensitivity, ranking performance and correlation.

Findings

Six Construction 4.0 technologies are critical to enhancing well-being: cloud & real-time collaboration, big data & predictive analytics, Internet of Things, building information modeling, autonomous construction and augmented reality & virtualization. In addition, artificial intelligence and advanced building materials are recommended to be implemented simultaneously as a very strong correlation exists between them.

Originality/value

The novelty of this study lies in a comprehensive understanding of the implications of Construction 4.0 technologies to enhancing well-being. The findings can assist researchers, industry practitioners and policymakers in making well-informed decisions to select Construction 4.0 technologies when targeting the enhancement of the overall well-being of the local construction industry.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

Article
Publication date: 13 June 2023

Mark Swallow and Sambo Lyson Zulu

The benefits of integrating immersive technologies (ImTs) within a construction safety context are acknowledged within the literature; however, its practical application on…

Abstract

Purpose

The benefits of integrating immersive technologies (ImTs) within a construction safety context are acknowledged within the literature; however, its practical application on construction sites remains low. Whilst research into the integration of ImTs within the construction industry is underway, most have viewed this from a broader adoption context or within educational settings, and not specifically from a practical on-site safety perspective. Therefore, the purpose of this study is to address the contributing factors to its integration within on-site safety processes, using the experiences of active construction professionals.

Design/methodology/approach

This study adopts a qualitative approach. Data was collected through online focus groups involving UK based construction professionals with experience in using ImTs, recruited using selective sampling. Data sets were subsequently analysed using inductive thematic analysis and are presented within key themes.

Findings

The results showed that among the experienced construction professionals, the use of ImTs specifically for on-site safety applications (including inductions/training/workshops) was rare on projects. The findings identified various contributing factors related to the integration of ImTs, including the potential improvements in on-site safety practices such as enhanced communication of hazards, safety planning, engagement during training and more accurate risk assessment. Critical challenges, concerns and frustrations included a lack of engagement from senior level management, inadequate leadership, limited investment, a need for digital expertise, fear of complacency and the acceptance of ImTs within existing safety processes from the wider project team.

Originality/value

This study provides a fresh perspective to this field by using practical accounts from active and experienced on-site construction professionals. This study supports the integration of ImTs within the construction industry, presenting key contributing factors influencing its integration within on-site safety processes. These factors can be considered by industry adopters, and includes the rationale, challenges and potential on-site benefits of ImTs.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 21 February 2024

Juliet Owusu-Boadi, Ernest Kissi, Ivy Maame Abu, Cecilia Dapaah Owusu, Bernard Baiden and Caleb Debrah

The construction business is widely recognised for its inherent complexity and dynamic nature, which stems from the nature of the job involved. The industry is often regarded as…

Abstract

Purpose

The construction business is widely recognised for its inherent complexity and dynamic nature, which stems from the nature of the job involved. The industry is often regarded as one of the most challenging industries globally in terms of implementing environmental, health and safety (EHS) practices. However, in the absence of EHS, the construction industry cannot be considered sustainable. Therefore, this study aims to identify the trends, knowledge gaps and implications of EHS research to enhance construction activities and knowledge.

Design/methodology/approach

The study adopted a science mapping approach involving bibliometric and scientometric analysis of 407 construction EHS publications from the Scopus database with the VOSviewer software. The study is based on journal articles from the Scopus database without restriction to any time range.

Findings

The main focus of construction EHS research identified in the study includes sustainability-related studies, risk-related, environmental issues, EHS management, integrated management systems studies, health and safety related and EHS in the construction process. Some emerging areas also identified include productivity, design, culture, social sustainability and machine learning. The most influential and productive publication sources, countries/regions and EHS publications with the highest impact were also determined.

Research limitations/implications

Documents published in the Scopus database were considered for analysis because of the wider coverage of the database. Journal articles written in English language represent the inclusion criteria, whereas other documents were excluded from the analysis. The study also limited the search to articles with the engineering subject area.

Practical implications

The research findings will enlighten stakeholders and practitioners on the focal knowledge areas in the EHS research domain, which are vital for enhancing EHS in the industry.

Originality/value

To the best of the authors’ knowledge, this review-based study is the first attempt to internationally conduct a science mapping on extant literature in the EHS research domain through bibliometric and scientometric assessments.

Details

Journal of Engineering, Design and Technology , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 20 December 2022

Abdulwahed Fazeli, Saeed Banihashemi, Aso Hajirasouli and Saeed Reza Mohandes

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction…

Abstract

Purpose

This research aims to develop an automated and optimization algorithms (OAs)-integrated 4D building information modeling (BIM) approach and a prototype and enable construction managers and practitioners to estimate the time of compound elements in building projects using the resource specification technique.

Design/methodology/approach

A 4D BIM estimation process was first developed by applying the resource specification and geometric information from the BIM model. A suite of OA including particle swarm optimization, ant colony, differential evolution and genetic algorithm were developed and compared in order to facilitate and automate the estimation process. The developed processes and porotypes were linked and integrated.

Findings

The OA-based automated 4D BIM estimation prototype was developed and validated through a real-life construction project. Different OAs were applied and compared, and the genetic algorithm was found as the best performing one. The prototype was successfully linked with BIM timeliner application. By using this approach, the start and finish dates of all object-based activities are developed, and the project completion time is automatically estimated.

Originality/value

Unlike conventional construction estimation methods which need various tools and are error prone and time-consuming, the developed method bypasses the existing time estimation tools and provides the integrated and automated process with BIM and machine learning algorithms. Furthermore, this approach integrates 4D BIM applications into construction design procedures, connected with OA automation.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 6 March 2023

Ningshuang Zeng, Xuling Ye, Yan Liu and Markus König

The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism…

Abstract

Purpose

The unstable labor productivity and periodic planning method cause barriers to improving construction logistics management. This paper aims to explore a demand-driven mechanism for efficient construction logistics planning to record the material consumption, report the real-time demand and trigger material replenishment from off-site to on-site, which is aided by Building Information Modeling (BIM) and the Kanban technique.

Design/methodology/approach

This paper follows the design science research (DSR) principles to propose a system of designing and applying Kanban batch with 4D BIM for construction logistics planning and monitoring. Prototype development with comparative simulation experiments of a river remediation project is conducted to analyze the conventional and Kanban-triggered supply. Two-staged industrial interviews are conducted to guide and evaluate the system design.

Findings

The proposed BIM-enabled Kanban system enables construction managers and suppliers to better set integrated on- and off-site targets, report real-time demands and conduct collaborative planning and monitoring. The simulation results present significant site storage and schedule savings applying the BIM-enabled Kanban system. Feedback and constructive suggestions from practitioners are collected via interviews and analyzed for further development.

Originality/value

This paper brings to the limelight the benefits of implementing BIM-enabled demand-driven replenishment to remove waste from the material flow. This paper combines lean production theory with advanced information technology to solve construction logistics management problems.

Details

Engineering, Construction and Architectural Management, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 0969-9988

Keywords

Article
Publication date: 22 January 2024

Md. Tareq Hossain Khondoker, Md. Mehrab Hossain and Ayan Saha

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited…

Abstract

Purpose

Due to its longer length compared to other construction materials and distinctive stacking patterns, obtaining construction steel bars in congested construction sites with limited storage capacity becomes challenging. Lack of storage space in crowded places prompts the need for building steel bar storage choice optimization. Therefore, this study aims to optimize the construction steel bar procurement plan by providing when and how much rebar to order and how to stack different sizes of rebar considering limited storage capacity.

Design/methodology/approach

A novel approach has been presented in this paper by integrating 4D building information modelling (BIM) and mixed-integer linear programming (MILP). This technique uses BIM to retrieve material quantities, including rebar, during the design phase. Following that, activities are scheduled depending on the duration determined by crew productivity data and material quantity. Then, based on the prior price, the price of each unit of rebar is projected for the duration of construction using the exponential smoothing method. After that, the MILP approach is used to generate an optimal steel bar procurement plan for limited storage space following the scheduled rebar-related operations.

Findings

The developed strategy minimizes overall procurement costs and ensures the storage of rebar as per standard guidelines. An optimal rebar procurement and storage plan to construct a six-storied RC frame has been presented in this paper as a demonstrative example to show the effectiveness of the proposed method.

Originality/value

This work partially satisfies a long-sought research need for establishing a comprehensive construction steel bar procurement system, making it a very useful source of information for practitioners and researchers. The proposed method can be used to minimize a key performance limitation that the conventional rebar procurement practice for crowded building sites may experience.

Details

Construction Innovation , vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1471-4175

Keywords

1 – 10 of 103