Built Environment Project and Asset Management: Volume 9 Issue 5

Subject:

Table of contents

Managing change in BIM-Level 2 projects: benefits, challenges, and opportunities

Karen B. Blay, Martin Morgan Tuuli, Jojo France-Mensah

The purpose of this paper is to validate perceived benefits and challenges of managing change in Building Information Modelling (BIM) Level 2 projects and to further explore the…

1280

Significant causes of claims and disputes in construction projects in Saudi Arabia

Sadi Assaf, Mohammad A. Hassanain, Abdullatif Abdallah, Ahmed M.Z. Sayed, Abdulrahman Alshahrani

Projects in the construction industry have been confronted with an unprecedented volume of claims, which negatively impact the construction business environment. The purpose of…

1376

Aluminum formwork system: loss and productivity

Marina Macedo de Abreu, Alberto Casado Lordsleem Jr

The purpose of this paper is to establish and evaluate the concrete loss and labor productivity (LP) indicators in the concreting step of aluminum formwork system (AFS) in…

Communication performance challenges in PPP projects: cases of Ghana and South Africa

Titus Ebenezer Kwofie, Clinton Ohis Aigbavboa, Wellington Didibhuku Thwala

The need to gain theoretical and practical understanding into the communication performance challenges in public private partnership (PPP) projects is considered as a precursor to…

The PPP performance based on the co-creation with customers

Safa Medimagh, Abdelfattah Triki

The purpose of this paper is to enlighten the position of the customer as a driver to achieve the public–private partnership’s performance. It demonstrates that the customer…

Transparency of public private partnership (PPP): the extent of mandatory information disclosure

Suhaiza Ismail, Mubarak Shehu Musawa, Hawa Ahmad

The purpose of this paper is to examine the extent public listed construction firms in Malaysia disclose mandatory information on public private partnership (PPP) projects. This…

Public–private equity joint ventures and risk transfers in motorways of the sea

Carmen Juan, Fernando Olmos

The purpose of this paper is to present a new scheme of public–private partnership (PPP) within the framework of motorways of the sea (MoS) similar to that of an equity joint…

Cover of Built Environment Project and Asset Management

ISSN:

2044-124X

Online date, start – end:

2011

Copyright Holder:

Emerald Publishing Limited

Open Access:

hybrid

Editor:

  • Prof. Mohan Kumaraswamy