Engineering, Construction and Architectural Management: Volume 13 Issue 5

Subject:

Table of contents

Exploring the integration of health and safety with pre‐construction planning

Billy Hare, Iain Cameron, A. Roy Duff

The purpose of this paper is to report on findings from a research project, commissioned by the UK Health and Safety Executive (HSE), to investigate the integration of health and…

4884

Critical success factors of public private sector partnerships: A case study of the Sydney SuperDome

Marcus Jefferies

The purpose of this paper is to examine perceptions of Build‐Own‐Operate Transfer (BOOT) schemes in order to develop a framework of critical success factors (CSF).

5707

Building Egypt 1 – a general indicator cost index for the Egyptian construction industry

Amr A.G. Hassanein, Bahaee N.L. Khalil

The aim of this article is to develop a cost index to serve as a price indicator for the Egyptian construction industry.

1452

Factors influencing the construction time of civil engineering projects in Malaysia

Ahmad Anuar Othman, Johan Victor Torrance, Munshi Ab. Hamid

The objectives of this paper are to determine the current level of construction time performance of public sector projects; and to identify variables related to project…

5555

Residential construction quality and production levels in Taiwan

Hui‐Yuan Hsieh, John Forster

The aim of this article is to present a new, simple applicable method of inferring and assessing residential construction quality at an industry‐wide level.

Alliances in construction: Investigating initiatives and barriers for long‐term collaboration

Bingunath Ingirige, Martin Sexton

This paper aims to prove that alliances in the construction industry can be used as vehicles to achieve sustainable competitive advantage.

3339
Cover of Engineering, Construction and Architectural Management

ISSN:

0969-9988

Online date, start – end:

1994

Copyright Holder:

Emerald Publishing Limited

Open Access:

hybrid

Editor:

  • Professor Chimay Anumba