Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times

Mohammad Yaghtin (Industrial Engineering Department, Engineering Faculty, Kharazmi University, Tehran, Iran)
Youness Javid (Industrial Engineering Department, Engineering Faculty, Kharazmi University, Tehran, Iran)

Journal of Modelling in Management

ISSN: 1746-5664

Article publication date: 17 September 2024

35

Abstract

Purpose

The purpose of this research is to address the complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup times and periodic machine maintenance. The primary goal is to minimize total tardiness, earliness and total completion times simultaneously. This study aims to provide effective solution methods, including a Mixed-Integer Programming (MIP) model, an Epsilon-constraint method and the Nondominated Sorting Genetic Algorithm (NSGA-II), to offer valuable insights into solving large-sized instances of this challenging problem.

Design/methodology/approach

This study addresses a multiobjective unrelated parallel machine scheduling problem with sequence-dependent setup times and periodic machine maintenance activities. An MIP model is introduced to formulate the problem, and an Epsilon-constraint method is applied for a solution. To handle the NP-hard nature of the problem for larger instances, an NSGA-II is developed. The research involves the creation of 45 problem instances for computational experiments, which evaluate the performance of the algorithms in terms of proposed measures.

Findings

The research findings demonstrate the effectiveness of the proposed solution approaches for the multiobjective unrelated parallel machine scheduling problem. Computational experiments on 45 generated problem instances reveal that the NSGA-II algorithm outperforms the Epsilon-constraint method, particularly for larger instances. The algorithms successfully minimize total tardiness, earliness and total completion times, showcasing their practical applicability and efficiency in handling real-world scheduling scenarios.

Originality/value

This study contributes original value by addressing a complex multiobjective unrelated parallel machine scheduling problem with real-world constraints, including sequence-dependent setup times and periodic machine maintenance activities. The introduction of an MIP model, the application of the Epsilon-constraint method and the development of the NSGA-II algorithm offer innovative approaches to solving this NP-hard problem. The research provides valuable insights into efficient scheduling methods applicable in various industries, enhancing decision-making processes and operational efficiency.

Keywords

Citation

Yaghtin, M. and Javid, Y. (2024), "Multiobjective unrelated parallel machines scheduling problem with periodic maintenance activities and dependent processing times", Journal of Modelling in Management, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/JM2-09-2023-0198

Publisher

:

Emerald Publishing Limited

Copyright © 2024, Emerald Publishing Limited