DIVISIONAL REORGANISATION AT TECALEMIT

Industrial Lubrication and Tribology

ISSN: 0036-8792

Publication date: 1 February 1968

Abstract

THE PROBLEM of maintaining efficiency in an expanding industrial organisation is a constant management problem. A new extension may have to be provided to house a new machine or new production methods and this may mean the installation of different machines or a rearrangement of existing equipment. However it is not all that often that a company has to look at itself critically and to make a decision that the complete structure of the organisation requires changing. Just over a year ago Tecalemit (Engineering) Ltd. at Plymouth decided to do just this on a product orientated basis. The main objectives of the reorganisation were to shorten lines of communication from top management to the shop floor, to build up specialist teams who were fully conversant with their own product range and generally to improve efficiency both internally and in service to the customer. The reorganisation involved considerable movement of machines and personnel within the Plymouth factory, all of which took place during December 1966 and January 1967. That this was effective with no hinderance to Sales and Service must be due to sound organisation together with excellent management/staff relations.

Citation

(1968), "DIVISIONAL REORGANISATION AT TECALEMIT", Industrial Lubrication and Tribology, Vol. 20 No. 2, pp. 60-62. https://doi.org/10.1108/eb052857

Download as .RIS

Publisher

:

MCB UP Ltd

Copyright © 1968, MCB UP Limited

Please note you might not have access to this content

You may be able to access this content by login via Shibboleth, Open Athens or with your Emerald account.
If you would like to contact us about accessing this content, click the button and fill out the form.
To rent this content from Deepdyve, please click the button.