To read this content please select one of the options below:

Work Study Volume 24 Issue 4

Work Study

ISSN: 0043-8022

Article publication date: 1 April 1975

46

Abstract

PRODUCTIVITY is a constant awareness of the need to make more efficient use of the production resources, and the efficiency/performance returns in each factory will testify to the thoroughness of work study. There will be those factories where work study is discredited in that production methods have remained static, original study work has not been properly recorded and amendments have gone by the board with the inevitable consequence that standards slip. Any work study findings are no longer accepted as valid with the result that work measurement degenerates to the level of rate fixing.

Citation

(1975), "Work Study Volume 24 Issue 4", Work Study, Vol. 24 No. 4, pp. 3-48. https://doi.org/10.1108/eb048314

Publisher

:

MCB UP Ltd

Copyright © 1975, MCB UP Limited

Related articles