Ear‐to‐ground

Aircraft Engineering and Aerospace Technology

ISSN: 0002-2667

Publication date: 1 April 1972

Abstract

In the two years since the last show, the organisers have put in hand considerable improvements in the Torino Caselle airport to improve facilities that should become apparent at the Turin Air Show on 1st to 11th June. These include improvements in the food and restaurant section and the construction of a new power station to deliver 1,000KwLh to improve the illumination.

Citation

(1972), "Ear‐to‐ground", Aircraft Engineering and Aerospace Technology, Vol. 44 No. 4, pp. 47-47. https://doi.org/10.1108/eb034899

Download as .RIS

Publisher

:

MCB UP Ltd

Copyright © 1972, MCB UP Limited

Please note you might not have access to this content

You may be able to access this content by login via Shibboleth, Open Athens or with your Emerald account.
If you would like to contact us about accessing this content, click the button and fill out the form.
To rent this content from Deepdyve, please click the button.