TY - JOUR AB - THE following is a description of the steelyard balance used in the construction of the six‐component balance at the wind tunnel of the German Aeronautical Research Institute (D.V.L.). It is characterised by an unusually high degree of precision. VL - 8 IS - 6 SN - 0002-2667 DO - 10.1108/eb030054 UR - https://doi.org/10.1108/eb030054 AU - Kramer M. AU - Ginger J.E.W. AU - Hounsfield R. PY - 1936 Y1 - 1936/01/01 TI - An Electric Steelyard Balance: Six‐Component Balance with Remote Autographic Recording Installed in the New D.V.L. Wind Tunnel T2 - Aircraft Engineering and Aerospace Technology PB - MCB UP Ltd SP - 151 EP - 153 Y2 - 2024/04/19 ER -