To read this content please select one of the options below:

Application of simulation related techniques to construction operations

HONG ZHANG (Department of Building and Construction, City University of Hong Kong, Kowloon, Hong Kong)
JONATHAN J. SHI (Department of Civil and Architectural Engineering, Illinois Institute of Technology, Chicago, USA)
CHI‐MING TAM (Department of Building and Construction, City University of Hong Kong, Kowloon, Hong Kong)

Engineering, Construction and Architectural Management

ISSN: 0969-9988

Article publication date: 1 May 2002

206

Abstract

This paper presents some simulation‐oriented techniques, particularly the resource allocation point (RAP) heuristic rule, for an activity‐based construction (ABC) simulation that requires only one kind of element to model construction operations. RAP heuristic rule provides the simulation with the decision‐making ability for allocating limited resources during simulation. Predefined entity management strategies control the movements of simulation entities so as to model some complex features of construction operations. An activity object‐oriented (AOO) simulation strategy based on object‐oriented approach for the implementation of the ABC simulation by regarding activities as objects controls the mechanism of the ABC simulation by checking only relevant activities at certain time, other than checking all activities for each simulation time unit. An easy‐to‐use animation aims at enhancing understanding of simulation and assisting modellers in verifying and validating model.

Keywords

Citation

ZHANG, H., SHI, J.J. and TAM, C. (2002), "Application of simulation related techniques to construction operations", Engineering, Construction and Architectural Management, Vol. 9 No. 5/6, pp. 433-445. https://doi.org/10.1108/eb021237

Publisher

:

MCB UP Ltd

Copyright © 2002, MCB UP Limited

Related articles