TY - JOUR AB - Effluent Pipe Protection. A mile of 18‐in.‐diam. steel pipe was recently pulled into the Usk estuary to form the new pipeline for treated effluent from the Newport factory of Monsanto Chemicals Ltd. It replaces a cast‐iron outfall which was not large enough to handle the anticipated increase in the amount of treated effluent. The path of the new pipe runs from the shore near Goldcliffe to the discharge position 5,000 ft. out in the Channel to a point below the lowest predicted tide level. VL - 7 IS - 7 SN - 0003-5599 DO - 10.1108/eb019746 UR - https://doi.org/10.1108/eb019746 PY - 1960 Y1 - 1960/01/01 TI - NEWS OF INDUSTRY T2 - Anti-Corrosion Methods and Materials PB - MCB UP Ltd SP - 230 EP - 232 Y2 - 2024/09/22 ER -