NEWS OF INDUSTRY

Anti-Corrosion Methods and Materials

ISSN: 0003-5599

Publication date: 1 July 1960

Abstract

Effluent Pipe Protection. A mile of 18‐in.‐diam. steel pipe was recently pulled into the Usk estuary to form the new pipeline for treated effluent from the Newport factory of Monsanto Chemicals Ltd. It replaces a cast‐iron outfall which was not large enough to handle the anticipated increase in the amount of treated effluent. The path of the new pipe runs from the shore near Goldcliffe to the discharge position 5,000 ft. out in the Channel to a point below the lowest predicted tide level.

Citation

(1960), "NEWS OF INDUSTRY", Anti-Corrosion Methods and Materials, Vol. 7 No. 7, pp. 230-232. https://doi.org/10.1108/eb019746

Download as .RIS

Publisher

:

MCB UP Ltd

Copyright © 1960, MCB UP Limited

Please note you might not have access to this content

You may be able to access this content by login via Shibboleth, Open Athens or with your Emerald account.
If you would like to contact us about accessing this content, click the button and fill out the form.
To rent this content from Deepdyve, please click the button.