PROTECTION ACHIEVEMENT: AT MANVERS MAIN COLLIERY

Anti-Corrosion Methods and Materials

ISSN: 0003-5599

Publication date: 1 December 1957

Abstract

Considerable interest is being shown in the protection problems solved in the exceptionally corrosive conditions at the Manvers Main Colliery of the National Coal Board near Doncaster. The large development works nearing completion are part of the work undertaken on 30 new collieries and 137 major reconstruction schemes either complete since vesting date, or in progress.

Citation

(1957), "PROTECTION ACHIEVEMENT: AT MANVERS MAIN COLLIERY", Anti-Corrosion Methods and Materials, Vol. 4 No. 12, pp. 420-422. https://doi.org/10.1108/eb019412

Publisher

:

MCB UP Ltd

Copyright © 1957, MCB UP Limited

To read the full version of this content please select one of the options below

You may be able to access this content by logging in via Shibboleth, Open Athens or with your Emerald account.
To rent this content from Deepdyve, please click the button.
If you think you should have access to this content, click the button to contact our support team.