TY - JOUR AB - Every plant that suffers from corrosion has to be checked regularly for thickness reduction, and the normal method of doing this has, until recently, been to shut down the plant, clean it out, and measure the areas of known or suspected weakness by mechanical means. By the use of the supersonic flaw detector, however, the time involved can be reduced to approximately 1½ days. VL - 2 IS - 11 SN - 0003-5599 DO - 10.1108/eb019122 UR - https://doi.org/10.1108/eb019122 PY - 1955 Y1 - 1955/01/01 TI - PRODUCTS AND PROCESSES T2 - Anti-Corrosion Methods and Materials PB - MCB UP Ltd SP - 355 EP - 361 Y2 - 2024/04/24 ER -