Public relations by leak … a £75 million rumour

Education + Training

ISSN: 0040-0912

Publication date: 1 May 1965

Abstract

People connected with training in the engineering industry have been waiting, almost with bated breath, for two announcements: that giving the name of the Director of the Engineering Industry Training Board and that formally stating the size of the levy. Readers will recall that we have returned, on several occasions, to the theme that the EITB has been playing the game with its cards too close to its chest and has seriously fallen down on the job of public relations. It now appears that we have been looking for our information in the wrong place; on Monday, 5th April, the Board's decision on both these vital matters was revealed in the centre of the front page of the Financial Times.

Citation

(1965), "Public relations by leak … a £75 million rumour", Education + Training, Vol. 7 No. 5, pp. 193-195. https://doi.org/10.1108/eb015561

Download as .RIS

Publisher

:

MCB UP Ltd

Copyright © 1965, MCB UP Limited

Please note you might not have access to this content

You may be able to access this content by login via Shibboleth, Open Athens or with your Emerald account.
If you would like to contact us about accessing this content, click the button and fill out the form.
To rent this content from Deepdyve, please click the button.