TY - JOUR AB - Introduction The traditional part which contractors have played in the past in the physical distribution process has been: VL - 4 IS - 3 SN - 0020-7527 DO - 10.1108/eb014312 UR - https://doi.org/10.1108/eb014312 AU - Fielding K.P.H. PY - 1974 Y1 - 1974/01/01 TI - The Contractor's Role in Physical Distribution T2 - International Journal of Physical Distribution PB - MCB UP Ltd SP - 176 EP - 182 Y2 - 2024/09/18 ER -