Table 1 represents a preliminary summary of the installed electrical load for a building. Such figures could well be found in a building with a reasonably high technology usage and a size of about 100 000 sq ft net usable space. It has been assumed that the occupancy rate would be 1:120 sq ft but the design could be in accordance with such other formulae that the brief indicated. Other loads would have been obtained by discussion with the important players such as the dataprocessing (DP) manager or director of technology. The loads would have been projected over the time‐scale that was the basis of the company's current planning programme.

Citation

Dukes, B. (1989), "ADAPTABLE ELECTRICAL INSTALLATIONS", Facilities, Vol. 7 No. 10, pp. 9-13. https://doi.org/10.1108/eb006510