To read this content please select one of the options below:

Demolition of Lee House

Structural Survey

ISSN: 0263-080X

Article publication date: 1 January 1989

96

Abstract

Summary This paper covers the demolitin of a 21‐storey office block in the City of London. It considers the reason for demolition, the possible methods, the chosen method, the management and health and safety aspects of a large city centre demolition.

Citation

Grice, I.M. (1989), "Demolition of Lee House", Structural Survey, Vol. 7 No. 1, pp. 38-44. https://doi.org/10.1108/eb006301

Publisher

:

MCB UP Ltd

Copyright © 1989, MCB UP Limited

Related articles