Cost versus faults ‐ the optimum balance in debugging
18
Abstract
John Hartley reports on a novel methodology for the reduction of stoppages in assembly equipment—and a teaching system
Citation
(1986), "Cost versus faults ‐ the optimum balance in debugging", Assembly Automation, Vol. 6 No. 1, pp. 40-42. https://doi.org/10.1108/eb004683
Publisher
:MCB UP Ltd
Copyright © 1986, MCB UP Limited