TY - JOUR AB - Considers the daily production‐scheduling problem in the “make‐to‐order” apparel‐manufacturing industry and presents a solution procedure for the problem based on the simulated annealing technique. The development is aimed at the quick generation of a feasible solution and the improvement on the solution. VL - 4 IS - 2/3 SN - 0955-6222 DO - 10.1108/eb002988 UR - https://doi.org/10.1108/eb002988 AU - Chen C. AU - Racine R. AU - Swift F. PY - 1992 Y1 - 1992/01/01 TI - A Practical Approach to the Apparel Production‐planning and Scheduling Problem T2 - International Journal of Clothing Science and Technology PB - MCB UP Ltd SP - 9 EP - 17 Y2 - 2024/03/28 ER -